ProspectorLog.doc
DOC document 67 KB Posted
- Solicitation number
- AG-82D7-S-16-0019
About this file
Prospector Log
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_B_Base_Plus_Option_Years.docx | DOCX document | |
| Map_sheet_4.pdf | ||
| Section_B.docx | DOCX document | |
| Att_1_Prospect_cover.docx | DOCX document | |
| davisbacon_CO13_CO23.pdf | ||
| Spec_list.docx | DOCX document | |
| Map_sheet_3.pdf | ||
| Clauses.docx | DOCX document | |
| AG-82D7-S-16-0019.pdf | ||
| Drawings_pdf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: AG-82D7-S-16-0019
Continental Divide Trail
Prospector Section
Continental Divide National Scenic Trail
Gunnison Ranger District
Grand Mesa, Uncompahgre & Gunnison
National Forest
Station (Feet)
Description
Pay Item
0+00
Begin Project/Jct. with Texas Creek Trail #416
Begin New Construction
Begin Grubbing
911 (08)
Begin Excavation
912 (01)
Install Sign Post as Staked
952 (03)
0+94
Reference Point/Centerline
2+18
Install Native Marker Post as Staked
952 (04)
3+54
Jct. with Waterloo Gulch Trail #541-Right
Install Sign Post as Staked-Right
End New Construction
End Grubbing
End Excavation
Begin Trail Restoration/Reconstruction
915 (01)
5+00
Reference Point/Left
8+05
Reference Point/Right
10+15
Construct Low Water Stream Ford
912 (07)
Cross Creek
10+50
Reference Point/Turn Right Up Drainage/West
Side of Creek
Obliterate Trail Left 896 ft. down to Texas Creek 954 (04)
Trail #416
11+21
End Trail Restoration/Reconstruction
915 (01)
Begin New Trail Construction
Begin Clearing and Grubbing
911 (02)
12+24
Reference Point/Centerline
13+67
Reference Point/Centerline
15+16
Reference Point/Centerline
Leave Old Trail and Drainage/Left
Obliterate Trail/Right 100 ft.
954 (04)
15+26
Install Sign Post as Staked
15+49
Reference Point/Centerline
16+81
End New Trail Construction
Begin Switchback Approach Construction
914 (01)
17+21
Radius Point 6 ft. Switchback/Heavy Rock Work
Blasting Possible
80% Sideslope
Install 28 ft. Log Barrier as Staked
914 (05)
17+48
End Switchback Approach
17+89
Reference Point/Centerline/Roll Grade to Drain
18+07
Reference Point/Centerline
18+72
Reference Point/Centerline
19+18
Reference Point/Centerline
19+78
Reference Point/Centerline/START 2016 CONTRACT HERE 20+44
Reference Point/Centerline
21+35
Reference Point/Centerline
22+02
Reference Point/Centerline/48% Sideslope
23+31
Reference Point/Centerline
25+27
Reference Point/Centerline
26+53
Reference Point/Centerline
28+23
Reference Point/Centerline/54% Sideslope
30+16
Reference Point/Centerline/Roll Grade to Drain
31+71
Reference Point/Centerline
32+36
Reference Point/Centerline
33+73
Reference Point/Centerline
34+97
Reference point/Centerline
36+24
Reference Point/Centerline
37+42
Reference Point/Centerline
38+54
Reference Point/Centerline/63% Sideslope
39+86
Reference Point/Centerline 40+33
Reference Point/Centerline
40+80
Reference Point/Centerline
41+09
Reference Point/Centerline
41+77
Reference Point/Centerline/67% Sideslope
43+10
Reference Point/Centerline
44+43
Reference Point/Centerline
44+93
Reference Point/Cross Small Stream/No Stake
45+51
Reference Point/Centerline
46+39
Reference Point/Centerline
46+57
Begin Turnpike/Rock Retainer/Fabric Reinforced 913 (01)
No Ditch
46+74
End Turnpike
47+17
Reference Point/Cross Small Stream/No Stake
48+93
Reference Point/Next to 18” Spruce/Right
49+81
Install 12 ft. Ditch to Drain Small Stream
912 (09)
50+16
Install 8 ft. Ditch to Drain Small Stream
912 (09)
50+82
Reference Point/Centerline
53+58
Reference Point/Centerline
55+03
Reference Point/Centerline
57+00
Reference Point/Centerline
59+67
Reference Point/Centerline/Climbing Turn to Right
60+61
Reference Point/Centerline/30% Sideslope
62+07
Reference Point/Centerline/Roll Grade to Drain
63+51
Reference Point/Centerline
64+38
Reference Point/Centerline/Climbing Turn to Left
64+92
Reference Point/Centerline
65+96
Reference Point/Centerline/43% Sideslope
67+86
