AG-9AB5-S-17-0047_Solicitation.pdf

PDF 407 KB Posted

Attached to
Arroyo Seco Electrical Upgrade, Los Padres National Forest
Solicitation number
AG-9AB5-S-17-0047
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
AG-9AB5-S-17-0047_amend_1.pdf PDF
RFIs_5.16.17.pdf PDF
Project_Experience_Questionnaire.docx DOCX document
FIRE_PLAN_FOR_CONSTRUCTION_AND_SERVICE_CONTRACTS.pdf PDF
Arroyo_Seco_Location_Map.docx DOCX document
Arroyo_Seco_Elec_Specs.pdf PDF
PPQ.docx DOCX document
ELECTRIC_LAYOUT.PDF PDF
DBA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

851529

USDA FOREST SERVICE

R5 SO-CAL ACQ SERVICE AREA SCASA

701 N SANTA ANITA AVE

ARCADIA CA 91006

9AB5

Vincent Chua

701 N Santa Anita Ave.

Arcadia, CA 91006

VINCENT CHUA 626-574-5326

1x 04/20/2017

AG-9AB5-S-17-0047

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Arroyo Seco Electrical Upgrade

This project consists of upgrading the electrical system (from the existing switchgear to the existing pump house) at the Arroyo Seco administrative site, in

Monterey County, on the Monterey Ranger District of the Los Padres National Forest.

Pursuant to 40 U.S.C 3132 and FAR Part 52.228-13,a payment bond shall be required if the construction award exceeds $35,000. The bond must be from an approved source.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

05/22/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

R5 SO-CAL ACQ SERVICE AREA SCASA

701 N SANTA ANITA AVE

ARCADIA CA 91006

9AB5

VINCENT CHUA

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 53

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-9AB5-S-17-0047

FOB: Destination

Period of Performance: 06/15/2017 to 08/14/2017

001 Arroyo Seco Electrical Upgrade

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

AG-9AB5-S-17-0047 Page 4 of 53

QUOTER COVER SHEET/CHECKLIST

This requirement is being procured under Part 15

PROPOSALS ARE TO BE RECEIVED BY THE DUE DATE AND TIME.

NO PAPER DOCUMENTS OVER 8 ½ X 11, AND NO BROCHURES ARE TO BE SUBMITTED AS PART OF YOUR

QUOTE.

OFFERORS ARE TO RETURN to the address in Block 5 of the SF 1442:

1. Completed SF 1442

2. Completed Part 1- The Schedule (Pricing)

3. Addressed Evaluation Factors

4. This page with the following questions answered:

HAVE YOU OBTAINED A DUNS NUMBER?____________________________________

WHAT IS YOUR DUNS NUMBER?_____________________________________________

ARE YOU REGISTERED IN SAM?

Have you completed your annual recertification requirements?________ https://www.sam.gov/portal/public/SAM/

There is no fee to register on the official government web site.

Is your banking information correct and current in SAM?___________________

NOTE: Failure to obtain a DUNS number and register in SAM by the quotation due date will result in the quoter being ineligible for award of a contract. Quoters are encouraged to promptly obtain a DUNS number and register in SAM now, if submitting a quotation to this solicitation.

HAVE YOU READ THE STATEMENT OF WORK AND ADDRESSED ALL OF THE SUBMITTAL

INFORMATION AND EVALUATION INFORMATION?____________

ACKNOWLEDGE AMENDMENTS (See amendments for proper acknowledgement)

AG-9AB5-S-17-0047 Page 5 of 53

SECTION A - Solicitation/Contract Form

NOTICE TO CONTRACTOR – Superintendent Requirement

The Government will hold the Contractor in strict compliance of 52.236-6, Superintendence by the Contractor, contained herein Section A. After issuance of the award and prior to issuance of the Notice to Proceed, the Contractor shall submit to the Government the name and qualifications of the Superintendent on the Contractor’s official letterhead. The Superintendent shall be a current employee on the Contractor’s payroll; or the Contractor shall hire the Superintendent with the intent of the Contractor issuing an IRS form 1099-Misc. The Superintendent shall not be an employee of the Subcontractor that is hired by the Contractor to perform the work. The Contractor shall incorporate this cost into the proposal prior to submitting it to the Government. Failure of the Contractor to comply with this requirement will be subject to termination.

