Summary of Changes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82X9-S-12-0157 | — | |
| SF 30 Amend1.pdf | ||
| Page1.pdf | ||
| Weller Trail Bridge Survey Points Data.pdf | ||
| Page2.pdf | ||
| Page4.pdf | ||
| Emergency Fire Control.docx | DOCX document | |
| DESIGN Criteria.docx | DOCX document | |
| Page3.pdf | ||
| Weller_Hydrology_Hydraulics.pdf | ||
| Weller Trail Bridge Control Point Data.pdf | ||
| Pitkin DBA.pdf | ||
| Page5.pdf | ||
| AG-82X9-S-12-0157 CAC(1) Review.rtf | RTF text file | |
| Required Submittals.docx | DOCX document | |
| RFP 1442.pdf | ||
| Specifications.doc | DOC document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL NO. AG-82X9-S-12-0157
White River National Forest
Weller Trail Bridge Reconstructioon
Amendment 0001
SUMMARY OF CHANGES:
Page 1 Block 13 paragraph (a) now reads as follows:
a. Sealed offers in original and ___1______ copies to perform the work required are due at the place specified in Item 8 by ____1200__PM_________ (hour) local time
________09/04/2012______ (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
All Sections
Page numbering has been corrected
Questions and Answers
1. Question: Section C and Specifications, posted on FedBizOps, page numbering hung on page 5.
Answer: All section numbering has been corrected. See revised document AG-82X9-S-
12-0157 (Amend1).
2. Question: is the project within any wilderness boundaries?
Answer: The project is not within any Wilderness boundaries.
3. QUESTION: Attendee noted the bid closing date is on September 2, which is the
Sunday before Labor Day.
ANSWER: The response date and time has been changed to 04 September 2012
1200 PM MDT.
4. QUESTION: Specific Bridge location?
ANSWER: Contractor will be able to deviate 40’ on either side of the current marked alignment. Purpose of this is to minimize clearing, blasting, general impacts. Project
Engineer shall review and approve final selected location.
5. QUESTION: How much trail work will be completed as a part of this project?
ANSWER: Only the immediate bridge approaches – approximately 5’ from end of bridge.
6. QUESTION: Would the FS consider complete closure of the Weller Trailhead for the duration for the project?
SOL NO. AG-82X9-S-12-0157
White River National Forest
Weller Trail Bridge Reconstructioon
Amendment 0001
ANSWER: 4 weeks will be allowed if construction is early/mid-summer. Six weeks will be allowed if construction is primarily in September. Coordination and approvals may also be required from Colorado Department of Transportation.
7. QUESTION: Bridge Over Roaring Fork: Bridge to be salvaged and brought to…?
ANSWER: Per SCR 203; north half of superstructure to become property of contractor.
South half of superstructure to be salvaged and transported to Forest Service Storage
Yard in Glenwood Springs, CO. All sill and abutment material to become the property of the contractor.
8. QUESTION: Bridge Over Weller Creek (Optional Item) to be removed and property of contractor?
ANSWER: Yes, per SCR 203. Weller Creek Bridge, sills and abutments.
9. QUESTION: What is the acceptable level of disturbance and/or use of mechanized equipment to remove the existing bridges?
ANSWER: Impact to be minimized per standard and SCRs. Actual impacts will be submitted and approved as part of the Erosion Control Plan and will be specific to the contractor’s staging, equipment and timeframe. SCRs describe clearing and grubbing allowed for access to the existing bridge over the Roaring Fork.
10. QUESTION: Is erosion control work included in this contract?
ANSWER: Yes. Refer to FARs, Standard and Special Contract Requirements.
11. QUESTION: Survey adequacy?
ANSWER: Forest Service will verify that existing topographical survey provided is adequate, and will provide supplemental information if necessary.
12. QUESTION: Is temporary bridging or scaffolding permitted?
ANSWER: Discussed in standard specifications. Contractor would need to submit a proposal, to be approved by the CO.