ProspectorLog.doc

DOC document 67 KB Posted

Attached to
Continental Divide National Scenic Trail Restoration
Solicitation number
AG-82D7-S-16-0019
Issued by

About this file

Prospector Log

View the file

Other files

File Type Posted
Section_B_Base_Plus_Option_Years.docx DOCX document
Map_sheet_4.pdf PDF
Section_B.docx DOCX document
Att_1_Prospect_cover.docx DOCX document
davisbacon_CO13_CO23.pdf PDF
Spec_list.docx DOCX document
Map_sheet_3.pdf PDF
Clauses.docx DOCX document
AG-82D7-S-16-0019.pdf PDF
Drawings_pdf.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: AG-82D7-S-16-0019

Continental Divide Trail

Prospector Section

Continental Divide National Scenic Trail

Gunnison Ranger District

Grand Mesa, Uncompahgre & Gunnison

National Forest

Station (Feet)

Description

Pay Item

0+00

Begin Project/Jct. with Texas Creek Trail #416

Begin New Construction

Begin Grubbing

911 (08)

Begin Excavation

912 (01)

Install Sign Post as Staked

952 (03)

0+94

Reference Point/Centerline

2+18

Install Native Marker Post as Staked

952 (04)

3+54

Jct. with Waterloo Gulch Trail #541-Right

Install Sign Post as Staked-Right

End New Construction

End Grubbing

End Excavation

Begin Trail Restoration/Reconstruction

915 (01)

5+00

Reference Point/Left

8+05

Reference Point/Right

10+15

Construct Low Water Stream Ford

912 (07)

Cross Creek

10+50

Reference Point/Turn Right Up Drainage/West

Side of Creek

Obliterate Trail Left 896 ft. down to Texas Creek 954 (04)

Trail #416

11+21

End Trail Restoration/Reconstruction

915 (01)

Begin New Trail Construction

Begin Clearing and Grubbing

911 (02)

12+24

Reference Point/Centerline

13+67

Reference Point/Centerline

15+16

Reference Point/Centerline

Leave Old Trail and Drainage/Left

Obliterate Trail/Right 100 ft.

954 (04)

15+26

Install Sign Post as Staked

15+49

Reference Point/Centerline

16+81

End New Trail Construction

Begin Switchback Approach Construction

914 (01)

17+21

Radius Point 6 ft. Switchback/Heavy Rock Work

Blasting Possible

80% Sideslope

Install 28 ft. Log Barrier as Staked

914 (05)

17+48

End Switchback Approach

17+89

Reference Point/Centerline/Roll Grade to Drain

18+07

Reference Point/Centerline

18+72

Reference Point/Centerline

19+18

Reference Point/Centerline

19+78

Reference Point/Centerline/START 2016 CONTRACT HERE 20+44

Reference Point/Centerline

21+35

Reference Point/Centerline

22+02

Reference Point/Centerline/48% Sideslope

23+31

Reference Point/Centerline

25+27

Reference Point/Centerline

26+53

Reference Point/Centerline

28+23

Reference Point/Centerline/54% Sideslope

30+16

Reference Point/Centerline/Roll Grade to Drain

31+71

Reference Point/Centerline

32+36

Reference Point/Centerline

33+73

Reference Point/Centerline

34+97

Reference point/Centerline

36+24

Reference Point/Centerline

37+42

Reference Point/Centerline

38+54

Reference Point/Centerline/63% Sideslope

39+86

Reference Point/Centerline 40+33

Reference Point/Centerline

40+80

Reference Point/Centerline

41+09

Reference Point/Centerline

41+77

Reference Point/Centerline/67% Sideslope

43+10

Reference Point/Centerline

44+43

Reference Point/Centerline

44+93

Reference Point/Cross Small Stream/No Stake

45+51

Reference Point/Centerline

46+39

Reference Point/Centerline

46+57

Begin Turnpike/Rock Retainer/Fabric Reinforced 913 (01)

No Ditch

46+74

End Turnpike

47+17

Reference Point/Cross Small Stream/No Stake

48+93

Reference Point/Next to 18” Spruce/Right

49+81

Install 12 ft. Ditch to Drain Small Stream

912 (09)

50+16

Install 8 ft. Ditch to Drain Small Stream

912 (09)

