A-001 - Part 2. S-10-0428 pdf.pdf

PDF 1 MB Posted

Attached to
RECOVERY - CARIBOU-CALLIHAN ROAD DECOMMISSIONING
Solicitation number
AG-82B1-S-10-0428
Issued by

About this file

Replacement Part 2 Amendment A-001

View the file

Other files

File Type Posted
S-10-0428 Standard Specifications.docx DOCX document
A-004 S-10-0428.pdf PDF
A-003 S-10-0428.pdf PDF
FP-03 A-003 S-10-0428.doc DOC document
A-002 S-10-0428.pdf PDF
Attachment to Amendment A -002 S-10-0428.docx DOCX document
A-001 S-10-0428.pdf PDF
A-001 S-10-0428 Attachment.docx DOCX document
S-10-0428_Section_B_-_M_.doc DOC document
Plans - Part 4.pdf PDF
MT SERVICE CONTRACT WAGES.htm HTM file
Plans - Part 2.pdf PDF
sf-1447.pdf PDF
Plans - Part 3.pdf PDF
Plans - Part 1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T30N R34W

T58N R03E

T59N R03E

45074547

14324 404C

4412A

14316

A

1A 4411

4530B

4B

427A

4541A

4530A

14371

14317

14318B

4506A

4509A

4541B

4275 9990

4545B

4511A

4542A

4509B

14316A

14295A

A

4556E

582Z

4545A

9989A

Callahan Cr S

Glad Cr

Callahan Cr N

Goat Cr

Smith Cr

Jil l C r

Los t C r

Ca rib ou C r

Willard Cr

Camp Cr

Benning Cr

Frezkat Cr

Keeler Cr WF

Ca lla ha n C r S F T rib

Keeler C r N

F

Burnt Pk

Long Mtn

Lafoe Mtn

Smith Mtn

Survey Mtn

Smith Patrol

8 1

9 2

33 34

28 27

17 15 1216

242728

17 16 15 1211

Callahan Project Area

Legend Project Roads Other Roads MT/ID Border Streams sja - 2/22/10

End Road 4521 Work

STA 195+00

Begin Road 4521 Work

STA 0+00

Rock Source

STA 71+36

Lowboy Turnaround

Begin Road 4541 Work

STA 0+00

Begin Road 4541B Work

End Road 4541B Work

STA 32+50

End Road 4541 Work

STA 232+20

0 1 20.5 Miles

Rock Source

STA 132+60

ID

AH

O

ID

AH

O

M O

N

TA

N A

M O

N

TA

N A

Pay Item No.

Item Description Measure-ment Method

Measure-ment Unit

Road

Road

Road

Road 5819 TOTAL Road

Road

Road

4541B TOTAL

15101 Mobilization LSQ LS All All 21159 Roadway Clearing CQ MI 4.66 0.57 5.23 0 21160 Roadway Clearing CQ LF 4,480 17,600 4,435 26,515 19,500 23,220 3,250 45,970

21161 Stream Channel Excavation - Category I

AQ EA 1 4 5 2 2

21162 Stream Channel Excavation - Category II

AQ EA 1 2 2 5 1 1 1 3

21163 Stream Channel Excavation - Category III

AQ EA 0 2 3 5

21164 Stream Channel Excavation - Category IV

AQ EA 0 1 1 2

21166 Partial Road Recontour, 3:1 Outslope

AQ LF 550 240 150 940 525 2,140 2,665

21168 Road Scarification AQ LF 4,400 1,635 6,035 10,615 21,080 3,250 34,945

21169 Ditch Relief Culvert Removal AQ EA 3 15 18 6 4 10

21170 Cross Channel AQ EA 14 1 15 1 3 1 5 21171 Ditch Drainage Waterbar AQ EA 12 30 5 47 15 33 6 54 21172 Surface Waterbar AQ EA 36 36 16 18 1 35 21174 Double Earth Barrier AQ EA 1 1 1 3 1 1 2 21175 Grade Control Structure AQ EA 21 3 24 12 14 3 29

25170 6" Rock, Produce and Deliver

CQ CY 0 6 2 8

25170 12" Rock, Produce and Deliver

CQ CY 0 13 16 12 41

25170 18" Rock, Produce and Deliver

CQ CY 0 35 10 45

25170 30" Rock, Commercial Source and Delivery CQ CY 0 20 20

62201 Hydraulic Excavator with Thumb AQ HR 8 33 8 8 57 24 53 15 92

Bid Item 1: Caribou Road Decom. Bid Item 2: Callahan Road Decom.

