B) Supplemental Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment2.pdf | ||
| Q A's.pdf | ||
| Amendment1.pdf | ||
| Amendment1LakeFulmorRevisedDrawings.pdf | ||
| LakeFulmorWageRate.pdf | ||
| Lake_Fulmer_Dwgs.pdf | ||
| LAKE_FULMER_PROJ_SITE_MAP.pdf | ||
| AG-9A40-S-14-0018 1 .pdf | ||
| L_F_Pier_Rehab__Fire_Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL SPECIFICATIONS
FOR THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03)
Project Name: LAKE FULMOR PIER DECK REPLACEMENT
THE FOLLOWING SUPPLEMENTAL SPECIFICATIONS APPLY TO ALL
ROADS UNLESS OTHERWISE SHOWN ON THE DRAWINGS
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.02 Protection and Restoration of Property and Landscape
108 - Prosecution and Progress
108 Delete
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts
155 Delete
557 - Timber Structures
716 - Materials for Timber Structures
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
107.10_05_us_05_04_2007
107.02 Protection and Restoration of Property and Landscape
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
557 - Timber Structures
557.01_05_us_05_16_2012
Replace FP-03 Section 557 in its entirety and replace with the following:
Description
557.01 Work. Furnish, fabricate, erect, and paint structural timber, including all required yard lumber and hardware.
Materials
557.02 Requirements. Furnish material that conforms to specifications in the following section and subsections:
Hardware …………………................................................ 716.02 Painting ............................................................................… 563 Structural Glued Laminated Timber .................................... 716.04 Treated Structural Timber & Lumber .................................. 716.03 Treated Timber Piles .......................................................… 715.02 Untreated Structural Timber & Lumber ..........................… 716.01
Furnish the following compliance certificates to the CO upon delivery of the materials to the jobsite:
(a) Verification of compliance with grading rules and species of timber and lumber.
Provide certification by an agency accepted as competent by the American Lumber Standards Committee (ALSC).
(b) Lot certification of each charge for preservative, penetration in inches, and retention in pounds per cubic foot (assay method) by a qualified independent inspection and testing agency. In addition, have the producer of the treated products provide written certification that Best Management Practices (BMP’s) in accordance with “Best Management Practices for Treated Wood in Western Aquatic Environments,” published by the Western Wood Preservation Institute (WWPI) and Canadian Institute of Treated Wood, were followed, including a description and appropriate documentation of the applicable BMP’s used.
(c) Certification from a qualified inspection and testing agency indicating that all glued laminated members are in accordance with the requirements of American National Standard for Wood Products, “Structural Glued Laminated Timber” (ANSI/AITC A190.1), modified as SHOWN ON THE DRAWINGS.
(d) Such other certifications as SHOWN ON THE DRAWINGS.
Incise all glued laminated and solid sawn members thicker than 2 inches in accordance with AWPA standard C1, unless otherwise SHOWN ON THE
DRAWINGS.
Provide shop drawings for all timber 21 days in advance of fabrication when SHOWN ON THE DRAWING. Show all dimensions and fabrication details for all cut, framed, or bored timbers.
Construction
557.03 General. Perform the work under Section 208. Furnish structural lumber and timber of the required stress grade.
Clear stacks of weeds, rubbish, or other objectionable material from the ground under and in the vicinity of all stored material. Place the bottom layer of material at least 8 inches above the ground level. Provide sufficient support to prevent sagging.
Open-stack untreated material to shed water. Stack material in layers on spacers (stickers) that extend across the full width of the stack to allow for free air circulation.
Align all stickers vertically and space them at regular intervals.
Close-stack treated material to shed water.
Protect material from the weather. If covered, use sheet material such as water-resistant paper or opaque polyethylene film. Do not cover with impervious membranes, such as polyethylene film, during dry weather. Slit individual wrappings full length or puncture on the lower side to permit drainage of water.
Store and protect glued laminated timber in accordance with the recommendations for Loading and Handling, Job Site Storage, and Erection in “Recommended Practice for Protection of Structural Glued Laminated Timber During Transit, Storage, and Erection,” published by the American Institute of Timber Construction, AITC 111.
Use slings or other devices to protect corners of heavy construction timbers and banded packages of lighter construction timber.
557.04 Treated Timber. Deck panels shall be full-sawn Douglas Fir Larch No.1 or better, conforming to AASHTO M168, pressure treated with Copper Naphthenate in accordance with AASHTO M133 and AWPA U1-09, Use Category UC4B. See Section 716.03, Treated Structural Timber and Lumber for more information.
