Specifications.doc
DOC document 502 KB Posted
- Attached to
- Weller Trail Bridge Reconstruction Federal contract opportunity
- Solicitation number
- AG-82X9-S-12-0157
- Issued by
- Department of Agriculture Forest Service
About this file
Attachment J.1 - Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Summary of Changes.pdf | ||
| AG-82X9-S-12-0157 | — | |
| SF 30 Amend1.pdf | ||
| Page1.pdf | ||
| Weller Trail Bridge Survey Points Data.pdf | ||
| Page2.pdf | ||
| Page4.pdf | ||
| Emergency Fire Control.docx | DOCX document | |
| DESIGN Criteria.docx | DOCX document | |
| Page3.pdf | ||
| Weller_Hydrology_Hydraulics.pdf | ||
| Weller Trail Bridge Control Point Data.pdf | ||
| Pitkin DBA.pdf | ||
| Page5.pdf | ||
| AG-82X9-S-12-0157 CAC(1) Review.rtf | RTF text file | |
| Required Submittals.docx | DOCX document | |
| RFP 1442.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Weller Trail Bridge Reconstruction
Attachment J.1
Page 2of 52
Specifications for Construction of Roads and Bridges on Federal Highway Projects
Specification List
Applicable sections of the Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units will vary depending on the final engineering design selected, however, the Government expects some or all of the following sections will be incorporated into the final engineering design prepared by the Contractor. It is the Contractor’s responsibility to identify applicable specifications, develop additional SCRs as required, and delete inapplicable specifications (as approved by the CO) Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this project.
Terms, Format, and Definitions
SCR 101
Terms, Format, and Definitions
Bid, Award, and Execution Of Contract
SCR 102
Bid, Award, and Execution Of Contract
Scope of Work
SCR 103
Scope of Work
Control of Work
SCR 104
Control of Work
Control of Materials
SCR 105
Control of Materials Acceptance of Work
SCR 106
Acceptance of Work
Legal Relations and Responsibility to the Public
SCR 107
Legal Relations and Responsibility to the Public
Prosecution and Process
SCR 108
Prosecution and Process
Measurement and Payment
SCR 109
Measurement and Payment Mobilization
SCR 151
Mobilization
Construction Survey and Staking
SCR 152
Construction Survey and Staking
Contractor Quality Control
SCR 153
Contractor Quality Control
Contractor Sampling and Testing
SCR 154
Contractor Sampling and Testing
Schedules for Construction Contracts
SCR 155
Schedules for Construction Contracts
Public Traffic
SCR 156
Public Traffic
Soil Erosion Control
SCR 157
Soil Erosion Control
Clearing and Grubbing
SCR 201
Clearing and Grubbing
Removal of Structures and Obstructions
SCR 203
Removal of Structures and Obstructions
Excavation and Embankment
Structural Excavation and Backfill
SCR 209
Structural Excavation and Backfill
Riprap
SCR 251
Riprap
Geocell Abutment Stabilization
SCR 272
Geocell Abutment Stabilization
Minor Aggregates
SCR 342
Minor Aggregates
Structural Concrete
SCR 552
Structural Concrete
Reinforcing Steel
SCR 554
Reinforcing Steel
Steel Structures
SCR 555
Steel Structures
Timber Structures
SCR 557
Timber Structures
Painting
SCR 563
Painting
Bearing Devices
SCR 570
Bridge Structure Design, Fabrication and Construction
Precast Concrete Structures
Precast Concrete Structures
SCR 601
Minor Concrete Structures Turf Establishment
SCR 625
Turf Establishment
700 to 725 Materials (All applicable materials sections)
SCR 714
Geotextile and Geocomposite Drain Material
SCR 736
Geocell
101 - Terms, Format, and Definitions 101.00_nat_us_04_02_2004
101.01 Meaning of Terms
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat_us_04_02_2004
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
WWPA
ALSC
WWPI
NLGA
NSLB
NLMA
RIS
SPIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau Western Wood Products Association American Lumber Standards Committee Western Wood Preservers Institute National Lumber Grades Authority Northern Softwood Lumber Bureau Northeastern Lumber Manufacturer's Association Redwood Inspection Service Southern Pine Inspection Bureau
Add the following to (b) SI symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Figure 101-1—Illustration of trail structure terms.
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Delete Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
103 Delete Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.01_nat_us_06_16_2006 104 Control of Work.
Delete Sections 104.01, 104.02, and 104.4.
104.03_nat_us_03_23_2004
104.03 Specifications and Drawings.
Add the following:
(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information on the as-built plans.
Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.
Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.
Show the following types of changes on the as-built plans:
(1) Typical section(s)
(a) Revisions in dimensions
(b) Revisions in materials
(2) Plan and profile
· Revisions to the alignment
· Changes in the construction limits
· Revisions in location, type, and grade of trail approaches
· Location, size, and type of underdrains
· Skew of bridge
· Channel changes
· Location of monuments and permanent references
· Revisions to grades, elevations, and stationing of intersection PIs
· Equations
· Location, length, stationing, and type of retaining walls
· Location, length, stationing, and end treatment of guardrail
(3) Bridge
(a) Stationing of bridge ends
(b) Revisions to footing and seal elevations
(c) Type of bridge and wingwall system
(d) Any changes in plan or dimensions including any major changes in reinforcing
Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.
104.05_nat_us_03_23_2004
Add the following subsections:
104.06 Load Restrictions.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Colorado Department of Transportation (CDOT) restricts vehicles over 35 feet in length on State Highway 82 over Independence Pass. Any permits sought are the responsibility of the Contractor. For more information on CDOT permits, road restrictions, and pilot escorts, go to http://www.coloradodot.info/business/permits/truckpermits/pilot-car-certification-information.html
104.07 Other Contracts.
The contractor shall schedule activities to coordinate and cooperate with other contracts, including any active CDOT contracts, when applicable.
105 - Control of Material 105.02_nat_us_03_26_2004
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.02_nat_us_03_08_2007
105.02(b) Contractor-located sources Add the following:
All certifiable material (e.g., soil, gravel, seed, mulch, etc.) transported onto National Forest System land or incorporated into the work will be weed free. All seed and mulch materials must be certified weed-free.
Provide the Contracting Officer written notification of proposed material sources 15 calendar days prior to use. Sources shall be inspected by an agency weed specialist. Written approval of the specific source will be provided to the contractor. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more restrictive.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Three methods of determining conformity and accepting work are described in Subsections 106.02 to 106.04 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work).
Replace the entire section with the following:
Statistical evaluation of the work will not be required. All specifications referring to this Subsection shall instead be referred to Subsections 106.02 through 106.04 as appropriate for the work performed.
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public 107.02_nat_us_02_17_2005
107.02 Protection and Restoration of Property and Landscape.
Add the following:
Any routes or areas used during construction that are disturbed shall be rehabilitated by restoring to the natural contour, scarifying compacted areas, and seeding according to FP-03 Section 625 - Turf Establishment and the applicable SCRs.
Work within the channel is not restricted except during high water/peak flows, as defined by the CO.
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.08_nat_us_05_11_2004
107.08 Sanitation, Health, and Safety.
Add the following:
The Contractor shall provide on-site toilets meeting all OSHA and State requirements concerning sanitation facilities at the job site.
Perform all operations in a prudent, safe, conscientious and professional manner. Ensure that all personnel involved in handling or packaging hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120. Notify the Forest Service of all hazardous material that may be brought onto the National Forest
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
107.10_nat_us_06_16_2006
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential impacts and impacts of hazardous material spills on National Forest land.
Before beginning any work, submit a Hazardous Spill Plan, List actions to be taken in the event of a spill. Incorporate measures to be taken, such as the location of mobile refueling facilities, the storage and handling of hazardous materials, and similar information.
The contractor is solely responsible for all leaks and spills that occur during the performance of this contract.
Immediately notify the CO of all hazardous material spills. Provide a narrative written report no later than 24 hours after the initial report and include the following:
· Description of the item spilled (include identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, if it was reported, when and to whom.
· Exact time and location of the spill including a description of the area involved.
· Containment procedures.
· Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, and Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
Clean all construction equipment prior to entry onto the project area. Remove all dirt and plant parts and material that could carry noxious weeds and seeds into the project area. Only construction equipment so cleaned and inspected by the Forest Service will be allowed to operate within the project area. Treat all subsequent move-ins of equipment in the same manner as initial move-ins. “Construction equipment” includes all vehicles and equipment brought within the project area or approved staging areas.
Prior to the initial move-in, the Contractor shall make all construction equipment available for inspection by that Forest Service at an agreed-upon location, Provide the Forest Service at least 48 hours advance notification when equipment is ready for inspection.
New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, on the Project Area or on the haul route, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found.