NOTICE TO CONTRACTOR – Construction Schedule

The Contractor shall submit to the Government a construction schedule which clearly identifies the Critical Path Method (CPM) and the percentage of work completed. The Contractor may use any industry software or published document that will incorporate these elements into the schedule. The Contractor shall submit the construction schedule in strict compliance with 52.236-15, Schedules for Construction Contracts, contained herein Section A.

Commencement, Prosecution, and Completion of Work. (APR 1984) 52.211-10

The Contractor shall be required to (a) commence work under this contract within 10 ten calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than sixty (60) calendar days. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-27

Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-5

Performance of Work by the Contractor. (APR 1984) 52.236-1

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 100% of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of Clause)

Differing Site Conditions. (APR 1984) 52.236-2

(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of -

(1) Subsurface or latent physical conditions at the site which differ materially from those indicated in this contract;

or

(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract

(b) The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.

AG-9AB5-S-17-0047 Page 6 of 53

(c) No request by the Contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the Contractor has given the written notice required; provided, that the time prescribed in paragraph (a) of this clause for giving written notice may be extended by the Contracting Officer.

(d) No request by the Contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.

(End of Clause)

Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-3

(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

(End of Clause)

Superintendence by the Contractor. (APR 1984) 52.236-6

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

(End of Clause)

Schedules for Construction Contracts. (APR 1984) 52.236-15

(a) The Contractor shall, within three (3) days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained. (c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by

AG-9AB5-S-17-0047 Page 7 of 53 the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of Clause)

Layout of Work. (APR 1984) 52.236-17

The Contractor shall lay out its work from Government established base lines and bench marks indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(End of Clause)

Default (Fixed-Price Construction). (APR 1984) 52.249-10

(a) If the Contractor refuses or fails to prosecute the work or any separable part, with the diligence that will insure its completion within the time specified in this contract including any extension, or fails to complete the work within this time, the Government may, by written notice to the Contractor, terminate the right to proceed with the work (or the separable part of the work) that has been delayed. In this event, the Government may take over the work and complete it by contract or otherwise, and may take possession of and use any materials, appliances, and plant on the work site necessary for completing the work. The Contractor and its sureties shall be liable for any damage to the Government resulting from the Contractor's refusal or failure to complete the work within the specified time,whether or not the Contractor's right to proceed with the work is terminated. This liability includes any increased costs incurred by the Government in completing the work.

(b) The Contractor's right to proceed shall not be terminated nor the Contractor charged with damages under this clause, if -

(1) The delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include -

(i) Acts of God or of the public enemy,

(ii) Acts of the Government in either its sovereign or contractual capacity,

(iii) Acts of another Contractor in the performance of a contract with the Government,

(iv) Fires,

(v) Floods,

(vi) Epidemics,

(vii) Quarantine restrictions,

(viii) Strikes,

(ix) Freight embargoes,

(x) Unusually severe weather, or

(xi) Delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers; and

(2) The Contractor, within 10 days from the beginning of any delay (unless extended by the Contracting Officer), notifies the Contracting Officer in writing of the causes of delay. The Contracting Officer shall ascertain the facts and the extent of delay. If, in the judgment of the Contracting Officer, the findings of fact warrant such action, the time for completing the work shall be extended. The findings of the Contracting Officer shall be final and conclusive on the parties, but subject to appeal under the Disputes clause. c) If, after termination of the Contractor's right to proceed, it is determined that the Contractor was not in default, AG-9AB5-S-17-0047 Page 8 of 53 or that the delay was excusable, the rights and obligations of the parties will be the same as if the termination had been issued for the convenience of the Government.

(d) The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

(End of Clause)

Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) 52.222-23

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for Each Trade: 5%

Goals for Female Participation for Each Trade: 5%

These goals are applicable to all of the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on

(1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled Affirmative Action Compliance Requirements for Construction, and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4.

Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S.

Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the -

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the covered area is San Bernardino National Forest, San Bernardino County.

(End of Clause)

AG-9AB5-S-17-0047 Page 9 of 53

SECTION B - Supplies or Services and Prices/Costs

Schedule of items

BIDDERS PLEASE NOTE: BEFORE PREPARING PROPOSAL, CAREFULLY READ THE CONTENTS OF THIS

SOLICITATION.

BIDDERS ARE FURTHER CAUTIONED TO INSPECT THE CONSTRUCTION SITE.

ITEM NO. SPEC ITEM

NO.

DESCRIPTI

ON

METHOD OF

MEAS.

ESTD QNTY UNIT UNIT PRICE AMOUNT

Base Bid:

Arroyo Seco 1 01505 Mobilization LSQ 1 JOB 2 16000 4/0 AWG, THW, 600v, Copper wire, stranded

LF 3000 JOB

3 16000 #2 AWG, THW, 600v, Copper wire, stranded (Ground)

LF 1500 JOB

4 16000 70A/2, Plug-in circuit breaker, 10k ampere interrupt capacity, 240vac

EA 1 JOB

5 16000 AC Automatic Booster Transformer 15 KVA, Indoor

EA 1 JOB

6 16000 2" PVC conduit LF 200 JOB 7 02200 Trenching, Backfill, tamped 18" x 24" deep

LF 200 JOB

Total Base Bid

NOTE: ANY AWARD WILL BE TO ONE BIDDER

BIDS ON ANY ITEMS AND SUB-ITEMS ARE FOR PROCESSING PAYMENTS.

IF BIDS ARE NOT SUBMITTED ON ANY ITEMS AND SUB-ITEMS, BID MAY BE CONSIDERED NON-RESPONSIVE.

AG-9AB5-S-17-0047 Page 10 of 53

SECTION C - Description/Specifications/Statement of Work

SPECIFICATIONS INDEX

Division 1 - General Requirements Pages SECTION 01010 - Summary of Work 5 SECTION 01014 - Coordination 1 SECTION 01060 - Regulatory Requirements 2 SECTION 01315 - Schedules & Reports 1 SECTION 01505 - Mobilization 1

Division 2 - Site Work SECTION 02200- Earthwork 3

Division 16 – Electrical SECTION 16000- Electrical 2

AG-9AB5-S-17-0047 Page 11 of 53

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE: This project consists of upgrading the electrical system (from the existing switchgear to the existing pump house) at the Arroyo Seco administrative site, in Monterey County, on the Monterey Ranger District of the Los Padres National Forest.

The work shall include, but may not be limited to:

Remove and disposing of the existing wire from conduit.

Install 4/0 AWG, THW, 600V, Copper Wire, stranded (3,000 linear feet.) in existing conduit.

Install #2 AWG, THW, 600V, Copper wire, stranded (Ground) (1,500 linear feet) in the same exiting conduit.

Construct 200 linear feet 18”w x 24”d, install new 3” conduit and backfill and compact.

Replace 40A breaker at main switch gear with 70A/2, plug-in circuit breaker 10k ampere interrupt capacity, 240vac.

Install AC Automatic Booster Transformer 15KVA, Indoor.

The Contractor shall furnish all labor, equipment transportation, permits, testing and incidentals necessary for the performance of the work specified in this (SOW)

A. Existing conditions shall be verified by the Contractor.

1.2 MEASUREMENT AND PAYMENT

A. The work shall be measured for each item as listed below and as shown on the Schedule of Items:

1. Lump Sum Quantity (LSQ) shall be measured as one job and shall include all mobilization, preparation work, new construction, site work, cleanup and the like.

2. Actual Quantity (AQ) shall be measured as the actual work completed as described in Contract Specifications herein.

3. Design Quantity (DQ) shall be based upon the original design data available prior to advertising project. Original design data include the preliminary survey information, design assumptions, calculations, drawings and the presentation in the contract.

B. Payment: Payment for the quantity or unit, as measured above will be at the contract unit price as shown on the Schedule of Items. Payment will constitute full compensation for all labor, equipment, materials and incidentals necessary to complete the work described herein.

