Arroyo_Seco_Elec_Specs.pdf
PDF 245 KB Posted
- Solicitation number
- AG-9AB5-S-17-0047
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9AB5-S-17-0047_amend_1.pdf | ||
| RFIs_5.16.17.pdf | ||
| Project_Experience_Questionnaire.docx | DOCX document | |
| AG-9AB5-S-17-0047_Solicitation.pdf | ||
| FIRE_PLAN_FOR_CONSTRUCTION_AND_SERVICE_CONTRACTS.pdf | ||
| Arroyo_Seco_Location_Map.docx | DOCX document | |
| PPQ.docx | DOCX document | |
| ELECTRIC_LAYOUT.PDF | ||
| DBA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS INDEX
Division 1 - General Requirements Pages
SECTION 01010 - Summary of Work 5
SECTION 01014 - Coordination 1
SECTION 01060 - Regulatory Requirements 2
SECTION 01315 - Schedules & Reports 1
SECTION 01505 - Mobilization 1
Division 2 - Site Work
SECTION 02200- Earthwork 3
Division 16 – Electrical
SECTION 16000- Electrical 2
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SCOPE: This project consists of upgrading the electrical system (from the existing switchgear to the existing pump house) at the Arroyo Seco administrative site, in Monterey County, on the Monterey
Ranger District of the Los Padres National Forest.
The work shall include, but may not be limited to:
Remove and disposing of the existing wire from conduit.
Install 4/0 AWG, THW, 600V, Copper Wire, stranded (3,000 linear feet.) in existing conduit.
Install #2 AWG, THW, 600V, Copper wire, stranded (Ground) (1,500 linear feet) in the same exiting conduit.
Construct 200 linear feet 18”w x 24”d, install new 3” conduit and backfill and compact.
Replace 40A breaker at main switch gear with 70A/2, plug-in circuit breaker 10k ampere interrupt capacity, 240vac.
Install AC Automatic Booster Transformer 15KVA, Indoor.
The Contractor shall furnish all labor, equipment transportation, permits, testing and incidentals necessary for the performance of the work specified in this (SOW)
A. Existing conditions shall be verified by the Contractor.
1.2 MEASUREMENT AND PAYMENT
A. The work shall be measured for each item as listed below and as shown on the Schedule of
Items:
1. Lump Sum Quantity (LSQ) shall be measured as one job and shall include all mobilization, preparation work, new construction, site work, cleanup and the like.
2. Actual Quantity (AQ) shall be measured as the actual work completed as described in
Contract Specifications herein.
3. Design Quantity (DQ) shall be based upon the original design data available prior to advertising project. Original design data include the preliminary survey information, design assumptions, calculations, drawings and the presentation in the contract.
B. Payment: Payment for the quantity or unit, as measured above will be at the contract unit price as shown on the Schedule of Items. Payment will constitute full compensation for all labor, equipment, materials and incidentals necessary to complete the work described herein.
1.4 DAYS/HOURS OF OPERATION
A. The Contractor’s hours of operation shall be restricted to 7:30 am to 5:00 pm, Monday through
Friday. In addition the work shall be shut down during the following periods: Work shall be shut down on Saturdays, Sundays and all federally listed Holidays. Contract time has been adjusted to reflect these periods of shutdown.
1.5 CONTRACTOR’S SCHEDULE
A. The Contractor shall provide the Government with a complete work schedule describing the different work activities and when they will be initiated and completed at the Prework meeting.
The Contractor will be expected to follow this schedule during the course of the contract or shall submit a revised schedule within 48 hours of any unforeseen delays or changes.
1.6 EQUIPMENT CLEANING
A. To prevent the spread of non-native plant species and invasive weeds the following will be required.
1. All equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush guard assemblies shall be required.
2. Unless otherwise agreed, Contractor shall clean all vehicles and equipment before entry into the district unless Forest Service waives the cleaning requirement in writing.
Thereafter, all vehicles and equipment that leave the site must be cleaned prior to their re-entry, unless waived by the Forest Service. All cleaning of vehicles or equipment shall be done at sites agreed to by the Contracting Officer and the Contractor. The water used for washing shall be from a source in non-infected drainages. Forest Service will inspect all equipment prior to entry, as appropriate and determined necessary.
1.7 CONDITIONS OF WORK
A. Area of Work: The Contractor shall confine his operations to immediate work area.
B. The Contractor shall comply with all applicable local, state, and federal regulations pertaining to all areas of construction, including, but not limited to: Cal/OSHA, EPA and California
Department of Health Services.
