AG-82BH-S-15-0023
Pike & San Isabel NF’s Roads Construction IDIQ Page 4 of 30
SECTION B – SCHEDULE OF ITEMS
PIKE & SAN ISABEL NATIONAL FORESTS
The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be included in a task order. See General Notes – Mobilization Pay Items
| Item No. |
| Description |
| Estimated Quantity |
| Method of Meas. |
| Unit |
| Base Year Unit Price |
| Opt. Year One (1) |
Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price
| 151(01)M |
| Mobilization of motor grader, Cat 140, JD770D, or equivalent from base of operations (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(02)M |
| Mobilization of backhoe/loader, Cat 416E , JD 310G, or equiv., 4-wheel drive, with extendable stick from base of operations (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(03)M |
| Mobilization of dozer, Cat D-4, Case 550, or equiv., w/tilt blade from base of operations (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(04)M |
| Mobilization of dozer, Cat D-6, Case 850, or equiv., w/tilt blade from base of operations (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(05)M |
| Mobilization of track-mounted excavator, Cat 315, Case 9030, or equiv., w/ thumb attachment from base of operation (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(06)M |
| Mobilization of skid steer, Bobcat S220 or equivalent from base of operations. (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(07)M |
| Mobilization of wheel loader, John Deere 544, Cat 950, or equiv. from base of operations. (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(08)M |
| Mobilization of Dump Truck, 10 C.Y. from Base (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(10)M |
| Mobilization of compactor, vibratory steel wheel, 5-8 ton from base of operations (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(11)M |
| Mobilization of water tender, 4,000 gallon pressurized; w/ operator. 8 hour minimum per job |
| 500 |
| AQ |
| Mile |
| 151(12)M |
| Mobilization of mini-excavator, Cat 303 5C or equiv. w/ thumb attachment from base. (one time per job) |
| 500 |
| AQ |
| Mile |
| 151(13)M |
| Mobilization of Road Reconditioning – In Place Rock Crushing Crew from base of operations. (one time per job) |
| Per Task Order if applicable |
| AQ |
| Mile |
| 151(20) |
| Bonding, Task Order $30,000 to $150,000. No Individual Task Order will exceed $150,000 |
| Per Task Order if applicable |
| % |
| Each |
| 152(01) |
| Construction Survey and Staking |
| Per Task Order if applicable |
| AQ |
| LS |
| 157(02) |
| Soil Erosion Control |
| 1000 |
| AQ |
| Foot |
| 202(55) |
| Removal & disposal of trees – dia. Less than 24”, disposal method “e” |
| 20 |
| AQ |
| Each |
| Item No. |
| Description |
| Estimated Quantity |
| Method of Meas. |
| Unit |
| Base Year Unit Price |
| Opt. Year One (1) |
Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price
| 202(55)A |
| Removal & disposal of trees – dia. 24” or greater, disposal method “e” |
| 20 |
| AQ |
| Each |
| 203(01)A |
| Removal of Existing Culverts, 12”-24”, disposal method “a” |
| 60 |
| AQ |
| Each |
| 203(01)B |
| Removal of Existing Culverts, above 24”, disposal method “a” |