1.4 DAYS/HOURS OF OPERATION

A. The Contractor’s hours of operation shall be restricted to 7:30 am to 5:00 pm, Monday through Friday. In addition the work shall be shut down during the following periods: Work shall be shut down on Saturdays, Sundays and all federally listed Holidays. Contract time has been adjusted to reflect these periods of shutdown.

1.5 CONTRACTOR’S SCHEDULE

A. The Contractor shall provide the Government with a complete work schedule describing the different work activities and when they will be initiated and completed at the Prework meeting. The Contractor will be expected to

AG-9AB5-S-17-0047 Page 12 of 53 follow this schedule during the course of the contract or shall submit a revised schedule within 48 hours of any unforeseen delays or changes.

1.6 EQUIPMENT CLEANING

A. To prevent the spread of non-native plant species and invasive weeds the following will be required.

1. All equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush guard assemblies shall be required.

2. Unless otherwise agreed, Contractor shall clean all vehicles and equipment before entry into the district unless Forest Service waives the cleaning requirement in writing. Thereafter, all vehicles and equipment that leave the site must be cleaned prior to their re-entry, unless waived by the Forest Service. All cleaning of vehicles or equipment shall be done at sites agreed to by the Contracting Officer and the Contractor. The water used for washing shall be from a source in non-infected drainages. Forest Service will inspect all equipment prior to entry, as appropriate and determined necessary.

1.7 CONDITIONS OF WORK

A. Area of Work: The Contractor shall confine his operations to immediate work area.

B. The Contractor shall comply with all applicable local, state, and federal regulations pertaining to all areas of construction, including, but not limited to: Cal/OSHA, EPA and California Department of Health Services.

C. Material Storage: The Contractor's material and equipment storage site shall be determined at the pre-construction meeting. The area shall be kept orderly and free of litter.

D. Sanitary Provisions: The government will not provide sanitary facilities.

E. Electric Power for Construction Purposes: Contractor must supply own electricity.

F. Water for Construction Purposes: The Government will supply a water source, located in close proximity to the project site. The contractor shall provide watering equipment and the means to fill the equipment from the water source and transport it to the site. Government furnished water for the project will not exceed 5,000 gallons.

Government provided water dependent on availability. If water shortage for the Government operations occurs at the site (as determined by the CO), the Contractor shall furnish water necessary to complete the project at no additional cost to the Government.

END OF SECTION

AG-9AB5-S-17-0047 Page 13 of 53

SECTION 01014

COORDINATION

PART 1 – GENERAL

1.1 SCOPE

This section identifies Contractor and Government responsibilities for coordinating contract work with other governmental entities, utility companies, adjacent land users and other contractors.

1.2 RELATED SECTIONS

General Provisions FAR 52.236-7, Permits and Responsibilities.

General Provisions FAR 52.236-8, Other Contracts.

General Provisions FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

General Provisions FAR 52.236-10, Operations and Storage Areas.

General Provisions FAR 52.236-19, Organization and Direction of the Work.

1.3 CONTRACTOR RESPONSIBILITIES

A. Submit Work Progress Schedule (see FAR 52.236-15).

B. Arrange for and bear the cost of temporary utilities and services from public utilities, if desired.

C. Obtain and pay for minor, temporary permits and services necessary for demolition activities.

D. Coordinate with public utility companies for protection of existing utilities, including requesting "Blue Stake" location service in advance of any ground-disturbing activities.

E. Coordinate with utility companies for permanent disconnection of services decommissioned under this contract.

F. Obtain necessary septic system abandonment permits.

G. Coordinate access and construction activities under this contract with any other contractors working adjacent to the project site.

H. Coordinate with Forest Service at the project site during demolition activities which disrupt access at the site.

I. Notify Contracting Officer and Forest Service personnel at site 48 hours in advance of any utility interruption to the site and adjacent sites.

J. Additional coordination if needed, shall be brought to the attention of the Contracting Officer.

AG-9AB5-S-17-0047 Page 14 of 53

SECTION 01060

REGULATORY REQUIREMENTS

PART 1 – GENERAL

1.1 SCOPE

A. This Section describes the Regulatory Requirements and the Codes and Standards that apply to the work in this contract.