C. Material Storage: The Contractor's material and equipment storage site shall be determined at the pre-construction meeting. The area shall be kept orderly and free of litter.
D. Sanitary Provisions: The government will not provide sanitary facilities.
E. Electric Power for Construction Purposes: Contractor must supply own electricity.
F. Water for Construction Purposes: The Government will supply a water source, located in close proximity to the project site. The contractor shall provide watering equipment and the means to fill the equipment from the water source and transport it to the site. Government furnished water for the project will not exceed 5,000 gallons.
Government provided water dependent on availability. If water shortage for the Government operations occurs at the site (as determined by the CO), the Contractor shall furnish water necessary to complete the project at no additional cost to the Government.
END OF SECTION
SECTION 01014
COORDINATION
PART 1 – GENERAL
1.1 SCOPE
This section identifies Contractor and Government responsibilities for coordinating contract work with other governmental entities, utility companies, adjacent land users and other contractors.
1.2 RELATED SECTIONS
General Provisions FAR 52.236-7, Permits and Responsibilities.
General Provisions FAR 52.236-8, Other Contracts.
General Provisions FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
General Provisions FAR 52.236-10, Operations and Storage Areas.
General Provisions FAR 52.236-19, Organization and Direction of the Work.
1.3 CONTRACTOR RESPONSIBILITIES
A. Submit Work Progress Schedule (see FAR 52.236-15).
B. Arrange for and bear the cost of temporary utilities and services from public utilities, if desired.
C. Obtain and pay for minor, temporary permits and services necessary for demolition activities.
D. Coordinate with public utility companies for protection of existing utilities, including requesting "Blue Stake" location service in advance of any ground-disturbing activities.
E. Coordinate with utility companies for permanent disconnection of services decommissioned under this contract.
F. Obtain necessary septic system abandonment permits.
G. Coordinate access and construction activities under this contract with any other contractors working adjacent to the project site.
H. Coordinate with Forest Service at the project site during demolition activities which disrupt access at the site.
I. Notify Contracting Officer and Forest Service personnel at site 48 hours in advance of any utility interruption to the site and adjacent sites.
J. Additional coordination if needed, shall be brought to the attention of the Contracting Officer.
SECTION 01060
REGULATORY REQUIREMENTS
PART 1 – GENERAL
1.1 SCOPE
A. This Section describes the Regulatory Requirements and the Codes and Standards that apply to the work in this contract.
1.2 REGULATORY REQUIREMENTS
A. All laws, ordinances, codes, and regulations of the United States Government shall apply and be implemented into this contract.
B. The following codes and standards shall apply to the work in this contract. Where no date is specified, the applicable edition shall be the one in effect on the date of solicitation.
1. Forest Service Handbook 6709.11 Health and Safety Code Handbook.
2. Forest Service “Water Quality Management for Forest System Lands in California Best
Management Practices” Numbers 12.2-12.22
3. Manual on Uniform Traffic Control Devices.
4. State of California Construction Safety Orders.
5. Local Government ordinances and laws
6. All Uniform Codes
7. Cal/OSHA (Occupational Safety and Health Administration)
8. EPA (Environmental Protection Agency)
9. California Department of Health Services
1.3 CODES AND STANDARDS
A. Standards and practices set forth by the references mentioned elsewhere in these specifications shall be adhered to unless otherwise noted.
1.4 DUTIES OF THE CONTRACTOR
A. Responsibilities: It is the duty of the Contractor to complete the work covered by this contract in accordance with the approved plans and specifications therefor.
B. Performance of the work: The Contractor shall study carefully the approved plans and specifications and shall plan their schedule of operations well ahead of time. If at any time it is discovered that work is being done which is not in accordance with the approved plans and specifications, the Contractor shall correct the work immediately. All inconsistencies or items which appear to be in error in the contract documents shall be promptly called to the attention of the Contracting Officer. Local conditions which may affect the scope of this contract shall likewise be brought to the attention of the Contracting Officer at once. In no case, however, shall the instruction of the Contracting Officer be construed to cause work to be done which is not in conformity with the approved plans and specifications.
The Contractor shall not carry on work except with the knowledge of the Contrating Officer.
Subcontractors engaged to do work on the project must be approved by the Contracting
Officer.
1.5 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work of this Section.
PART 2 – PRODUCTS
2.1 PRODUCTS AND MATERIALS
All products and materials used in this Contract shall meet the standards and requirements of the codes and standards referenced in Part 1 - General of this Section
All materials, unless specified otherwise, shall be handled, stored, installed, and maintained in accordance with the manufacturer's instructions and recommendations.
