Section_B.docx

DOCX document 14 KB Posted

Attached to
Continental Divide National Scenic Trail Restoration
Solicitation number
AG-82D7-S-16-0019
Issued by

About this file

Section B

View the file

Other files

File Type Posted
Section_B_Base_Plus_Option_Years.docx DOCX document
Map_sheet_4.pdf PDF
Att_1_Prospect_cover.docx DOCX document
davisbacon_CO13_CO23.pdf PDF
Spec_list.docx DOCX document
ProspectorLog.doc DOC document
Map_sheet_3.pdf PDF
Clauses.docx DOCX document
AG-82D7-S-16-0019.pdf PDF
Drawings_pdf.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continental Divide National Scenic Trail Section B

PAY ITEM
ITEM DESCRIPTION
METHOD OF MEASURE
ESTIMATED QUANTITY
PAY UNIT
ESTIMATED COST PER UNIT
TOTAL COST
911(02)
Clearing and Grubbing
A.Q.
23719
L.F.
911(08)
Grubbing
A.Q.
11722
L.F.
912(01)
Excavation
A.Q.
35224
L.F.
912(07)
Shallow Stream Ford and Gully Xing
A.Q.
2
Each
912(09)
Ditch
A.Q.
26
L.F.
912(10)
Borrow
A.Q.
67
C.Y.
912(15)
Talus and Rubble Rock Section
A.Q.
2031
L.F.
913(01)
Turnpike - Rock Retainer
A.Q.
35
L.F.
913(03)
Non-Woven Heavy Duty Stabilization Fabric
A.Q.
577
S.Y.
914(01)
Switchback - Type 1
A.Q.
3
Each
914(05)
Barrier - Log
A.Q.
134
L.F.
915(01)
Trail Restoration
A.Q.
767
L.F.
921(05)
Rock Culverts
A.Q.
4
L.F.
922(02)
Rock Waterbar
A.Q.
6
Each
935(01)
Rock Retaining Wall
A.Q.
1337
S.F.
951(01)
Mobilization
L.S.Q.
1
L.S.
952(03)
Treated Sign Posts
A.Q.
4
Each
952(04)
Native Marker Posts
A.Q.
1
Each
952(09)
Rock Cairns
A.Q.
23
Each
954(04)
Trail Obliteration - Closure
A.Q.
996
L.F.

Total

File details come from the government source that posted it. Updated .