Attach_03_Sugar_Creek_Drawings.pdf
PDF 4 MB Posted
- Attached to
- SOLICITATION POSTED Federal contract opportunity
- Solicitation number
- AG-82BH-S-15-0025
About this file
Attach 03 Sugar Creek Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82BH-S-15-0025_Sugar_Creek_Pre-Proposal_Q_ _A's.docx | DOCX document | |
| AG-82BH-S-15-0025_Sol_cont.doc | DOC document | |
| Attach_02_Standard_FS_Trail_Specifications.pdf | ||
| Attach_01_Supp_Specs_Sugar_Creek_Trail_ _Bridge.pdf | ||
| Attach_05__Fire_Control_Plan.docx | DOCX document | |
| AG-82BH-S-15-0025_Sol_SF_1442_pgs_1-3.pdf | ||
| Attach_04_General_Decision_CO12.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST SERVICE - REGION 2
UNITED STATES DEPARTMENT OF AGRICULTURE
ROCKY MOUNTAIN REGION
U S
D A
F
O R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
T I T
L E
S
H E
E T
P I K
N
I
A B
G
O D
D A
R
N
C
T
N A
T I O
N A
L
F
O R
E S
T
R E
G I O
N
NORTH
*PLANSET SCALED TO 11x17
1 9
OF
SHEETS
M O
R R
I S
O N
C
O
COLORADO STATE MAP
NO SCALE
PROJECT LOCATION
U
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
V I C
I N
I T
Y
M
A P
P I K
A B
G
O D
D A
N
N A
T I O
N A
L
F
O R
E S
T
R E
G I O
N
2 9
OF
SHEETS
M O
R R
I S
O N
C
O
VICINITY MAP (NTS)
PROJECT LOCATION
SEDALIA, CO TO PROJECT LOCATION
IS APPROX. 20.3 MILES
INDIAN CREEK WORK CENTER
TO PROJECT LOCATION
IS APPROX. 10.5 MILES
INDIAN CREEK WORK CENTER
GOVERNMENT FURNISHED MATERIAL
STOCKED AT INDIAN CREEK WORK CENTER
* DENOTES CONTRACT QUANTITIES
PER FSSS SECTION 109.02 (b)
ROAD NUMBER:
MILE POST:
ITEM NO. DESCRIPTION
15101 Mobilization
ESTIMATE OF QUANTITIES
S. CO HWY 67
20.3
PAY UNIT
QUANTITIES
Lump Sum ALL
NOTES
Includes equipment, equipment cleaning requirements, fire protection, and all erosion control measures. Conform to FP-03.
91202 Clearing and grubbing
Linear Feet 170
Includes: clearing and grubbing for new constructed trail, removing top 4" of trail's duff and organic material, 10' vertical clearing height, 1' clearing beyond backslope and fill slope catchpoints per section 912.00 Clearing Limits (See Typical -4% Insloped Trail Section Detail
Drawing). Place slash limbs, brush, and rocks to randomly catch sediment movement.
Contractor shall stockpile top 4" duff material to later cap all disturbed areas excluding tread width to enhance future revegetation.
96302
Glulam Stringer Trail Bridge, Length 30'-00" Span
Lump Sum
ALL
Includes assembling and installation of bridge. Also includes the pick-up and delivery of government furnished material to project location (see Vicinity Map). The bridge posts, glulam slabs, rails, rail caps, and 5/8" dia. glulam threaded rods will be government furnished. It's the contractor's responsibility to furnish the continuous mudsills, 3/4" dia.
threaded anchor bolts, hex nuts, iron and plate washers that assembles gabion basket to sill and all other components that's not government furnished. See Gabion Basket Detail sheet, Sill Details sheet and Bridge Assemble & Rail Post Detail sheet. The treated mudsills shall conform to Trail Specifications Section 995.04 - Treated Structural Timber and Lumber. All rough sawn timber surfaces shall be treated with government furnished copper naphthenate wood preservative in accordance with manufacturer's instructions.
20801 Structure excavation *Cubic Yard 26
Includes all bridge structure excavation, foundation preparation, and backfill. Approximately
(9) cubic yards of structural backfill material shall be used for structural backfill. Backfill a minimum of 12" around gabion baskets and 2' feet to bridge approach. Compact with 6" max compacted thick layers per FP-03 Section 208.10. Structural backfill material shall conform to
FP-03 Section 704.04 and foundation fill covered in this pay item (if needed) shall conform to
FP-03 Section 704.01.
62502
Seeding, dry method
Square Yard 93.7
62508
Mulching, dry method
Square Yard
93.7 Mulch all disturbed areas per FP-03 Section 625 Turf Establishment. Mulch shall be weed free
Seed all disturbed areas with approved seed mix per FP-03 Section 625 Turf Establishment.
91812
Gabion Baskets, polyvinylchloride coated
Cubic Feet 298
Includes #9 gage polyvinylchloride wire mesh gabion baskets, 4"-8" durable angular rock, and installation of gabion baskets and all its components. See Gabion Basket Detail Sheet.
Conform to Trail's Specifications
91103 Excavation Lump Sum
ALL
Includes all proposed trail excavation. Approximately (13) cubic yards of trail excavation.
