The file's text, extracted by GovTribe without its formatting.
Solicitation: AG-82D7-S-16-0019 Continental Divide Trail
GRAND MESA, UNCOMPAHGRE AND GUNNISON NATIONAL FOREST
GUNNISON RANGER DISTRICT
Total Project Length 7.3 Miles Index to Sheets
| V. |
| Summary of Quantities |
| 5 |
| VI. |
| List of Standard Drawings and Specifications |
| 6 |
(Other than Forest Service Standard Book EM-7720-100)
| A. Section 901 – Abbreviations, Acronyms and Terms |
| 7-8 |
| B. Section 902 – Definitions |
| 8-9 |
| C. Section 903 – Intent of Contract |
| 9 |
| D. Section 904 – Maintenance for Traffic |
| 9-10 |
| E. Section 905 – Control of Materials |
| 10 |
| F. Section 906 – Measurement and Payment |
| 10-12 |
| G. Section 907 – Quality Assurance and Quantity Measurement |
| 12 |
| H. Section 908 – Staking, Flagging, and Cleanup |
| 13 |
| I. Section 911 – Clearing and Grubbing |
| 13-14 |
J. Section 912 – Excavation and Embankment K. Section 913 – Turnpike 15-16 16-17
L. Seciton 914 -- Switchbacks M. Section 915 – Existing Trail Restoration 17-18 18-20
N. Section 921 – Culverts O. Section 922 – Waterbars 20-21 21-22
P. Section 935 – Rock Retaining Walls Q. Section 951 – Mobilization 22-23 23-24
| R. Section 952 – Sign, Post and Cairn Installation |
| 24-25 |
| S. Section 954 – Obliteration of Abandoned Trailways |
| 25-26 |
| T. Section 961 – Rock, Grid Pavement Units and Aggregate |
| 26-27 |
| U. Section 962 – Material for Timber Structures |
| 27-28 |
| V. Section 964 – Geosynthetics |
| 28-30 |
VIII.
X.
Clauses
Standard Drawings 30-39
39-55
| X1. |
| Description of Work, Prospector Trail |
| 55-75 |