Reference Point/Centerline/ Roll Grade to Drain
69+17
Reference Point/Centerline
70+74
Reference Point/Centerline
72+26
Reference Point/Centerline/30% Sideslope
73+45
Reference Point/Centerline
74+63
Reference Point/Centerline
76+69
Reference Point/Centerline
77+88
Reference Point/Centerline
79+20
Reference Point/Centerline
80+60
Reference Point/Centerline
81+86
Reference Point/Centerline
82+91
Reference Point/Centerline
84+77
Reference Point/Centerline
86+52
Reference Point/Centerline
87+57
Reference Point/Centerline/45% Sideslope
89+44
Reference Point/Centerline
90+66
Reference Point/Centerline
92+75
Reference Point/Centerline
93+84
Reference Point/Centerline
95+46
Reference Point/Centerline
96+76
Reference Point/Centerline
97+99
Reference Point/Centerline
99+24
Reference Point/Centerline
100+59 Reference Point/Centerline
101+94 Reference Point/Centerline
103+70 Reference Point/Centerline/63% Sideslope
105+61 Reference Point/Centerline
106+58 Reference Point/Centerline/Heavy Rock Work/
107+03 Reference Point/Centerline
108+31 Reference Point/Centerline/Roll Grade to Drain
109+67 End Clearing and Grubbing
Begin Talus or Rubble Rock Section
912 (15)
110+91
111+80 End Talus or Rubble Rock Section
112+00 Reference Point/Centerline/Cross Bottom of
Depression
112+78
Begin Talus and Rubble Rock Section
113+05 End Talus and Rubble Rock Section
113+88 Reference Point/Centerline/Heavy Rock Work
114+55 Reference Point/Centerline
115+78 Reference Point/Centerline/Roll Grade to Drain
117+00 Reference Point/Centerline
117+69 Reference Point/Centerline
118+42 Reference Point/Centerline
119+88 Reference Point/Centerline
120+93 Reference Point/Centerline/53% Sideslope
122+44 Reference Point/Centerline
123+36 Reference Point/Centerline
125+29 Reference Point/Centerline
126+94 Reference point/Centerline
128+57 Reference Point/Centerline/Heavy Rock Work/
129+78 Reference Point/Centerline
130+57 Reference Point/Centerline
131+02 Reference Point/Centerline/Cross Small 1 ft. Wide Stream 131+73 Reference Point/Centerline/Heavy Rock Work
133+63 Reference Point/Centerline
134+45 Reference Point/Centerline
135+42 Reference Point/Centerline
136+03 Reference Point/Centerline
137+08 Reference Point/Centerline
138+43 Reference Point/Centerline
138+99 Reference Point/Centerline/35% Sideslope
140+38 Reference Point/Centerline
141+43 Reference Point/Centerline
142+70 Reference Point/Centerline 143+32 Reference Point/Centerline
144+25 Reference Point/Centerline
145+06 Reference Point/Centerline
145+80 Reference Point/Centerline
146+80 Reference Point/Centerline
148+14 Reference Point/Centerline
148+87 Reference Point/Centerline
149+40 Reference Point/Centerline/Cross Spring
150+35 Reference Point/Centerline
150+68
Begin Turnpike/Fabric Reinforced/Rock Retainer
No Ditch
150+77 Install Rock Culvert/4 ft. Long
921 (05)
150+86 End Turnpike
151+39
152+12
152+57
Begin Switchback Approach
152+79 Radius Point 6 ft. Switchback
Install 30 ft. Log Barrier as Staked
153+17
153+52
Install 40 ft. Log Barrier Below
953 (01)
154+24
Begin Switchback Approach/Centerline
154+52 Radius Point 6 ft. Switchback/60% Sideslope
Install 36 ft. Log Barrier Inside Switchback
As Staked
154+79
156+21 Reference Point/Centerline
157+65 Reference Point/Centerline
158+53 Reference Point/Centerline
160+06 Reference Point/Centerline
161+27 Reference Point/Centerline
162+50 Reference Point/Centerline
163+79 Reference Point/Centerline/Roll Grade to Drain
164+97 Reference Point/Centerline
166+22 Reference Point/Centerline
167+31 Reference Point/Centerline/Cross Small Stream
167+70 Reference Point/Centerline
168+78 Reference Point/Centerline/55% Sideslope
169+48 Reference Point/Centerline
170+45 Reference Point/Centerline
171+30 Reference Point/Centerline
172+04
Begin Grubbing Only
Continue Excavation
172+90 Reference Point/Centerline
173+12 Construct Rock Cairn as Staked
952 (09)
173+24
174+46 Reference Point/Centerline 175+44