Entering, crossing, and leaving the stream channel with the Contractor’s or his agent’s equipment shall be at locations(s) approved in advance by the CO. The number of crossings and length of time equipment operates within the river channel shall be kept to the minimum necessary for the purposes of constructing the bridge. The equipment shall be cleaned of all anti-freeze, grease, hydraulic fluid, brake fluid, steering fluid, oil, or fuel prior to entering the water influence zone. The Contractor shall notify the CO, so the Government can inspect the cleaning operation prior to commencing work at the project site. Equipment cleaning shall be done outside the water influence zone as approved by the CO or off National Forest lands, in accordance with all federal, state and local laws. The Contractor shall inspect the equipment daily for leaks prior to use.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.02_nat_us_03_25_2004
109.01 Measurement of Work
Replace the fifth paragraph with the following:
Submit measurement notes to the CO as directed. For lump sum items, submit documentation as required by the CO to support invoiced progress payments.
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
(b) Cubic Yard.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Delete methods (2) and (4) Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.00_nat_us_02_17_2005
Delete the following entire subsections:
109.05 Scope of Payment
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
151 – Mobilization
151.00_R1_10_11_2006
Delete Section 151 in its entirety and replace with the following.
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.
A written access plan shall be submitted to the Forest Service for approval prior to accessing the sites. The access plan shall list all equipment, motorized and non-motorized, the Contractor proposes to use to access the site.
Construction Requirements
Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.
Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Use methods of cleaning and locations for cleaning approved by the CO.
For work at a commercial washing facility, use an approved facility.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
Measurement
151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.
Measure mobilization according to Subsection 109.02.
Payment
151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 570(04) pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization. Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.
152 - Construction Survey and Staking 152.00_nat_us_08_05_2005
Description
152.01(c) Material.
Add the following:
Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.
Do not use aerosol spray paints.
Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.
Construction Requirements
152.02 General.
Delete the first two sentences.
Delete second sentence in second paragraph and replace with the following:
Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations.
152.03 Survey and Staking Requirements.
(b) Roadway cross-sections. Replace the first three sentences with the following:
Take trailway cross-sections normal to centerline. spacing of 80 feet.
c) Slope Stakes & References:
Replace section with the following:
Slope stakes and references. When required, locate slope stakes on designated portions of the trail. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.
Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.
Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.
Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.
Use the designated method to establish the slope stake catchpoint.
· Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.
· Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.
(d) Clearing and grubbing limits.
Add the following:
Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.
After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.
(e) Centerline reestablishment.
Replace with the following:
Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.
(g) Culverts.
Delete this section
(h) Bridges.
Replace the subsection with the following:
Set adequate vertical and horizontal control, reference lines, and reference points for the bridge, abutment grade beams, abutment geocell pads, and other major components. Establish the bridge control, reference lines and reference points by setting hubs and guard stakes beyond the clearing limits on each side of the channel. Record the following reference stakes:
(1) Station or coordinates of actual point where the abutment centerline bearing intersects the trail centerline and skew angle;
(2) Reference points and lines for the location of all abutments and abutment components, including elevations and bolt cut-off elevations;
(3) Reference points and lines for wingwalls and abutment backing wall locations including all elevations;
(4) Reference points and lines for all top of embankment stations and offsets;
(5) Reference points and lines for final trail grade; and,
(6) Riprap coordinates and elevations
(l) Miscellaneous Survey and Staking.
Add the following:
(11) Erosion Control Measures
Replace Table 152-1 with the following two tables:
Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.
| Precision Class |
| Minimum Position Closure |
| Angular Accuracy (±) |
| L-Line Tangent Control Pointsa (±) |
| Vertical Closureb (±) |
A
(Bridges)
| 1/10,000 |
| 2 sets, direct/reverse |
10 second rejection limit
| N/A |
| 0.02 ft or |
0.02ft/1000ftc
| B |
| 1/5,000 |
| 2 sets, direct/reverse |
20 second rejection limit
| 0.1 ft |
| 0.02 ft or |
0.02ft/1000ftc
| C |
| 1/1,000 |
| 1 set, direct/reverse |
1 minute rejection limit
| 0.2 ft |
| 0.5ft/1000ftc |
| D |
| 1/300 |
| Foresight and backsight; 15 minute rejection limitc |
| 0.4 ft |
| 1.0ft/1000ftc |
| E |
| 1/100 |
| Foresight and backsight; 30 minute rejection limitc |
| 0.8 ft |
| 1.0ft/1000ftc |
a. Accuracy of offset measurement.
b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.
c. Use greater value.