PART 3 – EXECUTION
3.01 WORK REQUIREMENTS
A. All work in the contract shall meet the standards and requirements of the codes and standards referenced in Part 1 - General of this Section and elsewhere herein. When more stringent requirements are called out in these specifications, the more stringent requirements shall take precedence over the codes and standards. All work shall be performed in a workman-like manner according to the best practices of the trade and the best standards of the industry.
SECTION 01315
SCHEDULES AND REPORTS
PART 1 – GENERAL
1.1 SCOPE
A. This Section includes the requirements for the submittal of the Contractor's proposed work schedule for the project and a breakdown of the Contractor's bid amount for purposes of making progress payments.
PART 2 – PRODUCTS
2.1 SUBMITTALS: The submittals of the work schedule and cost breakdown shall be on paper and shall include three copies of each.
PART 3 – EXECUTION
3.1 WORK SCHEDULE
A. At the pre-work meeting, the Contractor shall submit to the Contracting Officer for approval a proposed work schedule for the project. Such schedule shall be in the form of a critical path network or other approved format and shall include the timing for each major phase of the work. The Contractor shall update such approved schedule as necessary when significant changes occur during the progress of the work.
Include in the critical path schedule time for submissions and approval of substitutions as well as tests and inspections.
3.2 COST BREAK DOWN ( SCHEDULE OF VALUES):
A. At the pre-work meeting, the Contractor shall submit to the Contracting Officer for approval, a detailed cost breakdown of the lump sum bid for the purpose of making progress payments.
Such breakdown shall include each separate phase of the work but need not separate labor from material costs. The approved cost breakdown will constitute the basis under which progress payments will be made.
1. Cost for Work required by each Section.
2. Costs for a portion of the Work required by a Section when required for proper division of payment.
The detailed cost breakdown should include a description of work, number of units, cost per unit and total amount for each work item.
SECTION 01505
MOBILIZATION
PART 1 - GENERAL
1.1 SCOPE
A. This work consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
1.2 MEASUREMENT AND PAYMENT
A. The accepted quantities will be paid for at the contract unit price for item 01505 Mobilization.
B. Progress payments will be made as follows:
1. The Government will pay to the Contractor in the first progress payment the total premium paid by the Contractor to obtain bonds. This payment shall not be in addition to the contract price and will be included in Item 01505, Mobilization.
2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
4. Upon completion of all work on the project, any unpaid amount for item 01505, Mobilization, will be paid.
C. The total of all payments will not exceed the original contract amount for item 01505, Mobilization.
SECTION 02200
EARTHWORK
PART 1 - GENERAL
1.1 SCOPE
A. This work consists of all excavation, borrow, placement, compaction, rough grading, and finish grading of the decommissioning site areas, restoring to a natural ground condition and conforming with the existing terrain. Earthwork shall include but is not limited to the following:
1. Excavate to levels and lines as required to provide slope restoration to original ground contouring and to conform with adjacent terrain.
2. Excavate, haul, and place the approved off-site borrow material to elevations and grades.
3. Removal of unsuitable material and replacement with acceptable material.
4. Compaction.
5. Rough and finish grading to levels and lines.
6. Prevention of erosion, sedimentation and maintain dust control.
1.2 VERIFICATION OF CONDITIONS
A. The Contractor shall carefully examine existing conditions and information, shall become familiar with the nature and location of the work, the conformation of the ground slopes and terrain, the nature of subsoil conditions, groundwater conditions, nature and extent of materials that will be encountered during construction operations and any existing site conditions that may affect the project, prior to the beginning of work.
1.3 MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for the work specified in this section
PART 2 – PRODUCTS
2.1 SITE BORROW MATERIAL: Imported borrow material shall be nonexpansive and predominantly granular soil or soil rock mixture which is free from organic matter and other deleterious materials and rocks over 6" in diameter. The borrow source locations will be approved by the Contracting Officer.
PART 3 – EXECUTION
3.1 CONTROL OF WATER: The Contractor shall furnish, maintain, and operate all necessary machinery, appliances, and equipment to keep the excavation free of water until the placement of borrow material has been completed. Quality control for excavation and compaction operations shall be the responsibility of the Contractor.
3.2 COMPACTION CONTROL
A. Embankment or borrow material shall be placed and compacted at a moisture content suitable for the required compaction. No embankment or borrow material shall be placed when free water is standing on the surface of the area where the embankment is to be placed and no compaction of material will be permitted with free water on any point of the surface of the embankment to be compacted. Any embankment or borrow containing organic materials or other unacceptable material previously described shall be removed and replaced with approved embankment or borrow material prior to compaction.