SUMMARY OF QUANTITIES

Mobilization: For Bid Item 2: Callahan Creek Road Decommissioning, the closest available lowboy turnaround is at the junction of NFS Roads 414, 4530 and 4541 (see project maps).

Equipment will need to be “tracked” from this junction approximately 2 miles up Road 4530 to begin work on Road 4521 and approximately 0.6 miles on Road 4541 to the beginning of the work.

Construction Staking: Stations for most work items have been flagged on the ground, however some flags may be missing. The Contracting Officer will flag the stations shown on the work logs before work occurs.

Access: To provide vehicle access along the project roads the Contractor may need to remove earth berms, rocks, slide material and other debris, slope back vertical banks and construct temporary road through slump areas. Proposals for temporary stream fords shall be submitted to and approved by the Contracting Officer before construction. This work is incidental to Pay Items 21159, 21160.

Stream Crossing Excavation (Pay Items 21161, 21162, 21163, 21164): Stream category (I, II, III or IV) was determined by measurement of the vertical distance from the road surface to the final stream grade elevation. Excavate the road fill down to the original stream channel which may be below and/or off to the side of the existing culvert location. Provide for the channel width which is shown on the Stream Channel List. The Contractor is required to determine where to start the excavation at each stream channel crossing so that the final result is in compliance with the contract.

See Stream Channel List (Construction Notes) for requirments regarding placement of waste material. Some stream sites have conditions such as springs that preclude wasting material immediately adjacent to the stream crossing.

Stream Crossings with Special Erosion Control Required: See Stream Channel List for sites designated as requiring Special Erosion Control. These sites have legal requirements to protect water quality. Culvert removal will not begin until authorized by the Contracting Officer.

In order to minimize sedimentation all possible excavation needs to be completed prior to culvert removal. Slopes will be excavated to finished grades to accommodate the specified channel width except for the minimum amount of material necessary to keep water flowing through culvert and to allow machine access over the culvert. All material on top and sides of lowest section of culvert will be removed. An adequately sized disposal area for remaining material will be available within reach of machine. Rocks of adequate size and number for grade control structures will be staged at inlet and outlet areas prior to culvert removal. The Government will determine the need to install Government Furnished sediment control materials and may require Contractor’s assistance using Rental Equipment 62201.

Rock: Except for rock delivered under Pay Item 25170, obtaining, stockpiling and placing rock for all other work is incidental to other pay items. Rock may be sorted from road fill material excavated during the prosecution of the work or excavated and hauled from any rock sources found along the road. Sites developed for rock borrow will be left in a stable condition. Rock may need to be moved up to ¼ mile from sources to installation sites. Notify Contracting Officer if specified rock size is unavailable within ¼ mile of any site. Slash will be allowed as a substitute for rock only where specified in the work log. Rock size is specified by the minimum sieve size the rock would pass through.

GENERAL NOTES

Delivery of Rock (Pay Item 25170): This rock will be used to augment rock obtained on or near work sites for armoring drainage structures and installing grade control. Placement will be incidental to other pay items. Local rock sources for up to 18” diameter rock have been identified on NFS Roads 4521 and 4541 (see Callahan Project Area Map). Rock is located on or near the ground surface at both local sources. Larger 30” diameter rock will be obtained commercially. Note there are limited locations on the project roads for truck turnarounds. New turnaround locations will be approved in advance by the Contracting Officer.

GENERAL NOTES

PAY

ITEM STA

CMP

DIAM

(IN)

CMP

LENGTH

(FT)

INLET

ROAD

FILL

DEPTH

(FT)

OUTLET

ROAD

FILL

DEPTH

(FT)

ROAD

WIDTH

(FT)

CHAN-

NEL

WIDTH

(FT)

SPECIAL

EROSION

CONTROL

REQUIRED?

CONSTRUCTION NOTES

21161 32+80 18 34 4 7 16 6 Yes In order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.

21162 47+80 Buried Logs 45 5 17 16 8 Yes

Salvage logs to scatter as woody debris on recontoured slopes.

Narrow road width limits space for placing excavated fill material adjacent to channel. Excavated material may need to be placed up to 100 feet from channel.

21161 51+10 Buried Logs 36 3 10 16 3 No

In order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.

21161 116+70 Buried Logs 45 4 8 16 3 Yes

In order to maintain ditch connection to stream channel, do not place excavated material against cutslope back of station. Waste excavated material ahead of station. Maintain wetland area above inlet.

21162 122+70 36 34 12 13 16 12 Yes Place 75% of excavated material in back of station in landing area.

Place remainder of excavated material on road surface only ahead of station in order to maintain ditch connection to stream channel.

21161 123+95 30 30 4 6 16 6 Yes In order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.