Table 152-2 Cross section and slope stake tolerances.
| Item |
| Tolerances |
| A |
| B |
| C |
| D |
| E |
| Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves |
| (±)2o |
| (±)3o |
| (±)3o |
| (±)5o |
| (±)5o |
| Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed |
| 0.5 ft |
| 1.0 ft |
| 2.0 ft |
| 2.0 ft |
| 3.0 ft |
| Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater. |
| 0.1 ft or 0.4% |
| 0.15 ft or 0.6% |
| 0.2 ft or 1.0% |
| 0.2 ft or 1.0% |
| 0.3 ft or 1.0% |
Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.
| Slope reference stakes and slope stakes. |
| 0.1 ft or 0.4% |
| 0.15 ft or 0.6% |
| 0.2 ft or 1.0% |
| 0.2 ft or 1.0% |
| 0.3 ft or 1.0% |
| Clearing limits |
| 1.0 ft |
| 1.0 ft |
| 1.0 ft |
| 1.5 ft |
| 2.5 ft |
152.06 Payment.
Delete the entire subsection and add the following:
All equipment, labor, materials, and incidentals required for Construction Survey and Staking shall not be measured or compensated for separately, but shall be incidental to pay item 570(01) .
153 - Contractor Quality Control 153.02_nat_us_02_17_2005
153.02 Contractor Quality Control Plan.
Add the following:
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.02(d) Personnel Qualifications.
Add the following:
(3) The contractor shall submit to the CO certifications of testing and sampling personnel. Testing and Sampling personnel shall either be certified as NICET Level 2 in highway materials, or an equivalent state or industry certification such as Western Alliance Quality Technician Construction Certification (WAQTC)
153(03) Testing.
Add the following:
The contractor shall submit to the CO current documentation of the calibration and inspection of the testing equipment to be used for the project. The documentation shall include inspection date, inspector, calibration number, and method of calibration. All testing equipment shall be calibrated and inspected and tagged as described above. The lab testing equipment and density testing equipment shall be calibrated and inspected on a yearly basis. The concrete testing equipment shall be tested and calibrated every four months.
153.04_nat_us_10_24_2007
153.04 Records.
Delete all but the first sentence
154 - Contractor Sampling and Testing
Delete this section in its entirety.
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 – Public Traffic
Delete Section 156 in its entirety and replace with the following:
156.01 Description.
This work applies to National Forest System lands and easements only, and consists of controlling and protecting public traffic adjacent to and within the project. Perform work in a manner that ensures the safety and convenience of the public and protects improvements, natural resources and/or facilities adjacent to the site. Accommodate public traffic on roads adjacent to and within the project until the project is accepted by the Agency
156.02 General.
Contractor shall prepare a Transportation Management Plan (TMP) for each phase of the project, and provide it to the agency for review and approval a minimum of 20 working days prior to the start of construction. Review and approval must also be approved by CDOT for Highway 82 as required; this approval shall be submitted as part of the TMP. The Transportation Management Plan shall consist of a Temporary Traffic Control Plan (TTC plan) and Public Information Strategy. The Operator/Contractor shall manage the work zone impacts of the project in accordance with the Transportation Management Plan.
A. The TTC Plan addresses traffic safety and control through the work zone and addresses sustained operations and management of the work zone impact area.
B. The Public Information component requirements address communication with the public and concerned stakeholders.
156.03 Temporary Traffic Control Plan.
This work consists of furnishing, maintaining, relocating and moving temporary traffic control devices for the control and protection of traffic through the project, and shall be provided in writing and must be prepared and signed by a qualified Professional Civil Engineer or Transportation Engineer licensed in the State of Colorado.
A. Install and maintain traffic control devices as follows:
1. Furnish and install traffic control devices before the start of construction operations.
2. All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
3. Install only those traffic control devices needed for each stage or phase.
4. Relocate temporary traffic control devices as necessary.
5. Remove devices that no longer apply to the existing conditions.
6. Immediately replace any device that is lost, stolen, destroyed, or inoperative.
7. Keep temporary traffic control devices clean.
8. Remove all temporary traffic control devices upon contract completion or when approved.
9. When required, use flaggers, flagger paddles, personal protective equipment in accordance with CDOT requirements.
B. The TTC Plan shall include as a minimum the following:
1. An approved temporary traffic control plan approved by CDOT for State Highway 82 and Weller Trailhead.
2. Copies of all CDOT permits.
3. A signing and access maintenance plan for maintaining and controlling pedestrian, bicycle and other non-vehicular traffic at Weller Trailhead and on the Weller area trail system, during construction and during closure periods such as weekends, holidays and/or winter closures.. This plan shall include any trail detours. The plan must be approved by the CO.