B. Unless otherwise specified, all backfill not accessible to roller compaction shall be compacted by power tampers or vibratory compactors or other approved means to comply with the requirements for Layer Placement compaction as specified.
Layer Placement: Surfaces steeper than a ratio of 3 horizontal to 1 vertical upon which embankment is to be placed, shall be roughened or stepped to provide a permanent bonding of new and old materials. Embankment shall be layer placed, except over rock surfaces, in which case material may be placed by end dumping to a minimum depth needed for operation of spreading equipment. Each embankment layer shall be leveled and smoothed before placement of subsequent layers. Hauling and spreading equipment shall be operated uniformly over the full width of each layer.
Suitable material shall be placed in layers no more than 8 inches thick, except when the material contains rock more than 6 inches in diameter, in which case layers may be of sufficient thickness to accommodate the material involved. No layer shall exceed 12 inches before compaction.
Where material containing large amounts of rock is used to construct embankments, the layers may be of sufficient thickness to accommodate the material involved. A solid embankment with adequate compaction shall be constructed by working smaller rock and fines in with the larger rocks to fill the voids and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed. Such rocks shall be at least 4 inches below the surface of the subgrade.
Material shall be at a moisture content suitable to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment.
3.3 BORROW MATERIAL: If in the process of fulfilling the grading and backfill requirements of this specification, a deficit of material results, the Contractor shall import suitable material from a source approved by the Contracting Officer.
3.4 GRADING: All areas covered by the project, including excavated and embankment areas and adjacent transition areas, shall be uniformly graded. Areas to receive topsoil (borrow material) shall be graded to allow for such material in the finished elevations. Finished surfaces shall be reasonably smooth, compacted and free from surface irregularities that would affect drainage.
Channels or swales shall be constructed to provide proper surface drainage.
3.5 TESTING
A. Embankment materials are required to be placed using the Layer Placement method for compaction as specified in this contract. Any specified tests shall be the basis upon which satisfactory completion of work will be judged. Any area or portion thereof that does not meet minimum density requirements shall be reworked and recompacted until it meets the project density requirements and approved by the Contracting Officer.
SECTION 16000
ELECTRICAL
PART 1 - GENERAL
1.1 SCOPE
A. This section includes furnishing and installing all electrical work for this contract.
PART 2 – PRODUCTS
2.2 Conduit
A. Unless otherwise required by NEC or specified in other Sections, the following types of conduits shall be used in the following locations:
1. All above ground locations: EMT or liquid-tight flexible metal
2. All underground locations: HDPVC
B. All conduits shall have bushings on both ends, or fitting having equivalent abrasion protection with adaptors to different materials.
C. All conduits shall be bent using the proper tools and methods, and shall show good workmanship with no kinks or flattening.
D. All conduits shall be installed level, plumb, at right angles to building lines, and with offsets at all boxes, panels, etc., and as required.
E. All conduit runs shall be complete and free of dirt or debris shall be swabbed clean prior to installing conductors.
2.2 Conductors. Conductors shall be copper only, 600 volt, type THWN and shall be marked at regular intervals with the manufacturer’s name type, voltage, and size.
A. Neutral conductors shall have continuous white insulation. End marking with white phase tape will not be accepted.
B. Skinning or cutting off enough contractor strands to allow a conductor to fit into a termination devise will not be accepted.
C. Where the insulation on conductors is damaged during the installation, the conductor so damaged shall be removed and new conductors installed.
2.3 Fittings shall be approved for Class I Division hazardous location use.
2.4 Seal-off compound shall be type used specifically for purpose.
2.5 Unused Openings: All unused openings in panels, boxes, etc. shall be closed by the use of knock-out seals or similar items manufactured for the purpose.
PART 3 – EXECUTION
3.1 Conduit requiring bends in tight locations shall be made by fittings or by manufactured short radius elbows.
3.2 Location of work SHOWN ON THE DRAWINGS is approximate; the Contractor shall study the work in relation to the spaces and equipment surrounding the work.
3.3 Wiring shall be protected during demolition. Damaged wiring shall be replaced with wiring having no splices between pull boxes.
3.4 Tests shall be performed as necessary by the Contractor upon completion of the electrical work to demonstrate the completeness and accuracy of his work. All tests shall be performed in the presence of the Contracting Officer or authorized representative.