Att_1_Prospect_cover.docx

DOCX document 20 KB Posted

Attached to
Continental Divide National Scenic Trail Restoration
Solicitation number
AG-82D7-S-16-0019
Issued by

About this file

Index

View the file

Other files

File Type Posted
Section_B_Base_Plus_Option_Years.docx DOCX document
Map_sheet_4.pdf PDF
Section_B.docx DOCX document
davisbacon_CO13_CO23.pdf PDF
Spec_list.docx DOCX document
ProspectorLog.doc DOC document
Map_sheet_3.pdf PDF
Clauses.docx DOCX document
AG-82D7-S-16-0019.pdf PDF
Drawings_pdf.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: AG-82D7-S-16-0019 Continental Divide Trail

GRAND MESA, UNCOMPAHGRE AND GUNNISON NATIONAL FOREST

GUNNISON RANGER DISTRICT

Total Project Length 7.3 Miles Index to Sheets

Item
Title
Sheet Number
I.
Index to Sheets
1
II.
Section B
2
III.
Vicinity Map
3
IV.
Location Map
4
V.
Summary of Quantities
5
VI.
List of Standard Drawings and Specifications
6
VII.
Specifications

(Other than Forest Service Standard Book EM-7720-100)

A. Section 901 – Abbreviations, Acronyms and Terms
7-8
B. Section 902 – Definitions
8-9
C. Section 903 – Intent of Contract
9
D. Section 904 – Maintenance for Traffic
9-10
E. Section 905 – Control of Materials
10
F. Section 906 – Measurement and Payment
10-12
G. Section 907 – Quality Assurance and Quantity Measurement
12
H. Section 908 – Staking, Flagging, and Cleanup
13
I. Section 911 – Clearing and Grubbing
13-14

J. Section 912 – Excavation and Embankment K. Section 913 – Turnpike 15-16 16-17

L. Seciton 914 -- Switchbacks M. Section 915 – Existing Trail Restoration 17-18 18-20

N. Section 921 – Culverts O. Section 922 – Waterbars 20-21 21-22

P. Section 935 – Rock Retaining Walls Q. Section 951 – Mobilization 22-23 23-24

R. Section 952 – Sign, Post and Cairn Installation
24-25
S. Section 954 – Obliteration of Abandoned Trailways
25-26
T. Section 961 – Rock, Grid Pavement Units and Aggregate
26-27
U. Section 962 – Material for Timber Structures
27-28
V. Section 964 – Geosynthetics
28-30

VIII.

X.

Clauses

Standard Drawings 30-39

39-55

X1.
Description of Work, Prospector Trail
55-75

File details come from the government source that posted it. Updated .