175+52
176+07
177+07 Reference Point/Centerline
178+48 Reference Point/Centerline/Cross Small Stream
179+61 Reference Point/Centerline
180+79 Reference Point/Centerline
181+48 Reference Point/Centerline
181+64
182+63 Reference Point/Centerline
182+90
183+07
184+82
Heavy Rock Work/Blasting Possible
185+55
186+40 Cross Small Stream/Reference Point/Centerline
186+87 Cross Small Stream/Reference Point/Centerline
No Stake
187+21
188+90
190+10 Reference Point/Centerline
191+49
192+57 Reference Point/Centerline
193+01 Reference Point/Centerline
193+78 Reference Point/Centerline
194+59 Reference Point/Centerline
196+28 Reference Point/Centerline
198+14 Reference Point/Centerline
199+56 Reference Point/Centerline
201+00 Reference Point/Centerline
201+58 Reference Point/Centerline
202+08 Reference Point/Centerline
202+35 Construct Low Water Stream Ford
912 (07)
202+94 Reference Point/Centerline
204+04
Possible Campsite Up the Hill on Bench
205+95 Reference Point/Centerline
207+11 Reference Point/Centerline
208+41 Reference Point/Centerline
210+67 Reference Point/Centerline
211+66 Reference Point/Centerline
212+43 Reference Point/Centerline
213+28 Reference Point/Centerline
214+44 Reference Point/Centerline
215+92 Reference Point/Centerline/Climbing Turn-Right
216+81 Reference Point/Centerline
217+93 Reference Point/Centerline/36% Sideslope
218+78 Reference Point/Centerline
219+52 Reference Point/Centerline/Climbing Turn-Left
220+33 Reference Point/Centerline
221+62 Reference Point/Centerline
222+35 Reference Point/Centerline
223+61 Reference Point/Centerline
224+25 Reference Point/Centerline/Cross Small Stream
225+73 Reference Point/Centerline 226+73 Reference Point/Centerline/Heavy Rock Work
227+41 Reference Point/Centerline
227+53
Heavy Rock Work/Blasting Possible
228+92
54% Sideslope
229+25 Reference Point/Centerline
230+50 Reference Point/Centerline/Roll Grade to Drain
231+25 Reference Point/Centerline
232+08 Reference Point/Centerline
233+71 Reference Point/Centerline 234+37
236+64
237+36 Reference Point/Centerline
239+51
240+80 Reference Point/Centerline
241+40
242+36
Intersect Game Trail
245+24 Reference Point/Centerline
247+34 Reference Point/Centerline/Roll Grade to Drain
249+95 Reference Point/Centerline
251+71 Reference Point/Centerline
253+21 Reference Point/Centerline/Roll Grade to Drain
254+10 Reference Point/Centerline/Ridge
254+65 Reference Point/Centerline
255+68 Reference Point/Centerline
257+28 Reference Point/Centerline
259+16 Reference Point/Centerline
260+49 Reference point/Centerline
261+38 Reference point/Centerline/50% Sideslope
262+87
264+14 Reference Point/Centerline
265+48
265+87 Reference Point/Centerline
267+16 Reference Point/Centerline
268+24
269+37 Reference Point/Centerline
270+10
271+25 Reference Point/Centerline
271+74
272+37 Reference Point/Centerline
273+37 Reference Point/Centerline
273+83
274+82 Reference Point/Centerline
276+42 Reference Point/Centerline
277+03
277+67 Reference Point/Centerline
278+61 Reference Point/Centerline
280+14 Reference Point/Centerline
280+71 Reference Point/Centerline
281+29 Reference Point/Centerline
282+58 Reference Point/Centerline
283+18 Reference Point/Centerline
285+11 Reference Point/Centerline
286+29 Reference Point/Centerline
287+62 Reference Point/Centerline
288+70
289+79 Install Rock Waterbar
922 (02)
290+24
291+16
Begin 2 ft. High Rock Retaining Wall
935 (01)
292+56 End 2 ft. High Rock Retaining Wall
293+70 Reference point/Centerline
294+22 Reference Point/Centerline
295+42 Reference Point/Centerline
296+31
296+60
297+29 Reference Point/Centerline
298+72 Reference Point/Centerline
300+15 Reference Point/Centerline/Enter Willows
300+41 Reference Point/Cross Small Stream/No Stake
301+16 Reference Point/Centerline
303+02 Reference Point/Centerline
304+91 Reference Point/Centerline
307+12 Reference Point/Centerline
308+72 Install 6 ft. Ditch to Drain Spring
912 (09)
Rock Plate Crossing-10 ft.