50+82

Reference Point/Centerline

53+58

Reference Point/Centerline

55+03

Reference Point/Centerline

57+00

Reference Point/Centerline

59+67

Reference Point/Centerline/Climbing Turn to Right

60+61

Reference Point/Centerline/30% Sideslope

62+07

Reference Point/Centerline/Roll Grade to Drain

63+51

Reference Point/Centerline

64+38

Reference Point/Centerline/Climbing Turn to Left

64+92

Reference Point/Centerline

65+96

Reference Point/Centerline/43% Sideslope

67+86

Reference Point/Centerline/ Roll Grade to Drain

69+17

Reference Point/Centerline

70+74

Reference Point/Centerline

72+26

Reference Point/Centerline/30% Sideslope

73+45

Reference Point/Centerline

74+63

Reference Point/Centerline

76+69

Reference Point/Centerline

77+88

Reference Point/Centerline

79+20

Reference Point/Centerline

80+60

Reference Point/Centerline

81+86

Reference Point/Centerline

82+91

Reference Point/Centerline

84+77

Reference Point/Centerline

86+52

Reference Point/Centerline

87+57

Reference Point/Centerline/45% Sideslope

89+44

Reference Point/Centerline

90+66

Reference Point/Centerline

92+75

Reference Point/Centerline

93+84

Reference Point/Centerline

95+46

Reference Point/Centerline

96+76

Reference Point/Centerline

97+99

Reference Point/Centerline

99+24

Reference Point/Centerline

100+59 Reference Point/Centerline

101+94 Reference Point/Centerline

103+70 Reference Point/Centerline/63% Sideslope

105+61 Reference Point/Centerline

106+58 Reference Point/Centerline/Heavy Rock Work/

107+03 Reference Point/Centerline

108+31 Reference Point/Centerline/Roll Grade to Drain

109+67 End Clearing and Grubbing

Begin Talus or Rubble Rock Section

912 (15)

110+91

111+80 End Talus or Rubble Rock Section

112+00 Reference Point/Centerline/Cross Bottom of

Depression

112+78

Begin Talus and Rubble Rock Section

113+05 End Talus and Rubble Rock Section

113+88 Reference Point/Centerline/Heavy Rock Work

114+55 Reference Point/Centerline

115+78 Reference Point/Centerline/Roll Grade to Drain

117+00 Reference Point/Centerline

117+69 Reference Point/Centerline

118+42 Reference Point/Centerline

119+88 Reference Point/Centerline

120+93 Reference Point/Centerline/53% Sideslope

122+44 Reference Point/Centerline

123+36 Reference Point/Centerline

125+29 Reference Point/Centerline

126+94 Reference point/Centerline

128+57 Reference Point/Centerline/Heavy Rock Work/

129+78 Reference Point/Centerline

130+57 Reference Point/Centerline

131+02 Reference Point/Centerline/Cross Small 1 ft. Wide Stream 131+73 Reference Point/Centerline/Heavy Rock Work

133+63 Reference Point/Centerline

134+45 Reference Point/Centerline

135+42 Reference Point/Centerline

136+03 Reference Point/Centerline

137+08 Reference Point/Centerline

138+43 Reference Point/Centerline

138+99 Reference Point/Centerline/35% Sideslope

140+38 Reference Point/Centerline

141+43 Reference Point/Centerline

142+70 Reference Point/Centerline 143+32 Reference Point/Centerline

144+25 Reference Point/Centerline

145+06 Reference Point/Centerline

145+80 Reference Point/Centerline

146+80 Reference Point/Centerline

148+14 Reference Point/Centerline

148+87 Reference Point/Centerline

149+40 Reference Point/Centerline/Cross Spring

150+35 Reference Point/Centerline

150+68

Begin Turnpike/Fabric Reinforced/Rock Retainer

No Ditch

150+77 Install Rock Culvert/4 ft. Long

921 (05)

150+86 End Turnpike

151+39

152+12

152+57

Begin Switchback Approach

152+79 Radius Point 6 ft. Switchback

Install 30 ft. Log Barrier as Staked

153+17

153+52

Install 40 ft. Log Barrier Below

953 (01)

154+24

Begin Switchback Approach/Centerline

154+52 Radius Point 6 ft. Switchback/60% Sideslope

Install 36 ft. Log Barrier Inside Switchback

As Staked

154+79

156+21 Reference Point/Centerline

157+65 Reference Point/Centerline

158+53 Reference Point/Centerline

160+06 Reference Point/Centerline

161+27 Reference Point/Centerline

162+50 Reference Point/Centerline

163+79 Reference Point/Centerline/Roll Grade to Drain

164+97 Reference Point/Centerline

166+22 Reference Point/Centerline

167+31 Reference Point/Centerline/Cross Small Stream

167+70 Reference Point/Centerline

168+78 Reference Point/Centerline/55% Sideslope

169+48 Reference Point/Centerline

170+45 Reference Point/Centerline

171+30 Reference Point/Centerline

172+04

Begin Grubbing Only

Continue Excavation

172+90 Reference Point/Centerline

173+12 Construct Rock Cairn as Staked

952 (09)