Fabricate timbers before treatment. Handle treated timber according to the Consumer Information Sheet published by AWPA. Do not cut, frame, or bore treated timber after treatment unless approved by the CO. Handle treated timbers carefully and do not drop, damage outer fibers, or penetrate the surface with tools. Do not use cant dogs, hooks, or pike poles. In coastal waters, do not cut or bore timber below the high water mark.
For timbers originally treated with pentachlorophenol, creosote, creosote solutions, or waterborne preservatives, field treat all cuts, abrasions, bolt holes, and recesses that occur after treatment with two liberal applications of a compatible preservative in accordance with the requirements specified in AWPA standard M4, Standard for the
Care of Pressure-Treated Wood Products.
Unless otherwise specified, copper naphthenate solutions may be used for field treatments of material originally treated with copper naphthenate, pentachlorophenol, creosote, creosote solution, or waterborne preservatives. Prepare the preservative solution by blending copper naphthenate preservative that meets P8 requirements with a solvent conforming to AWPA standard P9. Ensure that the resulting preservative solution concentration contains a minimum of 2 percent copper metal.
Plug all unused holes with preservative-treated plugs. Perform all field-applied preservative treatment with necessary precautions so as to prevent any soil and/or water contamination.
557.05 Untreated Timber. Lumber for handrails shall be Ipe (aka Brazilian Walnut or Pau Lope). See Section 716.01, Untreated Structural Timber and Lumber.
Coat the following untreated timber surfaces in accordance with AWPA standard M4:
(a) All ends and tops, and all contact surfaces of posts, sills, and caps.
(b) All ends, joints, and contact surfaces of bracing and truss members.
(c) All surfaces of timber bumpers and the back faces of bulkheads.
(d) All other timber that will be in contact with earth.
557.06 Workmanship. Cut and form all lumber and construction timber so all joints will have even bearing over the entire contact surface. Do not use shims in making joints. Construct all joints to be closed. Drive nails and spikes to set the heads flush with the wood surface. Use the same end, face, and edge of the timber member for all layout dimensions. Bore all holes from mating faces.
557.07 Holes for Bolts, Dowels, Rods, & Lag Screws. Bore all holes before preservative treating the wood. Bore holes for round drift bolts and dowels 1/16 inch smaller in diameter than that of the bolt or dowel to be used. Ensure that the diameter of holes for square drift bolts or dowels is equal to the side dimension of the bolt or dowel.
Bore holes for machine bolts with a bit 1/16 inch larger than the diameter, except when galvanized bolts are specified. In this case, drill all holes 1/8 inch greater than the bolt size. Bore holes for lag screws with a bit not larger than the body of the screw at the base of the thread. Drill the depth of lag screw boltholes 1 inch less than the length under the screw head and with a diameter approximately 75 percent of the shank diameter.
557.08 Hardware. Furnish the hardware as SHOWN ON THE DRAWINGS, as specified below.
(a) Bolts, Screws and Washers. Finally tighten all nuts and screws to provide proper bearing, and cut off excess bolt lengths of more than 1 inch. After final tightening, check or burr all bolts and screws effectively with a pointing tool to prevent loosening of the nuts.
Use malleable iron washers with a diameter approximately three times the bolt diameter under all bolt and screw heads or nuts in contact with wood. Use cast-iron washers when the timber is in contact with the ground. Use square washers only when SHOWN ON THE DRAWINGS or with the approval of the CO.
(b) Galvanizing. Unless otherwise SHOWN ON THE DRAWINGS, ensure that all fastening hardware is hot-dip galvanized in accordance with AASHTO M232 (ASTM A153), or is made of stainless steel. See Section 716.02, Hardware.
557.09 Countersinking. Countersink nuts, bolt heads AND SCREWS where SHOWN ON THE DRAWINGS. Paint recesses formed for countersinking with an approved preservative, except in railing. After bolts or screws are in place, fill the holes with hot pitch or other approved filler.
557.10 Framing. Do not slab or trim treated piles for fitting sway or sash braces. Fill all gaps that occur between braces and piles with treated blocks so that the bracing is securely fastened to the piles.
557.11 Framing Bents. Bed mud sills firmly, evenly, and level to solid bearing, and tamp in place.
When concrete is cast and dowels are used for anchoring sills and posts, install dowels (3/4 inch minimum diameter) that project at least 6 inches above the tops of the pedestals. Carefully finish concrete pedestals supporting framed bents so that sills or posts bear evenly on the pedestals.