309+42 Reference Point/Centerline/Climbing Turn
310+22 Reference Point/Centerline
310+80
311+95 Reference Point/Centerline
312+63 Reference Point/Centerline
312+71
313+34
314+16 Reference Point/Centerline
315+07
315+47
Begin 1.5 ft. High Rock Retaining Wall
315+63 End 1.5 ft. High Rock Retaining Wall
935 (01)
316+27 Reference Point/Centerline/50-60% Sideslope
317+45 Reference Point/Centerline
318+57 Reference Point/Centerline
319+52 Reference Point/Centerline/Roll Grade to Drain
320+19 Begin Rock Plating Across Springs
320+73 End Rock Plating
321+43 Reference Point/Centerline/41% Sideslope
322+41 Reference Point/Centerline/Roll Grade to Drain
323+10 Reference Point/Centerline
324+79 Reference Point/Centerline
326+05 Reference Point/Centerline
327+10 Reference Point/Centerline/Roll Grade to Drain
327+42 Reference Point/Centerline
329+14 Reference Point/Centerline
331+11 Reference Point/Centerline
332+47 Reference Point/Centerline
333+39
End Tread Construction
335+36 Begin Tread Construction
335+75 Reference Point/Centerline
336+09
337+41 Reference Point/Centerline/Roll Grade to Drain
337+88 Reference Point/Centerline
338+16
Follow Game Trail Uphill
338+70
339+41 Reference Point/Centerline/Roll Grade Downhill to Drain
340+04
340+82
340+95 Reference point/Centerline/Resume Grade Uphill
341+40 Reference Point/Gully/No Stake
341+92
342+56
342+68
Leave Game Trail/Go Left
342+93
343+61 Reference Point/Centerline/64% Sideslope
Roll Grade Downhill to Drain
343+70 Reference Point/Centerline/Resume Grade Uphill
344+10 Reference Point/Centerline
344+41 Reference Point/Centerline
344+96
Begin 1.5 ft. High Rock Retaining Wall/Left
345+40 Reference Point/Centerline 345+84 End 1.5 ft. High Rock Retaining Wall
935 (01)
346+37
346+68 Reference Point/Centerline/Resume Grade Uphill 347+36 Reference Point/Centerline
348+06 Reference Point/Centerline
348+44
350+08 Reference Point/Centerline
351+53 Reference Point/Centerline
351+72 Construct Rock Cairn to Right Uphill 8 ft.
952 (09)
352+87 Reference Point/Centerline/Roll Grade to Drain
353+84 Reference Point/Centerline
355+37 Reference Point/Centerline/Roll Grade to Drain
355+93 Reference Point/Centerline
357+17 Reference Point/Centerline/52% Sideslope
358+50 Reference Point/Centerline
359+07
359+92
360+98 Reference Point/Centerline
361+43
361+71
362+14
362+79
363+52
Continue Talus and Rubble Rock Section
35-40% Sideslope
364+23 Reference Point/Centerline/60% Sideslope
365+27
365+60
Begin 1.5 ft. High Rock Retaining Wall
Begin Talus and Rubble rock Section
367+38
End 1.5 ft. High Retaining Wall
367+89 Reference Point/Centerline/Roll Grade to Drain
368+35 Reference Point/Centerline
369+33 Reference Point/Centerline
370+04
371+18
371+56
372+05 Reference Point/Centerline
372+62 Reference Point/Centerline
373+22 Reference Point/Centerline/Blasting Possible Ahead or Behind
373+59 End Talus or Rubble Rock Section
374+19 Reference Point/Centerline
374+45
374+67
375+31 Reference Point/Centerline
375+75
376+02
376+42
377+08
377+90 Reference Point/Centerline
378+45 Reference Point/Centerline
379+15 Reference Point/Centerline/Roll Grade to Drain
379+99
Construct Rock Cairn as Staked to Right
381+56 Reference Point/Centerline
382+88 Reference Point/Centerline
384+50 Reference Point/Centerline/Roll Grade to Drain
385+34 Reference Point/Centerline
386+07 Install Sign Post as Staked-Right
386+14 End New Trail Construction
Jct. with Lake Ann Trail #592
End of Project
File details come from the government source that posted it. Updated .