Amendment2.pdf

PDF 37 KB Posted

Attached to
Lake Fulmor Pier Deck Replacement Federal contract opportunity
Solicitation number
AG-9A40-S-14-0018
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Lake Fulmor Pier Deck Replacement, newest first.
File Type Posted
Q A's.pdf PDF
Amendment1.pdf PDF
Amendment1LakeFulmorRevisedDrawings.pdf PDF
LakeFulmer_SupplementalSpecs.pdf PDF
L_F_Pier_Rehab__Fire_Plan.pdf PDF
LakeFulmorWageRate.pdf PDF
Lake_Fulmer_Dwgs.pdf PDF
LAKE_FULMER_PROJ_SITE_MAP.pdf PDF
AG-9A40-S-14-0018 1 .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment 2 05/15/2014

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service Southern California Service Area 1600 Tollhouse Road Clovis, CA 93611

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-9A40-S-14-0018

9B. DATED (SEE ITEM 11)

05/05/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return Original copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Lake Fulmor Pier Deck Replacement, is amended as follows:

1. Replace the Schedule of Items page with the attached revised Schedule of Items page.

2. Remove references to “Ipe” wood railing in the Supplemental Specifications, Sections 557.09 and 716.01, and replace with “Douglas Fir”.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

MARY CANTRELL, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

LAKE FULMOR PIER DECK REPLACEMENT

DISTRICT

FP-03 Section (Pay Item) Description Quantity Unit MM Unit Price Total Price

151(01) Mobilization 1 LS CQ

203(04) Removal of Existing Deck / Bracing Lumber and Hardware, Disposal Method A

1 LS CQ

557(01)

a. Treated Structural Timber and Lumber, Douglas Fir No.1 or better, Copper Naphthenate pressure treated

2.7 MFBM CQ

557(01)

b. Treated Structural Timber and Lumber, Douglas Fir No.1 or better, Copper Naphthenate pressure treated, 6"x6"x8'

120 LF CQ

557(01)

c. Treated Structural Timber and Lumber, Douglas Fir No.1 or better, Copper Naphthenate pressure treated, 3"x6"x10'

280 LF CQ

557(01) d. Refurbish Hardware 1 LS CQ

TOTAL PROJECT

(BASE BID)

CONTRACTOR

Name

Signature Date

SAN JACINTO

SCHEDULE OF ITEMS

PROJECT: LAKE FULMOR PIER DECK REPLACEMENT

SAN JACINTO RANGER DISTRICT, SAN BERNARDINO NATIONAL FOREST

*BASE BID*

Revised SCH-OF-ITEMS.pdf
SCHEDULE