21162 42+17 36 33 6 12 16 5 Yes Place 75% of excavated material in back of station in landing area.

Place remainder of excavated material on road surface only ahead of station in order to maintain ditch connection to stream channel.

21162 43+17 None 34 (est new ch length)

4 12 16 3 Yes In order to maintain ditch connection to stream channel, do not place excavated material back cutslope ahead of station. Waste excavated material ahead of station.

BID ITEM 1: CARIBOU ROAD DECOMMISSIONING

ROAD 5807

ROAD 5811

STREAM CHANNEL LIST

21161 45+60 24 24 3 4 16 5 Yes

21162 50+50 NA NA 10 12 16

(incl.

10' flood-plain)

Yes

Old bridge site on Caribou Ck. Deck has been removed. Remove west abutment and fill material to reestablish floodplain and channel width as flagged. Waste material beginning 75' back of station on landing area. East abutment is gone. Backslope both sides at 2:1.

ROAD 5800

Note: Special Erosion Control sites may have running water and require measures to reduce sedimentation. Pay Item 62201 will be used at these sites to remove culverts and perform finish work on stream channels including installation of grade control structures. See Supplemental Specification 211 and General Notes.

BID ITEM 1: CARIBOU ROAD DECOMMISSIONING

CMP

DIAM

(IN)

CMP

LENGTH

(FT)

INLET

ROAD

FILL

DEPTH

(FT)

OUTLET

ROAD

FILL

DEPTH

(FT)

ROAD

WIDTH

(FT)

CHAN-

NEL

WIDTH

(FT)

SPECIAL

EROSION

CONTROL

REQUIRED?

CONSTRUCTION NOTES

21163 128+50 18 44 9 22 16 4 Yes Pipe outlet is perched approximately 3' above natural grade.

Excavate to natural channel grade. Maximum finished channel length will be approximately 50'.

21163 136+70 24 42 10 23 18 5 Yes

Two channels enter inlet basin. Pipe is offset to draw and perched approximately 9' above natural channel grade.

Excavate to center of natural draw and down to flagged grade.

Finished channel length will be approximately 52'.

21162 153+00 24 & 18 40 ea. 9 ea. 18 ea. 20 10 Yes

Two culverts in this draw spaced approximately 12' apart.

Waste all material 50' back or 75' ahead of station in order to maintain drainage for springs in vicinity of stream. Maintain open ditch flow from spring sources to channel. Road is 40' - 50' wide in waste area 75' ahead of station.

21161 108+90 18 30 2 7 24 3 No

21161 114+80 18 32 3.5 6 18 4 No In order to maintain ditch connection to stream channel, do not place excavated material against cutslope ahead of station. Waste excavated material back of station.

21162 118+90 4'x6' squash 40 8.5 14 14 27 Yes Lost Fork Creek. Sedimat installation required, Material furnished by Government. Installation paid under Item 62201.

21163 141+05 18 50 2 23 27 4 Yes

21163 162+19 36 66 13 32 20 9

21164 176+60 18 72 8 45 21 8 Yes Culvert is offset to natural draw and outlet is perched approximately 10' above desired grade. Excavate to center of draw. Finished channel length will be approximately 90'.

BID ITEM 2: CALLAHAN ROAD DECOMMISSIONING

ROAD 4521

ROAD 4541

CMP

DIAM

(IN)

CMP

LENGTH

(FT)

INLET

ROAD

FILL

DEPTH

(FT)

OUTLET

ROAD

FILL

DEPTH

(FT)

ROAD

WIDTH

(FT)

CHAN-

NEL

WIDTH

(FT)

SPECIAL

EROSION

CONTROL

REQUIRED?

COMMENTS

21163 199+80 48 60 17 26 20 29 Yes

Camp Creek. Channel width includes terraced 4' of flood plain allowance on each side of the channel. Sedimat installation required. Material furnished by Government. Installation paid under Item 62201.

21162 16+60 18 36 5 19 15 6 Yes Excavate to grade at flagged elevation (rocky channel approximately 5' below existing culvert outlet elevation.

Finished channel length will be approximately 41'.

21164 30+20 24 54 8 40 18 8 Yes

Culvert is offset to natural draw and outlet is perched approximately 10' above finished grade. Excavate to center of draw and down to flagged grade. Extra excavation may be necessary to remove pipe. Maintain spring flow in ditch on both sides of crossing. Dispose of excavated material beginning a minimum of 75' in back of channel and a minimum of 100' ahead of channel.

Note: Special Erosion Control sites may have running water and require measures to reduce sedimentation. Pay Item 62201 will be used at these sites to remove culverts and perform finish work on stream channels including installation of grade control structures. See Supplemental Specification 211 and General Notes.