1.2 REGULATORY REQUIREMENTS

A. All laws, ordinances, codes, and regulations of the United States Government shall apply and be implemented into this contract.

B. The following codes and standards shall apply to the work in this contract. Where no date is specified, the applicable edition shall be the one in effect on the date of solicitation.

1. Forest Service Handbook 6709.11 Health and Safety Code Handbook.

2. Forest Service “Water Quality Management for Forest System Lands in California Best Management Practices” Numbers 12.2-12.22

3. Manual on Uniform Traffic Control Devices.

4. State of California Construction Safety Orders.

5. Local Government ordinances and laws

6. All Uniform Codes

7. Cal/OSHA (Occupational Safety and Health Administration)

8. EPA (Environmental Protection Agency)

9. California Department of Health Services

1.3 CODES AND STANDARDS

A. Standards and practices set forth by the references mentioned elsewhere in these specifications shall be adhered to unless otherwise noted.

1.4 DUTIES OF THE CONTRACTOR

A. Responsibilities: It is the duty of the Contractor to complete the work covered by this contract in accordance with the approved plans and specifications therefor.

B. Performance of the work: The Contractor shall study carefully the approved plans and specifications and shall plan their schedule of operations well ahead of time. If at any time it is discovered that work is being done which is not in accordance with the approved plans and specifications, the Contractor shall correct the work immediately. All inconsistencies or items which appear to be in error in the contract documents shall be promptly called to the attention of the Contracting Officer. Local conditions which may affect the scope of this contract shall likewise be brought to

AG-9AB5-S-17-0047 Page 15 of 53 the attention of the Contracting Officer at once. In no case, however, shall the instruction of the Contracting Officer be construed to cause work to be done which is not in conformity with the approved plans and specifications.

The Contractor shall not carry on work except with the knowledge of the Contracting Officer.

Subcontractors engaged to do work on the project must be approved by the Contracting Officer.

1.5 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the work of this Section.

PART 2 – PRODUCTS

2.1 PRODUCTS AND MATERIALS

All products and materials used in this Contract shall meet the standards and requirements of the codes and standards referenced in Part 1 - General of this Section

All materials, unless specified otherwise, shall be handled, stored, installed, and maintained in accordance with the manufacturer's instructions and recommendations.

PART 3 – EXECUTION

3.01 WORK REQUIREMENTS

A. All work in the contract shall meet the standards and requirements of the codes and standards referenced in Part 1 - General of this Section and elsewhere herein. When more stringent requirements are called out in these specifications, the more stringent requirements shall take precedence over the codes and standards. All work shall be performed in a workman-like manner according to the best practices of the trade and the best standards of the industry.

END OF SECTION

SECTION 01315

SCHEDULES AND REPORTS

PART 1 – GENERAL

1.1 SCOPE

A. This Section includes the requirements for the submittal of the Contractor's proposed work schedule for the project and a breakdown of the Contractor's bid amount for purposes of making progress payments.

PART 2 – PRODUCTS

2.1 SUBMITTALS: The submittals of the work schedule and cost breakdown shall be on paper and shall include three copies of each.

PART 3 – EXECUTION

3.1 WORK SCHEDULE

A. At the pre-work meeting, the Contractor shall submit to the Contracting Officer for approval a proposed work schedule for the project. Such schedule shall be in the form of a critical path network or other approved format and

AG-9AB5-S-17-0047 Page 16 of 53 shall include the timing for each major phase of the work. The Contractor shall update such approved schedule as necessary when significant changes occur during the progress of the work.

Include in the critical path schedule time for submissions and approval of substitutions as well as tests and inspections.

3.2 COST BREAK DOWN (SCHEDULE OF VALUES):

A. At the pre-work meeting, the Contractor shall submit to the Contracting Officer for approval, a detailed cost breakdown of the lump sum bid for the purpose of making progress payments. Such breakdown shall include each separate phase of the work but need not separate labor from material costs. The approved cost breakdown will constitute the basis under which progress payments will be made.