Provide firm, uniform bedding for mud sills. Make sills bear true and even on mud sills, piles, or pedestals. Drift bolt sills with bolts that extend into the mud sills or piles for at least 6 inches. Where possible, remove all earth in contact with sills for circulation of air around the sills.
557.12 Posts. Fasten posts to pedestals with dowels not less than 3/4 inch in diameter that extend at least 6 inches into the posts, or with other types of connectors as SHOWN ON THE DRAWINGS. Fasten posts to sills using one of the following methods, as
SHOWN ON THE DRAWINGS:
(a) With dowels not less than 3/4 inch in diameter that extend at least 6 inches into posts and sills.
(b) With drift bolts not less than 3/4 inch in diameter driven diagonally through the base of the post and extending at least 7 inches into the sill. Drive drift bolts into holes at a 45° angle to enter the post at least 6 inches above the post base.
(c) With other types of connectors as SHOWN ON THE DRAWINGS.
557.13 Pile Bents. Treat, furnish, and drive piles in accordance with Section 551.
557.14 Caps for All Bents. Make timber caps bear even and uniform over the tops of the supporting posts or piles, with their ends in alignment. Secure all caps with drift bolts and set approximately at the center of and extending into the posts or piles at least 9 inches.
557.15 Bracing. Bolt the ends of bracing through the pile, post, cap, or sill. Brace intermediate intersections with posts or piles with bolts or spikes, as required. In all cases, use galvanized spikes in addition to bolts.
Make all bracing bear firmly against the pile or cap to which it is bolted. Provide and place shims as necessary to prevent bending the bracing more than 1 inch out of line when bracing bolts are tightened.
Where the space between the bracing and cap or pile is less than 1 inch, shims need not be used.
Where the space between the bracing and the cap or pile is 1 1/2 ± 3/8 inch, place two ogee washers, with their narrow faces together, or other approved washers on each bolt that passes through the space.
Where the space between the bracing and the cap or pile is over 2 inches, use wooden shims of the proper thickness. Fabricate the wooden shims from White Oak or from other approved hardwood. Do not use built-up wooden shims. Make wooden shims from a single piece of lumber with the width not less than 4 inches, and the length not less than the width of the bracing measured along the cap or pile. Do not adze, trim, or cut any treated member to avoid the use of shims.
557.16 Stringers. Place solid sawn stringers in position so that knots near edges are in the top portions of the stringers.
Outside stringers may have butt joints with the ends cut on a taper. Lap interior stringers to take bearing over the full width of the floor beam or cap at each end. Separate the lapped ends of untreated stringers by at least 1/2 inch for air circulation. Securely fasten the lapped ends with drift bolts, as required. Stagger the joints where stringers are two panels in length.
Install cross-bridging between stringers as SHOWN ON THE DRAWINGS. If timber cross-bridging members are used, cut for a full bearing at each end against the sides of the stringers. Place cross-bridging at the center of each span or as SHOWN ON THE
DRAWINGS.
557.17 Plank Floors. Use plank that is surfaced on four sides (S4S).
Single-ply timber floors consist of a single thickness of planks supported on stringers.
Lay the planks heart side down with 3/16 inch space between them for seasoned material, and with tight joints for unseasoned material. Spike each plank securely to each stringer. Carefully grade the planks as to thickness and lay so that no two adjacent planks vary in thickness by more than 1/16 inch. See Section 716.03, Treated
Structural Timber and Lumber for more information.
Two-ply timber floors consist of two layers of flooring supported on stringers. Pressure treat with creosote oil or with another preservative as SHOWN ON THE DRAWINGS.
Lay the top layer either diagonal or parallel to the centerline of roadway as required.
Securely fasten each floor piece to the lower layer. Stagger joints at least 3 feet. Where the top layer is placed parallel to the centerline of the roadway, use special care to securely fasten the ends of the flooring. Bevel the ends of top layer members at each end of the structure.
557.18 Transversely Nail-Laminated Decks. Use 2 inch nominal thickness laminations; surface one edge hit or miss 1/8 inch scant (SIE–H or M 1/8 inch scant), and one side hit or miss 1/8 inch scant (SIS–H or M 1/8 inch scant).
Place the laminations on edge and at right angles to the centerline of the roadway. Spike each piece to the preceding piece at each end and at approximately 18-inch intervals, with the galvanized spikes driven alternately near the top and bottom edges. Use spikes of sufficient length to pass through two pieces and at least halfway through the third piece.
Where timber stringers are used, toenail every other piece to every other stringer. Use the size spikes specified. When steel stringers are used, securely attach the pieces using approved galvanized metal clips.
Use pieces of sufficient length to bear on at least four stringers. Do not splice pieces between stringers. Space end joints on any one stringer no closer than every third piece.