| 60 |
| AQ |
| Each |
| 204(01) |
| Roadway Excavation, compaction method “d” – wheel roller compaction, finishing method “A” |
| 1500 |
| CY |
| LS |
| 204(02) |
| Load and Haul Material |
| 5000 |
| CY/Mile |
| LS |
| 204(20)A |
| Drainage Excavation, Type Drainage Dip |
| 25 |
| AQ |
| Each |
| 204(20)B |
| Drainage Excavation, Type Inlet/Outlet Ditch |
| 25 |
| AQ |
| Each |
| 204(24) |
| Haul |
| 10000 |
| AQ |
| Ton-Mile |
| 204(25) |
| Haul, Gov’t Furnished Gate Mat’l |
| 500 |
| AQ |
| Mile |
| 211(03)A |
| Roadway Obliteration, Method 1 |
| Per Task Order if applicable |
| AQ |
| Mile |
| 211(03)B |
| Roadway Obliteration, Method 2 |
| 5 |
| AQ |
| Mile |
| 211(03)C |
| Roadway Obliteration, Method 3 |
| 15 |
| AQ |
| Mile |
| 230(01) |
| Roadside Brushing |
| 20 |
| AQ |
| Mile |
| 251(02) |
| Placed Rip Rap, Class 2 (D50 = 6”) |
| 100 |
| AQ |
| Ton |
| 251(03) |
| Placed Rip Rap, Class 3 (D50 = 10”) |
| 100 |
| AQ |
| Ton |
| 251(04) |
| Placed Rip Rap, Class 6 (D50 = 22”) |
| 100 |
| AQ |
| Ton |
| 258(01) |
| Reinforced Concrete Retaining Wall |
| Per Task Order if applicable |
| AQ |
| SF Face |
| 301(01)A |
| Aggregate base, Government Furnished Material, compaction method “B” – wheel roller compaction |
| 301(01)B |
| Aggregate base, grading CDOT Class 6, compaction method “B” – wheel roller compaction |
| 1500 |
| AQ |
| Ton |
| 301(01)C |
| Aggregate base, grading CDOT Class 6, compaction method “A” – FP-14 compaction |
| Item No. |
| Description |
| Estimated Quantity |
| Method of Meas. |
| Unit |
| Base Year Unit Price |
| Opt. Year One (1) |
Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price
| 301(01)D |
| Aggregate base, grading CDOT Class 5, compaction method “B” – wheel roller compaction |
| 1500 |
| AQ |
| Ton |
| 301(01)E |
| Aggregate base, grading CDOT Class 5, compaction method “A” – FP-14 compaction |
| 1500 |
| AQ |
| Ton |
| 301(15) |
| Aggregate surface course, Type Pit Run, compaction method “B” – wheel roller compaction |
| 1000 |
| AQ |
| Ton |
| 303(58) |
| Road Reconditioning – In Place Rock Crushing |
| Per Task Order if applicable |
| AQ |
| SY |
| 602(01)A |
| Installation of 18-inch diameter corrugated metal pipe, compaction method “A” |
| 420 |
| AQ |
| LF |
| 602(01)B |
| Installation of 24-inch diameter corrugated metal pipe, compaction method “A” |
| 420 |
| AQ |
| LF |
| 602(01)C |
| Installation of 36-inch diameter corrugated metal pipe, compaction method “A” |
| 300 |
| AQ |
| LF |
| 602(01)D |
| Installation of 48-inch diameter corrugated metal pipe, compaction method “A” |
| 300 |
| AQ |
| LF |
| 602(01)E |
| Installation of 60-inch diameter corrugated metal pipe, compaction method “A” |
| 200 |
| AQ |
| LF |
| 602(01)F |
| Installation of 72-inch diameter corrugated metal pipe, compaction method “A” |
| 200 |
| AQ |
| LF |
| 602(02)A |
| Installation of 21” span, 15” rise corrugated metal pipe, compaction method “A” |
| 420 |
| AQ |
| LF |
| 602(02)B |
| Installation of 28” span, 20” rise corrugated metal pipe, compaction method “A” |
| 420 |
| AQ |
| LF |
| 602(06)B |
| End section for 24” pipe culvert |
| 10 |
| AQ |
| Each |