Conform to Trail's Specifications
20411
Embankment construction, compaction method (e), finishing method A
*Cubic Yard
Trail embankment compaction shall conform to FSSS Section 204.11 - Compaction Method (e) and finish method per FSSS Section 204.13 - Sloping, shaping, and Finishing Method (A) by removing all material larger than 6" from the top 6" of the trailbed. Refer to Proposed Trail and Bridge Plan & Profile sheet for trail prism embankment construction notes.
15201
Construction survey and staking, method I, tolerance
B
Lump Sum ALL
This method is to be applied to the survey and staking for all construction including: trail ℄ alignment staking, trail catchpoint staking, ditch, and bridge abutments construction staking.
The government will only provide horizontal and vertical control points and all necessary information relating to coordinates, lines, elevations, slopes, and grades which are found in drawings. Contractor is responsible for completion of each element of the work to government's satisfactory. Conform to FP-03.
U S
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
A S
S H O W N
E S
T I M
A T
E
O
F
Q
U A
N T
I T
I E
S
P I K
A B
G
O D
D A
N
U S F S
N A
T I O
N A
L
F
O R
E S
T
E W H A T L E Y
N A
R E
G I O
N
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
3 9
OF
SHEETS
M O
R R
I S
O N
C
O
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
A S
S H O W
T
E
P
L A
N
P I K
A B
E L
M O
R R
I S
O N
C
O
U S F S
G
O D
D A
N
E W H A T L E Y
N A
R E
G I O
N
SITE PLAN
4 OF 9 SHEETS
N A
T I O
N A
L
F
O R
E S
T
TRAIL HEAD
PARKING
S. CO HWY 67
S. CO HWY 67
5 OF 9 SHEETS
S
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
A S
S H O W N
P R
O P
O S
A
I L
A
B
I D
G
P
K
A B
E L
G
O D
D A
N
U S F S
N A
T I O
N A
L
F
O R
E S
T
E W H A T L E Y
N A
R E
G I O
N
P L A
O
F I L E
EXISTING CENTERLINE TRAIL GRADE PROFILE
FINISH CENTERLINE TRAIL GRADE PROFILE
PROPOSED TRAIL SITE PLAN
PLAN VIEW
TYPICAL -4% INSLOPED TRAIL SECTION (NTS)
M O
R R
I S
O N
C
O
6 OF 9 SHEETS
S
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
A S
S H O W N
G A
B I O
N
B
A S
K E
T
D
E T
A
K
A B
E L
G
O D
D A
N
U S F S
N A
T I O
N A
L
F
O R
E S
T
E W H A T L E Y
N A
R E
G I O
N
GABION BASKET PROFILE DETAIL
SECTION B-B
GABION FOUNDATION
ELEVATION VIEW (NTS)
ANCHOR BOLT DETAIL
ELEVATION (NTS)
ANCHOR BOLT 3/8" A-36 STEEL PLATE WASHER DETAIL (NTS)
M O
R R
I S
O N
C
O
B
B
STANDARD GABION BASKET SIZE
7 OF 9 SHEETS
S
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
A S
S H O W N
S I L L
D
E T
A I L S
P I K
A B
E L
G
O D
D A
N
U S F S
N A
T I O
N A
L
F
O R
E S
T
E W H A T L E Y
N A
R E
G I O
N
ELEVATION VIEW (NTS)
M O
R R
I S
O N
C
O
TYPICAL SECTION
PLAN VIEW (NTS)
8 OF 9 SHEETS
S
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
A S
S H O W N
B R
I D
G
S
E M
B
K
A B
E L
M O
R R
I S
O N
C
O
U S F S
G
O D
D A
N
E W H A T L E Y
N A
R E
G I O
N
N A
T I O
N A
L
F
O R
E S
T
P O
T
A I
9 OF 9 SHEETS
S
R
E S
T
S
E R
V I C
E
R o c k y
M o u n t a i n
R e g i o n
PROJECT NO.
SHEET
D E S C R I P T I O N
S C A L E
C H E C K E D
B Y
D R A W N
B Y
P r o j e c t
S h e e t
T i t l e
SU
GA
R
CR
EE
K
AT
V
TR
AI
L
AN
D
BR
ID
GE
P
RO
JE
CT
A S
S H O W N
E R
O S
I O
N
C
O N
T R
O L
P I K
E
A
A B
E L
G
O D
D A
N
U S F S
N A
T I O
N A
L
F
O R
E S
T
E W H A T L E Y
N A
R E
G I O
N
M o r r i s o n
C o l o r a d o
ENRICHMENT DETAIL TYP WATTLE INSTALLATION GUIDE
TYP WATTLE SPACING BASED ON SLOPE GRADIENT
CROSS SECTION
SILT FENCE DETAIL D (NTS)
EROSION CONTROL PLAN
PLAN VIEW
ELEVATION DETAIL
STRAW WATTLE INSTALLATION DETAIL C (NTS)
WATTLE INSTALLATION
SILT FENCE DETAIL
APPROX. LOCATION (TYP)
C 9 D
File details come from the government source that posted it. Updated .