Space end joints in adjoining pieces no closer than every second stringer.
557.19 Glued Laminated Panel Decks. Do not drag or skid panels. When lifted, support panels in the weak-moment plane at a sufficient number of points to avoid overstressing, and protect the edges from damage.
When dowels are SHOWN ON THE DRAWINGS between deck panels, use a template or drilling jig to ensure that dowel holes are accurately spaced and drilled parallel to one another and to the horizontal surfaces of the panel. Drill holes to a depth 1/4 inch greater than one-half the dowel length, and of a diameter that is 1/16 inch greater than the dowel, unless otherwise SHOWN ON THE DRAWINGS. Use a temporary dowel as a check for snug fit prior to production drilling. Use dowels of the size SHOWN ON THE DRAWINGS, with the tips slightly tapered or rounded. Use an approved lubricant to facilitate the connection process.
Start the tips of all dowels partially and equally into the holes of the two panels being joined. Draw the panels together keeping the edges parallel, until the panels abut tightly.
Securely fasten each panel to each stringer as SHOWN ON THE DRAWINGS.
Assemble and match-mark panels prior to delivery to the construction site when SHOWN ON THE DRAWINGS. Follow erection procedures given in FPL–263, Forest Service, Forest Products Laboratory (FPL), Madison, Wisconsin.
557.20 Wheel Guards & Railings. Surface (S4S) wheel guards, rails, and posts as SHOWN ON THE DRAWINGS. Place wheel guards in sections not less than 12 feet in length. Squarely butt joint all rails at posts.
557.21 Trusses. Fabricate trusses to show no irregularities of line when completed.
Fabricate chords straight and true from end to end in horizontal projection. In vertical projection, fabricate chords to a smooth chorded curve through panel points conforming to the correct camber. Do not make uneven or rough cuts at the points of bearing.
557.22 Finishing. Remove all splinters, burrs and the like; fill all nail holes and other blemishes; clean and sand all woodwork.
557.23 Painting. Paint in accordance with Section 563.
Measurement
557.24 Method. Use the method of measurement that is DESIGNATED IN THE
SCHEDULE OF ITEMS.
Measure untreated and treated structural timber and lumber by the thousand feet board measure (MFBM) of lumber and timber in place in the completed structure. Compute the quantities from nominal dimensions and actual lengths, except for transversely nail-laminated decks. Measure transversely nail-laminated decks in place after dressing.
Measure timber piles under Subsection 551.
Measure handrail by the Linear Foot (LF) in place in the completed structure. Compute the quantities from nominal dimensions and actual lengths.
All fastening hardware shall be considered incidental to Section 557 Pay Items located in the Schedule of Items.
Payment
557.25 The accepted quantities will be paid at the contract price per unit of measurement for the Section 557 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
716 – Material for Timber Structures
716.01 Untreated Structural Timber and Lumber
Add the following:
Lumber for handrails shall be Ipe (aka Brazilian Walnut or Pau Lope). Contractor shall submit Ipe product information and specifications from the manufacturer to the Contracting Officer for approval prior to installation. Product information shall include, at minimum, product name, color, manufacturer’s name, and manufacturer’s installation instructions. Contractor shall adhere to all manufacturers’ instructions for installation, handling, cutting, drilling, sealing, fastening, spacing, and finishing.
716.02 Hardware
Delete paragraph 3 and Add the following:
All bolts, screws, nuts, washers, split ring connectors, plates and bent plates shall be hot-dip galvanized in accordance with AASHTO M232 (ASTM A153) class C after fabrication.
716.03 Treated Structural Timber and Lumber
Deck panels shall be full-sawn Douglas Fir Larch No.1 or better, conforming to AASHTO M168. Deck panels shall be pressure treated with the preferred method of copper naphthenate preservative via mineral spirits carrier in accordance with AWPA standards M2 and M3.
Treated materials shall follow the post treatment requirements summarized in “Best Management Practices for the Use of Treated Wood in Aquatic and Wetland Environments” (WWPI 2012) to ensure all surfaces are free of excess preservatives and chemicals are adequately fixated to the wood. All treated wood members shall be BMP certified by an ALSC accredited inspection agency. All wood members shall be cut and drilled before treatment. When miscellaneous field drilled holes and cuts are required because of misalignment, they must be approved by the Engineer. Field drilled holes and cuts shall be field treated with two applications of copper naphthenate 2% solution. Lead holes are required for all bolts and screws.
718 - Traffic Signing and Marking Material
718.05_nat_us_08_05_2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.