Weller Trail Bridge Reconstruction
| Attachment J.8 |
| Page 2of 2 |
List of Required Submittals:
The required submittals shall include, but are not limited to, the following:
| Submittal Type |
| Specification Reference |
| Description |
| 1 |
| Written Plan |
| SCR 153 |
| Quality Control Plan |
| 2 |
| Certification/Documentation |
| SCR 107 |
| Noxious Weed Certification (Vehicles) |
| 3 |
| Testing |
| SCR 153 |
| Proctor Test |
| 4 |
| Testing |
| SCR 153 |
| Aggregate and Structural Backfill Testing |
| 5 |
| Written Plan |
| SCR 107 |
| Hazardous Spill Plan |
| 6 |
| Written Plan |
| SCR 156 |
| Travel Management Safety Plan |
| 7 |
| Written Plan |
| SCR 107 |
| Hazardous Spill Report (if required) |
| 8 |
| Written Plan |
| SCR 107 |
| Fire Prevention and Suppression Plan |
| 9 |
| Written Plan |
| SCR 153 |
| Proposal for Alternate Test Methods (if applicable) |
| 10 |
| Written Plan |
| SCR 157 |
| Erosion Control Plan |
| 11 |
| Written Plan |
| SCR 208 |
| Dewatering and Diversion Plan |
| 12 |
| Written Plan |
| SCR 203 |
| Demolition Plan |
| 13 |
| Written Plan |
| Standard Specifications 552 & 614 |
| Cold Weather Placement Plan |
| 14 |
| Written Plan |
| SCR 571 |
| Cold Weather Field Welding Procedure |
| 15 |
| Written Notice |
| Standard Specification 555 |
| Notice of Beginning Shop Work for Structural Steel Fabrication |
| Certification/Documentation |
| SCR 153 |
| Certification of Testing Personnel |
| 16 |
| Certification/Documentation |
| SCR 153 |
| Documentation of Testing Equipment |
| 17 |
| Certification/Documentation |
| SCR 571 |
| Certification of Modular Bridge Fabricator and Materials |
| 18 |
| Certification/Documentation |
| SCR 571 |
| Modular Bridge Components |
| 19 |
| Certification/Documentation |
| SCR 153 & 208 |
| Materials Test Reports |
| 20 |
| Certification/Documentation |
| Standard Specification 554.10 |
| Rebar Production Certification |
| 21 |
| Certification/Documentation |
| SCR 571 |
| Welder and Weld Inspector Certifications |
| 22 |
| Certification/Documentation |
| SCR 571 |
| NDI Weld Reports (as required) |
| 23 |
| Certification/Documentation |
| SCR 208.12 |
| Compaction Test Results |
| 24 |
| Certification/Documentation |
| SCR 552 |
| Concrete Mix Design |
| 25 |
| Certification/Documentation |
| SCR 552 |
| Admixture Compatibility |
| 26 |
| Certification/Documentation |
| Standard and SCR 552 |
| Concrete Test Results |
| Certification/Documentation |
| SCR 272 |
| Geocell and Geotextile |
| 27 |
| Documentation |
| Standard Specification 203.05 (a) and (d) |
| Disposal Agreements, Statements, and/or Permits |
| 28 |
| Documentation |
| SS 109.01 |
| Measurement Notes |
| 29 |
| Documentation |
| SCR 155 |
| Construction Schedule |
| 30 |
| Documentation |
| SS 203.05 (a) and (d) |
| Disposal Agreements, Statements, and Permits |
| 31 |
| Documentation |
| SCR 208.06 |
| Cofferdam fill source, construction and restoration method, if applicable. |
| 32 |
| Documentation |
| SCR 301.03 |
| Target Values for Aggregate |
| 33 |
| Drawings |
| SCR 104 |
| As-Built Drawings |
| 34 |
| Drawings |
| SCR 571 |
| Modular Bridge Shop Drawings |
| 35 |
| Drawings |
| SCR 571 |
| Modular Bridge |
Erection/Installation Drawings/Instructions
| 37 |
| Drawings |
| SCR 571 |
| Bridge Grade Beam & Sill Wall Shop Drawings |
| 38 |
| Drawings |
| SS 208 |
| Work Drawings & Construction Details of Excavation Support Systems (if applicable) |
| 39 |
| Drawings |
| SCR 554 |
| Rebar Shop Drawings |
| 40 |
| Calculations |
| SCR 571 |
| Substructure and Superstructure Calculations |
| 41 |
| Specifications |
| SCR 571 |
| Substructure and Superstructure Specifications |
| 42 |
| Specifications |
| SCR 571 |
| Substructure and Superstructure Assembly Instructions |