Lake_Fulmer_Dwgs.pdf

PDF 2 MB Posted

Attached to
Lake Fulmor Pier Deck Replacement Federal contract opportunity
Solicitation number
AG-9A40-S-14-0018
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

D) Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Lake Fulmor Pier Deck Replacement, newest first.
File Type Posted
Amendment2.pdf PDF
Q A's.pdf PDF
Amendment1LakeFulmorRevisedDrawings.pdf PDF
Amendment1.pdf PDF
AG-9A40-S-14-0018 1 .pdf PDF
L_F_Pier_Rehab__Fire_Plan.pdf PDF
LakeFulmorWageRate.pdf PDF
LAKE_FULMER_PROJ_SITE_MAP.pdf PDF
LakeFulmer_SupplementalSpecs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

LA

K

E F

U

LM

E R

P

IE

R D

E C

K R

E P

LA

C

E M

E N

T

TI

TL

E S

H E

E T

T-1

AS NOTED

04/14/2014

SA

N

B

ER

N A

R D

IN

O

N A

TI

O

N A

L

FO

R

ES

T

1 5

PROJECT LOCATION

PROJECT LOCATION

PROJECT SITE: LAKE FULMER

.\sanbernardinomap.gif

LAKE FULMER

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

XXXXX

LA

K

E F

U

LM

E R

P

IE

R D

E C

K R

E P

LA

C

E M

E N

T

D E

C K

P

LA

N a nd H

A N

D R

A

IL

D E

TA

IL

S

C1

NTS

04/11/2014

SA

N

B

ER

N A

R D

IN

O

2 5

IMBED LOOP

IN CONCRETE

CONCRETE PAD

1 CUBIC YARD

APPROXIMATE LAKE BOTTOM

BOTTOM OF JOIST

@ 6" ABOVE MAX.

WATER LEVEL

REPLACE OR REFURBISH EXISTING

3/8" DIA. GALV. WIRE ROPE, EYEBOLTS

AND CLAMPS. CUT WIRE ROPE 15" PAST

EYE BOLT FOR PROPER LENGTH.

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

XXXXX

LA

K

E F

U

LM

E R

P

IE

R D

E C

K R

E P

LA

C

E M

E N

T

P

IE

R P

LA

N

A N

D C

A B

LE

B

R A

C E

D E

TA

IL

S

C-2

NTS

04/14/2014

SA

N

B

ER

N A

R D

IN

3 5

2 x 6 NOTCHED

INTO 8 x 8

NOTCH 2 x 6 INTO

8 x 8 PIER SUPPORT

2 x 10 NOTCHED INTO

8 X 8 PIER SUPPORTS.

SKEWED SECTION ONLY

WOOD

DECK

6 x 6

SUPPORT

POST (TYP)

MINERAL OIL COPPER NAPTHENATE, MEETING

THE REQUIREMENTS OF AWPA M2.

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

XXXXX

LA

K

E F

U

LM

E R

P

IE

R D

E C

K R

E P

LA

C

E M

E N

T

P

IE

R S

U P

P O

R T an d

B E

N C

H D

E

TA

IL

S

C-3

NTS

04/14/2014

SA

N

B

ER

N A

R D

IN

4 5

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A xxxx

LA

K

E F

U

LM

E R

P

IE

R D

E C

K R

E P

LA

C

E M

E N

T

C O

N C

R E

TE

H

E A

D W

A

LL

D E

TA

IL

S

C-4

NTS

04/14/2014

SA

N

B

ER

N A

R D

IN

5 5

1_T1_LAKE FULMER COVER
2_C1_DECK PLAN VIEW and DETAILS
3_C2_PIER PLAN and CABLE BRACE DETAILS
4_C3_PIER SUPPORT and BENCH DETAILS
5_C4_HEADWALL_DETAILS-Layout1

File details come from the government source that posted it. Updated .