4. Supporting references from documents such as the MUTCD or Forest Service Manual EM 7100-15, for all devices and plans.
C. Qualifications:
1. Traffic and Safety Supervisor. Provide a traffic and safety supervisor who is certified by a state highway agency or other acceptable certification program. Furnish the supervisor’s name, address, 24-hour telephone number prior to the start of the work.
C. At all times, during the project, including periods of suspension and shutdown, perform all of the following:
1. Implement traffic control plan.
2. Ensure the condition and placement of traffic control devices in use.
3. Immediately correct deficiencies.
4. Coordinate traffic control operations with the Contracting Officer.
156.04 Public Information/Communication Strategy.
This work will include a written plan, approved by the agency, which provides information the agency may use for media releases to inform the public of the start and completion dates, expected delays, any lane or full closures, detours, if applicable, and any special accommodations for users other than vehicular. The plan shall be updated whenever there is a change from the original Public Information Strategy, and provided to the agency for public release.
156.05 Maintaining Roadway During Work.
A. Maintain a dust-free traveled way such that visibility and air quality are not affected. This work shall be considered incidental to the project.
B. Maintain the trails and trail detours in a safe and acceptable condition, during work and during periods when work is not in progress.
C. Snow removal to facilitate the work or access to the site is the Contractor’s responsibility.
156.06 Limitations on Construction Operations. No work shall occur on weekends or holidays at Weller Trailhead, access routes, or the trail bridge site. A weekend is considered to begin at noon on Friday and end at midnight on Sunday. Holidays include Memorial Day, Independence Day, and Labor Day. No work shall occur between midnight the Thursday prior to the holiday until midnight of the holiday. For Independence Day no work shall occur from noon July 3rd through noon July 8th.
Road construction related equipment shall be prohibited from using the Red Sandstone Road (FSR 700) between M.P. 25.67 and M.P. 31.10 (Town of Vail).
156.06 Payment.
Delete the entire subsection and add the following:
All work associated with Public Traffic is considered an indirect cost of this contract and will not be compensated as a separate work item. All equipment, labor, materials, and incidentals required for Public Traffic shall not be measured separately, but shall be incidental to this contract.
157 - Soil Erosion Control 157.03_0510_us_01_20_2005
157.03 General.
Delete the first two paragraphs and add the following:
Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction according to the contract specifications, contract permits, Section 107, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of any control or practice without CO approval. Submit the erosion control plan proposal at least 30 days before operations begin to the Contracting Officer for approval.
Reflect in the erosion control plan special concerns and measures necessary to protect resources and government improvements. Include:
1. The construction activities and sequence of implementation relating to specific erosion control measures.
2. The location and type of permanent controls to be implemented during construction.
3. The location and type of temporary controls to be implemented during construction.
4. For work in stream channels with running water a detailed dewatering plan.
5. For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
Indicate actions to be taken is erosion control methods are not functioning as intended.
6. Describe what monitoring will take place.
Add to the third paragraph:
Upon completion of construction at the site, all temporary dewatering materials and equipment are to be removed from Government property.
157.16 Payment.
Delete the entire subsection and add the following:
All equipment, labor, materials, and incidentals required for Soil Erosion Control shall not be measured separately, but shall be incidental to items 570(03) and 570(05).
201 - Clearing and Grubbing
201.01 Description.
Replace with the following:
This work consists of clearing and grubbing within the clearing limits and other designated areas. Clearing limits defined by the contractor shall be approved by the CO prior to start of work.
Topsoil shall be removed and stockpiled in a location designated by the CO. Stockpiled topsoil shall be used utilized as part of Turf Re-establishment.
201.09 Payment.
Delete the entire subsection and add the following:
All equipment, labor, materials, and incidentals required for Clearing and Grubbing shall not be measured or compensated for separately, but shall be incidental to items 570(03) and 570(05).
203 – Removal of Structures and Obstructions
Construction Requirements
203.01 Description
Add the following:
This work consists of the removal of the two existing trail bridges, as described below. The Contractor shall provide a demolition and removal plan to the CO prior to commencing work. The plan shall address all related equipment, sequence of work, procedures, and safety provisions. CO approval of the plan will not reduce the Contractors liability relating to the plan and its implementation.