1. Cost for Work required by each Section.

2. Costs for a portion of the Work required by a Section when required for proper division of payment.

The detailed cost breakdown should include a description of work, number of units, cost per unit and total amount for each work item.

END OF SECTION

SECTION 01505

MOBILIZATION

PART 1 - GENERAL

1.1 SCOPE

A. This work consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

1.2 MEASUREMENT AND PAYMENT

A. The accepted quantities will be paid for at the contract unit price for item 01505 Mobilization.

B. Progress payments will be made as follows:

1. The Government will pay to the Contractor in the first progress payment the total premium paid by the Contractor to obtain bonds. This payment shall not be in addition to the contract price and will be included in Item 01505, Mobilization.

2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

4. Upon completion of all work on the project, any unpaid amount for item 01505, Mobilization, will be paid.

C. The total of all payments will not exceed the original contract amount for item 01505, Mobilization.

AG-9AB5-S-17-0047 Page 17 of 53

SECTION 02200

EARTHWORK

PART 1 - GENERAL

1.1 SCOPE

A. This work consists of all excavation, borrow, placement, compaction, rough grading, and finish grading of the decommissioning site areas, restoring to a natural ground condition and conforming with the existing terrain.

Earthwork shall include but is not limited to the following:

1. Excavate to levels and lines as required to provide slope restoration to original ground contouring and to conform with adjacent terrain.

2. Excavate, haul, and place the approved off-site borrow material to elevations and grades.

3. Removal of unsuitable material and replacement with acceptable material.

4. Compaction.

5. Rough and finish grading to levels and lines.

6. Prevention of erosion, sedimentation and maintain dust control.

1.2 VERIFICATION OF CONDITIONS

A. The Contractor shall carefully examine existing conditions and information, shall become familiar with the nature and location of the work, the conformation of the ground slopes and terrain, the nature of subsoil conditions, groundwater conditions, nature and extent of materials that will be encountered during construction operations and any existing site conditions that may affect the project, prior to the beginning of work.

1.3 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the work specified in this section

PART 2 – PRODUCTS

2.1 SITE BORROW MATERIAL: Imported borrow material shall be nonexpansive and predominantly granular soil or soil rock mixture which is free from organic matter and other deleterious materials and rocks over 6" in diameter.

The borrow source locations will be approved by the Contracting Officer.

PART 3 – EXECUTION

3.1 CONTROL OF WATER: The Contractor shall furnish, maintain, and operate all necessary machinery, appliances, and equipment to keep the excavation free of water until the placement of borrow material has been completed.

Quality control for excavation and compaction operations shall be the responsibility of the Contractor.

3.2 COMPACTION CONTROL

A. Embankment or borrow material shall be placed and compacted at a moisture content suitable for the required compaction. No embankment or borrow material shall be placed when free water is standing on the surface of the area where the embankment is to be placed and no compaction of material will be permitted with free water on any point of the surface of the embankment to be compacted. Any embankment or borrow containing organic materials or other

AG-9AB5-S-17-0047 Page 18 of 53 unacceptable material previously described shall be removed and replaced with approved embankment or borrow material prior to compaction.

B. Unless otherwise specified, all backfill not accessible to roller compaction shall be compacted by power tampers or vibratory compactors or other approved means to comply with the requirements for Layer Placement compaction as specified.

Layer Placement: Surfaces steeper than a ratio of 3 horizontal to 1 vertical upon which embankment is to be placed, shall be roughened or stepped to provide a permanent bonding of new and old materials. Embankment shall be layer placed, except over rock surfaces, in which case material may be placed by end dumping to a minimum depth needed for operation of spreading equipment. Each embankment layer shall be leveled and smoothed before placement of subsequent layers. Hauling and spreading equipment shall be operated uniformly over the full width of each layer.

Suitable material shall be placed in layers no more than 8 inches thick, except when the material contains rock more than 6 inches in diameter, in which case layers may be of sufficient thickness to accommodate the material involved.

No layer shall exceed 12 inches before compaction.