| 602(07)A |
| End section for 21” span, 15” rise pipe arch culvert |
| 10 |
| AQ |
| Each |
| 602(07)B |
| End section for 28” span, 20” rise pipe arch culvert |
| 10 |
| AQ |
| Each |
| 605(08) |
| Granular Backfill, AASHTO #57, washed |
| 100 |
| AQ |
| Ton |
| 619(02) |
| Transport and Install Government Furnished 12’ Heavy Duty Gate |
| 5 |
| AQ |
| Each |
| 622(01) |
| Motor Grader, Cat 140, JD770D, or equivalent; with operator |
| 225 |
| AQ |
| Hour |
| 622(02) |
| Backhoe/Loader, Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick; with operator |
| 225 |
| AQ |
| Hour |
| 622(03) |
| Crawler Dozer, Cat D-4, Case 550, or equivalent, w/ tilt blade; with operator |
| 225 |
| AQ |
| Hour |
| 622(04) |
| Crawler Dozer, Cat D-6, Case 550, or equivalent, w/ tilt blade; with operator |
| 225 |
| AQ |
| Hour |
| Item No. |
| Description |
| Estimated Quantity |
| Method of Meas. |
| Unit |
| Base Year Unit Price |
| Opt. Year One (1) |
Unit Price Opt. Year Two (2) Unit Price Opt. Year Three (3) Unit Price Opt. Year Four (4) Unit Price Base Year Total Price
| 622(05) |
| Track Mounted Excavator, Cat 315, Case 9030, or equiv., w/ thumb attachment; with operator |
| 225 |
| AQ |
| Hour |
| 622(06) |
| Track Mounted Excavator, Cat 315, Case 9030, or equiv., w/ rock hammer attachment; with operator |
| 225 |
| AQ |
| Hour |
| 622(07) |
| Wheel Loader, John Deere 544, Cat 950, or equivalent, with operator |
| 225 |
| AQ |
| Hour |
| 622(08) |
| Mini-excavator, Cat 303 5C or equiv. w/ thumb attachment; with operator |
| 225 |
| AQ |
| Hour |
| 622(09) |
| Skid steer, Bobcat S220 or equivalent; with operator |
| 225 |
| AQ |
| Hour |
| 622(10) |
| Compactor, vibratory steel wheel, 5-8 ton |
| 225 |
| AQ |
| Hour |
| 622(11) |
| Dump Truck, 10 C.Y. with operator |
| 225 |
| AQ |
| Hour |
| 623(01) |
| General Labor |
| 300 |
| AQ |
| Hour |
| 623(02) |
| Mobile Welder w/operator |
| 40 |
| AQ |
| Hour |
| 625(01) |
| Seeding, Dry Method |
| 5 |
| Acre |
| LS |
| 633(10) |
| Remove Sign (includes disposal of sign off Government property) |
| 10 |
| AQ |
| Each |
| 633(90)A |
| Install Single Post Sign (4"x4" post) - Government Furnished Sign |
| 10 |
| AQ |
| Each |
| 633(90)B |
| Install Double Post Sign (4"x4" posts) - Government Furnished Sign |
| 10 |
| AQ |
| Each |
| 633(90)C |
| Install Carsonite Sign, Government Furnished Sign |
| 10 |
| AQ |
| Each |
| 802(01) |
| Ditch Cleaning |
| 15840 |
| AQ |
| LF |
| 805(01) |
| Culvert Cleaning, under 24" |
| 600 |
| AQ |
| LF |
| 805(02) |
| Culvert Cleaning, 24" to 35" |
| 600 |
| AQ |
| LF |
| 805(03) |
| Culvert Cleaning, 36" and larger |
| 450 |
| AQ |
| LF |
| 805(04) |
| Drainage Dip Cleaning |
| 50 |
| AQ |
| Each |
| 808(01) |
| Cattleguard Cleaning |
| 15 |
| AQ |
| Each |
| 809(01) |
| Water Supply |
| Per Task Order if applicable |
| AQ |
| LS |
| 850(01)A |
| Road Maintenance - Level 2 Roads |
| 60 |
| AQ |
| Mile |
| 850(01)B |
| Travelway Maintenance - Level 2 Roads |
| 60 |
| AQ |
| Mile |
| 860(01)A |
| Road Maintenance - Level 3-5 Roads |
| 60 |
| AQ |
| Mile |
| 860(01)B |
| Travelway Maintenance - Level 3-5 Roads |
| 60 |
| AQ |
| Mile |