Access to the existing bridge must minimize clearing limits. No grubbing shall be performed. Equipment must be tracked to prevent damage to existing ground cover.
The north half of primary exiting bridge superstructure shall be removed, salvaged in its existing condition, transported and unloaded in the Glenwood Springs Storage Yard. The south half of the primary bridge structure and the secondary bridge structure shall become the property of the contractor and shall be removed and disposed of in accordance with federal, state and local requirements.
The bridge abutments, fill and embankments shall be removed and disposed of. All abutment materials shall become the property of the contractor and removed from National Forest lands in accordance with all federal, state and local laws.
203.04 Removing Material.
Replace the fourth and fifth paragraphs with the following:
Remove Structures and Obstructions to finished ground surface elevation.
203.05 Disposing of Material.
Add the following:
(e) Scattering. Scatter pieces of wood less than 3 inches in diameter and 3 feet in length within the clearing limits, outside of the necessary travel-way for bridge removal. After bridge removal, scatter over the entire travel-way in a manner to obscure the traveled way as best possible with the materials available. a minimum of two feet away from the trail, approaches, and floodplain area. Do not place construction slash in lakes, meadows, streams, or streambeds, or within 50 feet of the aforementioned areas. Immediately remove construction slash that interferes with drainage structures.
Scatter larger construction slash outside the clearing limits without damaging trees or obscuring trail. Limb all logs. Temporarily place logs and stumps away from trees, positioned so they will not roll, and are not on top one another. Merchantable timber shall become the property of the contractor. Limb and scatter other debris to reduce slash concentration. Piles will not be allowed. Immediately remove and relocate slash which interferes with drainage structures.
203.08 Payment
Delete the entire subsection and add the following:
Disposal of construction slash and merchantable timber is considered an indirect cost of Pay Items 570(03), 570(05) and/or 570(06)and will not be compensated as a separate work item.
All bridge removal work associated with this section, including all equipment, labor, materials, and incidentals shall not be measured separately, but shall be incidental to item 570(05) and/or 570(06).
209 – Structure Excavation and Embankment
Description
209.01
Replace with:
This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
Construction Requirements
209.08 Preparing Foundation for Embankment Construction.
Replace
Reference to Subsection 208.09(d) with AS SHOWN ON STANDARD PLANS.
Add the following:
The foundation elevation is defined as the bottom of footings, for spread footing placement; the bottom of the pile cap, for construction of pile foundations; and the toe of the wall, for construction of retaining walls, except wingwalls at bridges.
Replace all material from any over-excavation below the designated footing elevation with concrete at the direction of the CO and as shown in the standard plans.
209.09 Bedding.
Add to start of first sentence:
After receiving written approval from the CO, ….
209.10 Backfill/Embankment Construction.
Add to start of first sentence:
After receiving written approval from the CO, ….
(a) General.
Replace
Reference to Subsection 209.11 with 204.11(b), paragraph 2.
Delete
(b), (c), (d)
Add the following:
Incorporate only suitable excavation material into the embankment. When the supply of suitable excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments. Construct embankments as follows:
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
Where placing embankment on one side of abutments, wing walls, piers, or culvert headwalls, compact the material using methods that prevent excessive pressure against the structure.
209.11 Compaction
Delete entire subsection.
Compact the embankment as specified:
Compaction B. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
209.12 Replace entire subsection with the following:
Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows:
(a) Sloping. Leave all earth slopes with uniform roughened surfaces. Finish the approaches to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 209-1.Ensure that the subgrade is visibly moist during shaping and dressing. Maintain proper ditch drainage.
(b) If a slide or slipout occurs on a cut or embankment slope, remove or replace the material, and repair or restore all damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition.
209.13 Disposal of Unsuitable or Excess Material.
Replace entire subsection with the following:
Dispose of unsuitable or excess material at legally off of the project.
209.14 Acceptance.
Add the following:
See Table 209-1 for construction tolerances.
Embankment and conserved topsoil will be evaluated under Subsections 106.02 and 106.04.
Excavation and embankment construction will be evaluated under Subsections 106.02 and 106.04.
Clearing and removal of obstructions will be evaluated under Sections 201 and 203.
Measurement
209.15 Delete the entire subsection.
Payment
209.16 Payment
Delete the entire subsection and replace with the following:
All equipment, labor, materials, and incidentals required for…
This is the start of the file's text. The full file is on GovTribe.