Pitkin DBA.pdf
PDF 140 KB Posted
- Attached to
- Weller Trail Bridge Reconstruction Federal contract opportunity
- Solicitation number
- AG-82X9-S-12-0157
- Issued by
- Department of Agriculture Forest Service
About this file
Attachment J.9 - DB Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82X9-S-12-0157 | — | |
| Summary of Changes.pdf | ||
| SF 30 Amend1.pdf | ||
| Weller_Hydrology_Hydraulics.pdf | ||
| Weller Trail Bridge Control Point Data.pdf | ||
| Page1.pdf | ||
| Weller Trail Bridge Survey Points Data.pdf | ||
| Page2.pdf | ||
| Page4.pdf | ||
| Emergency Fire Control.docx | DOCX document | |
| DESIGN Criteria.docx | DOCX document | |
| Page3.pdf | ||
| Required Submittals.docx | DOCX document | |
| RFP 1442.pdf | ||
| Specifications.doc | DOC document | |
| Page5.pdf | ||
| AG-82X9-S-12-0157 CAC(1) Review.rtf | RTF text file |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: CO120023 02/10/2012 CO23
Superseded General Decision Number: CO20100025
State: Colorado
Construction Type: Highway
Counties: Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Rio Blanco, Routt and Summit Counties in Colorado.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 01/06/2012
1 02/10/2012
CARP9901-009 10/01/2010
Rates Fringes
CARPENTER (Excludes Form Work)...$ 24.00 11.28
ELEC0068-017 03/01/2011
SUMMIT COUNTY
TRAFFIC SIGNALIZATION:
Traffic Signal Installation
Zone 1......................$ 26.42 4.75%+8.68
Zone 2......................$ 29.42 4.75%+8.68
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:
Colorado Springs - Nevada & Bijou
Denver - Ellsworth Avenue & Broadway
Ft. Collins - Prospect & College
Grand Junction - 12th & North Avenue
Pueblo - I-25 & Highway 50
All work outside of these areas shall be paid Zone 2 rates.
* ELEC0111-004 03/01/2011
ELECTRICIAN (Boom Truck
Operator)........................$ 20.91 3%+6.10
ENGI0009-013 05/01/2011
POWER EQUIPMENT OPERATOR:
(3)- Drill Rig Caisson
(smaller than Watson 2500 and similar)................$ 23.67 9.22
(5)-Drill Rig Caisson
(Watson 2500 similar or larger).....................$ 23.97 9.22
IRON0024-006 07/01/2011
Garfield County Only
Ironworkers:.....................$ 23.80 18.07
Structural
SUCO2011-008 09/15/2011
CARPENTER (Form Work Only)
Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt, Summit.......$ 15.92 5.38
Garfield....................$ 19.55 4.09
CEMENT MASON/CONCRETE FINISHER
Eagle.......................$ 17.59 2.85
Garfield....................$ 17.27 2.16
Grand, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt...............$ 18.23 2.85
Summit......................$ 15.55 2.85
ELECTRICIAN
Excludes Traffic
Signalization...............$ 28.06 8.76
Traffic Signalization
Electrician
Eagle, Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..$ 28.24 8.52
Traffic Signalization
Groundsman
Eagle, Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..$ 15.93 4.01
Summit.....................$ 16.75 4.10
GUARDRAIL INSTALLER
Eagle.......................$ 12.78 3.46
Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt, Summit.......$ 12.78 3.31
HIGHWAY/PARKING LOT STRIPING:
Truck Driver (Line Striping
Truck)...........................$ 14.60 3.49
HIGHWAY/PARKING LOT
STRIPING:Painter
Eagle.......................$ 13.85 3.07
Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt, Summitt......$ 13.97 3.07
IRONWORKER, REINFORCING
(Excludes Guardrail
Installation)....................$ 16.94 6.77
IRONWORKER, STRUCTURAL
(Excludes Guardrail
Installation)....................$ 22.22 6.01
LABORER
Asphalt Raker
Eagle......................$ 16.36 3.26
Garfield...................$ 18.66 3.53
Grand......................$ 17.90 3.02
Jackson, Lake, Moffat, Routt......................$ 17.75 3.75
Pitkin.....................$ 17.50 3.75
Rio Blanco.................$ 18.97 3.75
Summit.....................$ 16.77 3.26
Common or General
Eagle, Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco. Routt, Summitt.$ 12.44 3.53
Grand......................$ 19.14 3.53
Concrete Saw (Hand Held)....$ 16.00 6.14
Landscape and irrigation
Eagle......................$ 14.84 3.16
Landscape and Irrigation
Garfield, Grand, Jackson, Lake, Moffatt, Rio
Blanco, Routt..............$ 13.54 3.16
Pitkin.....................$ 14.16 3.16
Summit.....................$ 13.09 3.16
Mason Tender-
Cement/Concrete
Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summitt.$ 12.44 3.10
Garfield...................$ 14.87 3.10
Traffic Control (Flagger)...$ 9.42 3.21
Traffic Control (Sets
Up/Moves Barrels, Cones, Install Signs, Arrow
Boards and Place
Stationary Flags)(Excludes
Flaggers)
Eagle, Garfield, Grand, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 12.39 3.20
Jackson....................$ 12.93 3.22
PAINTER (Spray Only)
Eagle.......................$ 17.49 3.52
Garfield, Grand. Jackson, lake, Moffatt, Pitkin, Rio
Blanco, Routt...............$ 17.54 3.52
Summit......................$ 19.96 3.52
POWER EQUIPMENT OPERATOR:
Asphalt Laydown
Eagle, Summit..............$ 22.67 8.72
Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Routt......................$ 24.09 7.93
Rio Blanco.................$ 23.67 9.22
Asphalt Paver...............$ 22.67 8.72
Asphalt Plant...............$ 19.27 4.47
Asphalt Roller
Eagle......................$ 23.01 8.72
Garfield, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt, Summit......$ 23.15 8.07
Grand......................$ 22.67 8.72
Asphalt Spreader............$ 25.61 6.96
Backhoe/Trackhoe
Eagle......................$ 22.56 7.02
Garfield...................$ 19.40 4.42
Grand, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt..............$ 22.92 6.15
Summit.....................$ 24.30 5.75
Bobcat/Skid Loader
Eagle......................$ 18.25 4.32
Garfield...................$ 24.63 0.00
Grand, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt..............$ 21.04 5.18
Summit.....................$ 19.77 4.28
Broom/Sweeper
Eagle......................$ 23.35 7.78
Garfield, Jackson, Lake, Moffatt, Pitkin, Routt.....$ 21.92 7.66
Grand......................$ 21.67 8.22
Rio Blanco.................$ 21.66 0.00
Summit.....................$ 22.67 8.72
Bulldozer...................$ 26.78 7.05
Chipper.....................$ 22.04 8.26
Crane.......................$ 23.82 9.22
Drill.......................$ 20.84 2.66
Forklift....................$ 18.30 5.01
Grade Checker...............$ 23.82 9.22
Grader/Blade................$ 23.05 6.45
Guardrail/Post Driver.......$ 16.07 4.41
Loader (Front End)
Eagle......................$ 24.98 7.55
Garfield...................$ 21.93 9.22
Grand, Pitkin, Rio Blanco..$ 22.67 8.72
Jackson, Lake, Moffatt, Routt......................$ 24.07 7.92
Rio Blanco.................$ 23.67 9.22
Summit.....................$ 25.88 7.01
Mechanic
Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 23.31 3.93
Garfield...................$ 19.80 4.20
Oiler
Eagle......................$ 23.82 7.62
Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77
Roller/Compactor (Dirt and
Grade Compaction)
Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Routt..............$ 22.72 5.98
Rio Blanco.................$ 23.67 9.22
Summit.....................$ 24.38 6.11
Rotomill
Eagle......................$ 18.86 4.41
Garfield, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Routt..............$ 20.70 4.41
Grand......................$ 23.48 4.41
Summit.....................$ 16.28 4.41
Scraper.....................$ 20.60 7.99
Screed
Eagle......................$ 17.04 3.98
Garfield, Jackson, Lake, Moffatt, Pitkin, Rio
Blanco, Summit.............$ 23.76 5.05
Grand......................$ 23.29 4.05
Tractor.....................$ 15.08 2.95
TRUCK DRIVER
Distributor
Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Routt, Summit......$ 19.07 4.35
Rio Blanco.................$ 15.80 5.27
Dump Truck
Eagle......................$ 16.17 3.83
Garfield...................$ 16.29 3.83
Grand, Jackson, Lake, Moffatt, Routt.............$ 17.79 4.02
Pitkin.....................$ 20.13 4.15
Rio Blanco.................$ 17.26 4.63
Summit.....................$ 15.27 5.27
Lowboy Truck
Eagle......................$ 18.89 4.56
Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 18.43 4.56
Mechanic....................$ 17.79 3.51
Multi-Purpose Specialty &
Hoisting Truck..............$ 14.60 3.49
Pickup and Pilot Car........$ 14.04 3.49
Semi........................$ 20.72 0.00
Water Truck
Eagle......................$ 23.05 2.90
Garfield...................$ 21.00 5.88
Grand......................$ 21.19 3.01
Jackson, Lake, Moffatt, Ptikin, Routt, Summit......$ 20.39 3.43
Rio Blanco.................$ 17.25 3.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .