Fill_In_Schedule_of_Items_AG-82BH-S-15-0023.docx

DOCX document 59 KB Posted

Attached to
Pike & San Isabel National Forests Roads Construction IDIQ
Solicitation number
AG-82BH-S-15-0023
Issued by

About this file

Fill In Schedule of Items

View the file

Other files

File Type Posted
AG-82BH-S-15-0023_SF_30_Amend_000002.pdf PDF
AG-82BH-S-15-0023_Amend_00001_Sum_of_Changes_rev_1.docx DOCX document
Attach_J7_General_Decision_CO23_amend.docx DOCX document
AG-82BH-S-15-0023_Sol_pgs_3-30_amend_02.docx DOCX document
Attach_J3_General_Decision_CO22_amend.docx DOCX document
Amended_Fill_In_Sched_of_Items_AG-82BH-S-15-0023.docx DOCX document
Attach_J6_General_Decision_CO19_amend.docx DOCX document
AG-82BH-S-15-0023_Amend_00001_Sum_of_Changes.docx DOCX document
Attach_J5_General_Decision_CO18_amend.docx DOCX document
Attach_J4_General_Decision_CO16_amend.docx DOCX document
Attach_J9_General_Decision_KS19_amend.docx DOCX document
Attach_J8_General_Decision_CO20_amend.docx DOCX document
AG-82BH-S-15-0023_SF_30_Amend_000001.pdf PDF
AG-82BH-S-15-0023_Sol_pgs_3-30_amend_01.docx DOCX document
Attach_J7_General_Decision_CO23.pdf PDF
AG-82BH-S-15-0023_SF1442_pgs_1-2.pdf PDF
AG-82BH-S-15-0023_Sol_pgs_3-30.docx DOCX document
Attach_J1_Rds_IDIQ_Standard_Specs.pdf PDF
Attach_J6_General_Decision_CO19.pdf PDF
Attach_J9_General_Decision_KS19.pdf PDF
Attach_J8_General_Decision_CO20.pdf PDF
Attach_J5_General_Decision_CO18.pdf PDF
Attach_J2_Rds_IDIQ_Maps_ _Dwgs.pdf PDF
Attach_J4_General_Decision_CO16.pdf PDF
Attach_J3_General_Decision_CO22.pdf PDF
Attach_J10__Fire_Control_Plan.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-82BH-S-15-0023

Pike & San Isabel NF’s Roads Construction IDIQ Page 4 of 30

SECTION B – SCHEDULE OF ITEMS

PIKE & SAN ISABEL NATIONAL FORESTS

The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be included in a task order. See General Notes – Mobilization Pay Items

Item No.
Description
Estimated Quantity
Method of Meas.
Unit
Base Year Unit Price
Opt. Year One (1)

Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price

151(01)M
Mobilization of motor grader, Cat 140, JD770D, or equivalent from base of operations (one time per job)
500
AQ
Mile
151(02)M
Mobilization of backhoe/loader, Cat 416E , JD 310G, or equiv., 4-wheel drive, with extendable stick from base of operations (one time per job)
500
AQ
Mile
151(03)M
Mobilization of dozer, Cat D-4, Case 550, or equiv., w/tilt blade from base of operations (one time per job)
500
AQ
Mile
151(04)M
Mobilization of dozer, Cat D-6, Case 850, or equiv., w/tilt blade from base of operations (one time per job)
500
AQ
Mile
151(05)M
Mobilization of track-mounted excavator, Cat 315, Case 9030, or equiv., w/ thumb attachment from base of operation (one time per job)
500
AQ
Mile
151(06)M
Mobilization of skid steer, Bobcat S220 or equivalent from base of operations. (one time per job)
500
AQ
Mile
151(07)M
Mobilization of wheel loader, John Deere 544, Cat 950, or equiv. from base of operations. (one time per job)
500
AQ
Mile
151(08)M
Mobilization of Dump Truck, 10 C.Y. from Base (one time per job)
500
AQ
Mile
151(10)M
Mobilization of compactor, vibratory steel wheel, 5-8 ton from base of operations (one time per job)
500
AQ
Mile
151(11)M
Mobilization of water tender, 4,000 gallon pressurized; w/ operator. 8 hour minimum per job
500
AQ
Mile
151(12)M
Mobilization of mini-excavator, Cat 303 5C or equiv. w/ thumb attachment from base. (one time per job)
500
AQ
Mile
151(13)M
Mobilization of Road Reconditioning – In Place Rock Crushing Crew from base of operations. (one time per job)
Per Task Order if applicable
AQ
Mile
151(20)
Bonding, Task Order $30,000 to $150,000. No Individual Task Order will exceed $150,000
Per Task Order if applicable
%
Each
152(01)
Construction Survey and Staking
Per Task Order if applicable
AQ
LS
157(02)
Soil Erosion Control
1000
AQ
Foot
202(55)
Removal & disposal of trees – dia. Less than 24”, disposal method “e”
20
AQ
Each
Item No.
Description
Estimated Quantity
Method of Meas.
Unit
Base Year Unit Price
Opt. Year One (1)

Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price

202(55)A
Removal & disposal of trees – dia. 24” or greater, disposal method “e”
20
AQ
Each
203(01)A
Removal of Existing Culverts, 12”-24”, disposal method “a”
60
AQ
Each
203(01)B
Removal of Existing Culverts, above 24”, disposal method “a”
60
AQ
Each
204(01)
Roadway Excavation, compaction method “d” – wheel roller compaction, finishing method “A”
1500
CY
LS
204(02)
Load and Haul Material
5000
CY/Mile
LS
204(20)A
Drainage Excavation, Type Drainage Dip
25
AQ
Each
204(20)B
Drainage Excavation, Type Inlet/Outlet Ditch
25
AQ
Each
204(24)
Haul
10000
AQ
Ton-Mile
204(25)
Haul, Gov’t Furnished Gate Mat’l
500
AQ
Mile
211(03)A
Roadway Obliteration, Method 1
Per Task Order if applicable
AQ
Mile
211(03)B
Roadway Obliteration, Method 2
5
AQ
Mile
211(03)C
Roadway Obliteration, Method 3
15
AQ
Mile
230(01)
Roadside Brushing
20
AQ
Mile
251(02)
Placed Rip Rap, Class 2 (D50 = 6”)
100
AQ
Ton
251(03)
Placed Rip Rap, Class 3 (D50 = 10”)
100
AQ
Ton
251(04)
Placed Rip Rap, Class 6 (D50 = 22”)
100
AQ
Ton
258(01)
Reinforced Concrete Retaining Wall
Per Task Order if applicable
AQ
SF Face
301(01)A
Aggregate base, Government Furnished Material, compaction method “B” – wheel roller compaction
750
AQ
Ton
301(01)B
Aggregate base, grading CDOT Class 6, compaction method “B” – wheel roller compaction
1500
AQ
Ton
301(01)C
Aggregate base, grading CDOT Class 6, compaction method “A” – FP-14 compaction
1500
AQ
Ton
Item No.
Description
Estimated Quantity
Method of Meas.
Unit
Base Year Unit Price
Opt. Year One (1)

Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price

301(01)D
Aggregate base, grading CDOT Class 5, compaction method “B” – wheel roller compaction
1500
AQ
Ton
301(01)E
Aggregate base, grading CDOT Class 5, compaction method “A” – FP-14 compaction
1500
AQ
Ton
301(15)
Aggregate surface course, Type Pit Run, compaction method “B” – wheel roller compaction
1000
AQ
Ton
303(58)
Road Reconditioning – In Place Rock Crushing
Per Task Order if applicable
AQ
SY
602(01)A
Installation of 18-inch diameter corrugated metal pipe, compaction method “A”
420
AQ
LF
602(01)B
Installation of 24-inch diameter corrugated metal pipe, compaction method “A”
420
AQ
LF
602(01)C
Installation of 36-inch diameter corrugated metal pipe, compaction method “A”
300
AQ
LF
602(01)D
Installation of 48-inch diameter corrugated metal pipe, compaction method “A”
300
AQ
LF
602(01)E
Installation of 60-inch diameter corrugated metal pipe, compaction method “A”
200
AQ
LF
602(01)F
Installation of 72-inch diameter corrugated metal pipe, compaction method “A”
200
AQ
LF
602(02)A
Installation of 21” span, 15” rise corrugated metal pipe, compaction method “A”
420
AQ
LF
602(02)B
Installation of 28” span, 20” rise corrugated metal pipe, compaction method “A”
420
AQ
LF
602(06)B
End section for 24” pipe culvert
10
AQ
Each
602(07)A
End section for 21” span, 15” rise pipe arch culvert
10
AQ
Each
602(07)B
End section for 28” span, 20” rise pipe arch culvert
10
AQ
Each
605(08)
Granular Backfill, AASHTO #57, washed
100
AQ
Ton
619(02)
Transport and Install Government Furnished 12’ Heavy Duty Gate
5
AQ
Each
622(01)
Motor Grader, Cat 140, JD770D, or equivalent; with operator
225
AQ
Hour
622(02)
Backhoe/Loader, Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick; with operator
225
AQ
Hour
622(03)
Crawler Dozer, Cat D-4, Case 550, or equivalent, w/ tilt blade; with operator
225
AQ
Hour
622(04)
Crawler Dozer, Cat D-6, Case 550, or equivalent, w/ tilt blade; with operator
225
AQ
Hour
Item No.
Description
Estimated Quantity
Method of Meas.
Unit
Base Year Unit Price
Opt. Year One (1)

Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price

622(05)
Track Mounted Excavator, Cat 315, Case 9030, or equiv., w/ thumb attachment; with operator
225
AQ
Hour
622(06)
Track Mounted Excavator, Cat 315, Case 9030, or equiv., w/ rock hammer attachment; with operator
225
AQ
Hour
622(07)
Wheel Loader, John Deere 544, Cat 950, or equivalent, with operator
225
AQ
Hour
622(08)
Mini-excavator, Cat 303 5C or equiv. w/ thumb attachment; with operator
225
AQ
Hour
622(09)
Skid steer, Bobcat S220 or equivalent; with operator
225
AQ
Hour
622(10)
Compactor, vibratory steel wheel, 5-8 ton
225
AQ
Hour
622(11)
Dump Truck, 10 C.Y. with operator
225
AQ
Hour
623(01)
General Labor
300
AQ
Hour
623(02)
Mobile Welder w/operator
40
AQ
Hour
625(01)
Seeding, Dry Method
5
Acre
LS
633(10)
Remove Sign (includes disposal of sign off Government property)
10
AQ
Each
633(90)A
Install Single Post Sign (4"x4" post) - Government Furnished Sign
10
AQ
Each
633(90)B
Install Double Post Sign (4"x4" posts) - Government Furnished Sign
10
AQ
Each
633(90)C
Install Carsonite Sign, Government Furnished Sign
10
AQ
Each
802(01)
Ditch Cleaning
15840
AQ
LF
805(01)
Culvert Cleaning, under 24"
600
AQ
LF
805(02)
Culvert Cleaning, 24" to 35"
600
AQ
LF
805(03)
Culvert Cleaning, 36" and larger
450
AQ
LF
805(04)
Drainage Dip Cleaning
50
AQ
Each
808(01)
Cattleguard Cleaning
15
AQ
Each
809(01)
Water Supply
Per Task Order if applicable
AQ
LS
850(01)A
Road Maintenance - Level 2 Roads
60
AQ
Mile
850(01)B
Travelway Maintenance - Level 2 Roads
60
AQ
Mile
860(01)A
Road Maintenance - Level 3-5 Roads
60
AQ
Mile
860(01)B
Travelway Maintenance - Level 3-5 Roads
60
AQ
Mile

File details come from the government source that posted it. Updated .