Where material containing large amounts of rock is used to construct embankments, the layers may be of sufficient thickness to accommodate the material involved. A solid embankment with adequate compaction shall be constructed by working smaller rock and fines in with the larger rocks to fill the voids and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed. Such rocks shall be at least 4 inches below the surface of the subgrade.

Material shall be at a moisture content suitable to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment.

3.3 BORROW MATERIAL: If in the process of fulfilling the grading and backfill requirements of this specification, a deficit of material results, the Contractor shall import suitable material from a source approved by the Contracting Officer.

3.4 GRADING: All areas covered by the project, including excavated and embankment areas and adjacent transition areas, shall be uniformly graded. Areas to receive topsoil (borrow material) shall be graded to allow for such material in the finished elevations. Finished surfaces shall be reasonably smooth, compacted and free from surface irregularities that would affect drainage. Channels or swales shall be constructed to provide proper surface drainage.

3.5 TESTING

A. Embankment materials are required to be placed using the Layer Placement method for compaction as specified in this contract. Any specified tests shall be the basis upon which satisfactory completion of work will be judged. Any area or portion thereof that does not meet minimum density requirements shall be reworked and recompacted until it meets the project density requirements and approved by the Contracting Officer.

AG-9AB5-S-17-0047 Page 19 of 53

SECTION 16000

ELECTRICAL

PART 1 - GENERAL

1.1 SCOPE

A. This section includes furnishing and installing all electrical work for this contract.

PART 2 – PRODUCTS

2.2 Conduit

A. Unless otherwise required by NEC or specified in other Sections, the following types of conduits shall be used in the following locations:

1. All above ground locations: EMT or liquid-tight flexible metal

2. All underground locations: HDPVC

B. All conduits shall have bushings on both ends or fitting having equivalent abrasion protection with adaptors to different materials.

C. All conduits shall be bent using the proper tools and methods, and shall show good workmanship with no kinks or flattening.

D. All conduits shall be installed level, plumb, at right angles to building lines, and with offsets at all boxes, panels, etc., and as required.

E. All conduit runs shall be complete and free of dirt or debris shall be swabbed clean prior to installing conductors.

2.2 Conductors. Conductors shall be copper only, 600 volt, type THWN and shall be marked at regular intervals with the manufacturer’s name type, voltage, and size.

A. Neutral conductors shall have continuous white insulation. End marking with white phase tape will not be accepted.

B. Skinning or cutting off enough contractor strands to allow a conductor to fit into a termination devise will not be accepted.

C. Where the insulation on conductors is damaged during the installation, the conductor so damaged shall be removed and new conductors installed.

2.3 Fittings shall be approved for Class I Division hazardous location use.

2.4 Seal-off compound shall be type used specifically for purpose.

AG-9AB5-S-17-0047 Page 20 of 53

2.5 Unused Openings: All unused openings in panels, boxes, etc. shall be closed by the use of knock-out seals or similar items manufactured for the purpose.

PART 3 – EXECUTION

3.1 Conduit requiring bends in tight locations shall be made by fittings or by manufactured short radius elbows.

3.2 Location of work SHOWN ON THE DRAWINGS is approximate; the Contractor shall study the work in relation to the spaces and equipment surrounding the work.

3.3 Wiring shall be protected during demolition. Damaged wiring shall be replaced with wiring having no splices between pull boxes.

3.4 Tests shall be performed as necessary by the Contractor upon completion of the electrical work to demonstrate the completeness and accuracy of his work. All tests shall be performed in the presence of the Contracting Officer or authorized representative.

AG-9AB5-S-17-0047 Page 21 of 53

SECTION E - Inspection and Acceptance

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

52.246-1 Contractor Inspection Requirements. (APR 1984)

52.246-12 Inspection of Construction. (APR 1996)

52.236-5 Material and Workmanship. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.246-12 Inspection of Construction. (APR 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may -http://www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html

AG-9AB5-S-17-0047 Page 22 of 53

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

52.246-21 Warranty of Construction. (MAR 1994)

Pre-Final Inspection

The Contractor shall give written notice to the Contracting Officer at least 15 calendar…