173+24

174+46 Reference Point/Centerline 175+44

175+52

176+07

177+07 Reference Point/Centerline

178+48 Reference Point/Centerline/Cross Small Stream

179+61 Reference Point/Centerline

180+79 Reference Point/Centerline

181+48 Reference Point/Centerline

181+64

182+63 Reference Point/Centerline

182+90

183+07

184+82

Heavy Rock Work/Blasting Possible

185+55

186+40 Cross Small Stream/Reference Point/Centerline

186+87 Cross Small Stream/Reference Point/Centerline

No Stake

187+21

188+90

190+10 Reference Point/Centerline

191+49

192+57 Reference Point/Centerline

193+01 Reference Point/Centerline

193+78 Reference Point/Centerline

194+59 Reference Point/Centerline

196+28 Reference Point/Centerline

198+14 Reference Point/Centerline

199+56 Reference Point/Centerline

201+00 Reference Point/Centerline

201+58 Reference Point/Centerline

202+08 Reference Point/Centerline

202+35 Construct Low Water Stream Ford

912 (07)

202+94 Reference Point/Centerline

204+04

Possible Campsite Up the Hill on Bench

205+95 Reference Point/Centerline

207+11 Reference Point/Centerline

208+41 Reference Point/Centerline

210+67 Reference Point/Centerline

211+66 Reference Point/Centerline

212+43 Reference Point/Centerline

213+28 Reference Point/Centerline

214+44 Reference Point/Centerline

215+92 Reference Point/Centerline/Climbing Turn-Right

216+81 Reference Point/Centerline

217+93 Reference Point/Centerline/36% Sideslope

218+78 Reference Point/Centerline

219+52 Reference Point/Centerline/Climbing Turn-Left

220+33 Reference Point/Centerline

221+62 Reference Point/Centerline

222+35 Reference Point/Centerline

223+61 Reference Point/Centerline

224+25 Reference Point/Centerline/Cross Small Stream

225+73 Reference Point/Centerline 226+73 Reference Point/Centerline/Heavy Rock Work

227+41 Reference Point/Centerline

227+53

Heavy Rock Work/Blasting Possible

228+92

54% Sideslope

229+25 Reference Point/Centerline

230+50 Reference Point/Centerline/Roll Grade to Drain

231+25 Reference Point/Centerline

232+08 Reference Point/Centerline

233+71 Reference Point/Centerline 234+37

236+64

237+36 Reference Point/Centerline

239+51

240+80 Reference Point/Centerline

241+40

242+36

Intersect Game Trail

245+24 Reference Point/Centerline

247+34 Reference Point/Centerline/Roll Grade to Drain

249+95 Reference Point/Centerline

251+71 Reference Point/Centerline

253+21 Reference Point/Centerline/Roll Grade to Drain

254+10 Reference Point/Centerline/Ridge

254+65 Reference Point/Centerline

255+68 Reference Point/Centerline

257+28 Reference Point/Centerline

259+16 Reference Point/Centerline

260+49 Reference point/Centerline

261+38 Reference point/Centerline/50% Sideslope

262+87

264+14 Reference Point/Centerline

265+48

265+87 Reference Point/Centerline

267+16 Reference Point/Centerline

268+24

269+37 Reference Point/Centerline

270+10

271+25 Reference Point/Centerline

271+74

272+37 Reference Point/Centerline

273+37 Reference Point/Centerline

273+83

274+82 Reference Point/Centerline

276+42 Reference Point/Centerline

277+03

277+67 Reference Point/Centerline

278+61 Reference Point/Centerline

280+14 Reference Point/Centerline

280+71 Reference Point/Centerline

281+29 Reference Point/Centerline

282+58 Reference Point/Centerline

283+18 Reference Point/Centerline

285+11 Reference Point/Centerline

286+29 Reference Point/Centerline

287+62 Reference Point/Centerline

288+70

289+79 Install Rock Waterbar

922 (02)

290+24

291+16

Begin 2 ft. High Rock Retaining Wall

935 (01)

292+56 End 2 ft. High Rock Retaining Wall

293+70 Reference point/Centerline

294+22 Reference Point/Centerline

295+42 Reference Point/Centerline

296+31

296+60

297+29 Reference Point/Centerline

298+72 Reference Point/Centerline

300+15 Reference Point/Centerline/Enter Willows

300+41 Reference Point/Cross Small Stream/No Stake

301+16 Reference Point/Centerline

303+02 Reference Point/Centerline

304+91 Reference Point/Centerline

307+12 Reference Point/Centerline

308+72 Install 6 ft. Ditch to Drain Spring

912 (09)

Rock Plate Crossing-10 ft.

309+42 Reference Point/Centerline/Climbing Turn

310+22 Reference Point/Centerline

310+80

311+95 Reference Point/Centerline

312+63 Reference Point/Centerline

312+71

313+34

314+16 Reference Point/Centerline

315+07

315+47

Begin 1.5 ft. High Rock Retaining Wall

315+63 End 1.5 ft. High Rock Retaining Wall

935 (01)

316+27 Reference Point/Centerline/50-60% Sideslope

317+45 Reference Point/Centerline

318+57 Reference Point/Centerline

319+52 Reference Point/Centerline/Roll Grade to Drain

320+19 Begin Rock Plating Across Springs

320+73 End Rock Plating

321+43 Reference Point/Centerline/41% Sideslope

322+41 Reference Point/Centerline/Roll Grade to Drain

323+10 Reference Point/Centerline

324+79 Reference Point/Centerline

326+05 Reference Point/Centerline

327+10 Reference Point/Centerline/Roll Grade to Drain

327+42 Reference Point/Centerline

329+14 Reference Point/Centerline

331+11 Reference Point/Centerline

332+47 Reference Point/Centerline

333+39

End Tread Construction

335+36 Begin Tread Construction

335+75 Reference Point/Centerline

336+09

337+41 Reference Point/Centerline/Roll Grade to Drain

337+88 Reference Point/Centerline

338+16

Follow Game Trail Uphill

338+70

339+41 Reference Point/Centerline/Roll Grade Downhill to Drain

340+04

340+82

340+95 Reference point/Centerline/Resume Grade Uphill

341+40 Reference Point/Gully/No Stake

341+92

342+56

342+68

Leave Game Trail/Go Left

342+93

343+61 Reference Point/Centerline/64% Sideslope

Roll Grade Downhill to Drain

343+70 Reference Point/Centerline/Resume Grade Uphill

344+10 Reference Point/Centerline

344+41 Reference Point/Centerline

344+96

Begin 1.5 ft. High Rock Retaining Wall/Left

345+40 Reference Point/Centerline 345+84 End 1.5 ft. High Rock Retaining Wall

935 (01)

346+37

346+68 Reference Point/Centerline/Resume Grade Uphill 347+36 Reference Point/Centerline

348+06 Reference Point/Centerline

348+44

350+08 Reference Point/Centerline

351+53 Reference Point/Centerline

351+72 Construct Rock Cairn to Right Uphill 8 ft.

952 (09)

352+87 Reference Point/Centerline/Roll Grade to Drain

353+84 Reference Point/Centerline

355+37 Reference Point/Centerline/Roll Grade to Drain

355+93 Reference Point/Centerline

357+17 Reference Point/Centerline/52% Sideslope

358+50 Reference Point/Centerline

359+07

359+92

360+98 Reference Point/Centerline

361+43

361+71

362+14

362+79

363+52

Continue Talus and Rubble Rock Section

35-40% Sideslope

364+23 Reference Point/Centerline/60% Sideslope

365+27

365+60

Begin 1.5 ft. High Rock Retaining Wall

Begin Talus and Rubble rock Section

367+38

End 1.5 ft. High Retaining Wall

367+89 Reference Point/Centerline/Roll Grade to Drain

368+35 Reference Point/Centerline

369+33 Reference Point/Centerline

370+04

371+18

371+56

372+05 Reference Point/Centerline

372+62 Reference Point/Centerline

373+22 Reference Point/Centerline/Blasting Possible Ahead or Behind

373+59 End Talus or Rubble Rock Section

374+19 Reference Point/Centerline

374+45

374+67

375+31 Reference Point/Centerline

375+75

376+02

376+42

377+08

377+90 Reference Point/Centerline

378+45 Reference Point/Centerline

379+15 Reference Point/Centerline/Roll Grade to Drain

379+99

Construct Rock Cairn as Staked to Right

381+56 Reference Point/Centerline

382+88 Reference Point/Centerline

384+50 Reference Point/Centerline/Roll Grade to Drain

385+34 Reference Point/Centerline

386+07 Install Sign Post as Staked-Right

386+14 End New Trail Construction

Jct. with Lake Ann Trail #592

End of Project