ROAD 4541B

ROAD 4541 (Continued)

BID ITEM 2: CALLAHAN ROAD DECOMMISSIONING

STATION PAY

ITEM DESCRIPTION OF WORK

MP 0.0 21160 Begin work on Road 5800 at junction with County Road Yaak 92, approx. MP 48.3.

Remove barrier rocks (if present) across Road 5800 road entrance.

MP 0.49 =

STA 0+00

Junction with Road 6810.

1+00 21160 Remove berm for access.

21174 Construct double earth barrier at completion of work. Maintain 24" wide foot/horse path along cutslope side of berms.

21168 Begin road scarification and slash placement. Road width 12' - 14'.

5+70 21160 Begin roadway clearing. Light clearing to Station 34+00 (2" - 4" dia. alder in ditch and on cutbank, conifer regen. 4" - 6" dia. on fill slope. Moderate clearing 34+00 to 50+50 (brush and conifer across road, occasional blowdown across road 12" - 14" dia.)

21168 End road scarification.

21166 Begin partial road recontour, 3:1 embankment outslope.

8+80 21166 End partial recontour.

21168 Begin road scarification.

9+00 21169 Remove 12" diam. ditch relief culvert (length unknown).

9+20 21168 End road scarification.

21166 Begin partial recontour, 3:1 embankment outslope.

11+35 21166 End partial recontour 21168 Begin road scarification.

11+40 21171 Install ditch drainage waterbar.

16+25 21171 Check for buried culvert. If no culvert install ditch drainage waterbar. If a culvert is found remove and complete work under Pay Item 21169.

29+90 21169 Remove 18" x 20' ditch relief culvert.

31+90 21171 Install ditch drainage waterbar.

32+90 21171 Install ditch drainage waterbar.

33+90 21171 Install ditch drainage waterbar.

35+25 21169 Remove 18" x 24' culvert in shallow swale.

36+70 21171 Install ditch drainage waterbar.

40+00 21171 Install ditch drainage waterbar.

42+60 21171 Install ditch drainage waterbar.

43+45 21171 Install ditch drainage waterbar.

BID ITEM 1: CARIBOU WORK LOG - ROAD 5800

44+90 21168 End road scarification.

21166 Begin partial recontour through previous fill failure site. Outslope embankment 3:1.

Temporary road work may be necessary for equipment and vehicle access.

45+15 21166 End partial recontour.

21168 Begin road scarification.

45+60 21161 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 6 CY 10"+ rock for grade control and channel armoring. Note: May be able to obtain additional rock at STA 50+50.

62201 Remove culvert and construct stream channel as directed by CO.

46+50 21171 Install ditch drainage waterbar.

47+50 21171 Install ditch drainage waterbar.

48+50 21171 Install ditch drainage waterbar.

50+50 21162 Old bridge site on Caribou Creek. Remove approach fills and abutment as described on Stream Channel List.

Stockpile 20 CY 14"+ rock for channel construction.

62201 Construct stream channel directed by the CO.

21160 End roadway clearing.

21168 End road scarification.

End work on this road.

NOTE: Access to Road 5811 is via Road 5807. Do not establish a ford or drive equipment or vehicles across Caribou Creek other than access needed to do restoration work at the bridge site.

BID ITEM 1: CARIBOU WORK LOG - ROAD 5800

MILEPOST/

STATION

PAY

ITEM DESCRIPTION OF WORK

MP 0.0 Begin work on Road 5819 at junction with County Road Yaak 92, MP 49.5.

21159 Remove rocks for access. Note that on Roads 5819 and 5807 no roadway treatment

(scarification, decompaction or recontouring) or slash placement is required between work items.

21159 Begin roadway clearing. Short (<8'), patchy, discontinuous brush with large openings and limited amounts of brush overhanging road from cutbank. Few logs across roadway and generally under 4" diameter. Average road width estimated at 14 - 16'

MP 0.0 -

0.57

62201 Construct turn around area and move the existing rock and gate posts from the present location at the beginning of road to approximately 300' up the road. Exact locations of turnaround and gate will be flagged prior to work.

MP 0.00 21159 Junction with Road 5807. End clearing on Road 5819. Begin clearing on Road 5807.

21159 Remove earth berm. Begin clearing Road 5807.

21174 Construct double earth berm following completion of work. Maintain 24" wide foot/horse path along cutslope side of berms.

MP 5.23 =

STA 0+00

21160 Begin heavier clearing. Brush 8' - 12' high, generally continuous with lighter growth on outside of roadway and occasional openings. Brush overhanging from cutbank common. Trees scattered or patchy up to 6" dia. and 30' height. Downfall present (not common) and generally < 24" dia. Road width 10-18', averages 14'.

Provide for 60" path for ATV access across all drainage structures and partial recontour sections as shown on the drawings. Work is incidental to other pay items.

3+00 21160 Remove two berms for access. These berms will not be replaced.

4+00 21172 Construct surface waterbar.

5+00 21171 Construct ditch drainage waterbar.

6+00 21172 Construct surface waterbar.

7+00 21172 Construct surface waterbar.

8+40 21171 Construct ditch drainage waterbar.

9+50 21169 Remove 18" x 26' ditch relief culvert.

11+00 21172 Construct surface waterbar.

13+00 21172 Construct surface waterbar.

14+00 21172 Construct surface waterbar.

15+60 21171 Construct ditch drainage waterbar.

BID ITEM 1: CARIBOU WORK LOG - ROADS 5807 AND 5819

PAY

ITEM DESCRIPTION OF WORK

16+80 21170 Construct cross channel 2' (inlet) - 5' (outlet) depth x 2' wide x 60' long.

19+50 21170 Construct cross channel 4' (inlet)- 6' (outlet) depth x 2' wide x 65' long.

20+50 21172 Construct surface waterbar.

21+70 21169 Remove 18" x 30' ditch relief culvert.

25+30 21171 Construct ditch drainage waterbar.

26+20 21172 Construct surface waterbar.

26+70 21170 Construct cross channel 2.5' (inlet) - 6' (outlet) depth x 3' wide x 30' long.

28+20 21172 Construct surface waterbar. Armor outlet.

28+95 21171 Construct ditch drainage waterbar at existing scour channel. Excavate channel 1' - 2' deeper x 3' wide x 35' long. Armor Inlet. Maintain pool/wallow above. Site may require improvement for vehicle access.

31+70 21170 Construct cross channel 3' (inlet) - 5' (outlet) depth x 3' wide x 30' long.

32+80 21161 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 10 CY 10" + rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

33+80 21172 Construct surface waterbar.

34+50 21170 Construct cross channel 3' (inlet) - 6' (outlet) depth x 3' wide x 45' long. Outlet location is flagged.

37+50 21169 Remove 18" x 30' ditch relief culvert.

39+00 21169 Remove 18" x 30' ditch relief culvert. Construct 3' wide channel.

21175 Install 3 grade control structures with 10"+ rock.

43+50 21171 Construct ditch drainage waterbar.

45+50 21171 Construct ditch drainage waterbar.

47+80 21162 Excavate road fill at channel. See Stream Channel List. May require improvement for vehicle access.

Stockpile 12 CY 12" + rock for channel construction.

62201 Remove log structure and construct stream channel as directed by CO.

49+60 21172 Construct surface waterbar. Armor outlet.

51+10 21161 Excavate road fill at channel, remove collapsing buried log structure and armor inlet. See Stream Channel List. Will require improvement for vehicle access.

PAY

ITEM DESCRIPTION OF WORK

21175 Install 3 grade control structures with 10" rock.

53+00 21170 Construct cross channel 3' (inlet) - 6' (outlet) depth x 3' wide x 36' long.

54+30 21172 Construct surface waterbar.

55+00 21172 Construct surface waterbar.

55+75 21171 Construct ditch drainage waterbar. Armor inlet. Outlet location is flagged.

57+75 21171 Construct ditch drainage waterbar.

61+00 21171 Construct ditch drainage waterbar. May substitute slash for rock armor at outlet.

61+50 21172 Construct surface waterbar. Armor outlet (may substitute slash for rock armor at outlet).

64+00 21172 Construct surface waterbar.

67+20 21169 Remove 18" x 30' ditch relief culvert.

68+80 21170 Remove 18" culvert. Construct cross channel 3' (inlet) - 7' (outlet) depth x 3' wide x 21' long.

21175 Install 3 grade control structures with 10"+ rock.

69+50 21172 Construct surface waterbar.

71+40 21170 Construct cross channel 3' (inlet) - 5' (outlet) depth x 3' wide x 35' long. Armor inlet.

21175 Install 3 grade control structures with 10"+ rock.

74+90 21171 Construct ditch drainage waterbar.

78+50 21171 Construct ditch drainage waterbar.

80+00 21171 Construct ditch drainage waterbar.

87+70 21171 Construct ditch drainage waterbar.

89+50 21172 Construct surface waterbar.

91+00 21171 Construct ditch drainage waterbar.

92+70 21172 Construct surface waterbar.

94+60 21169 Remove 18" x 30' ditch relief culvert.

96+60 21172 Construct surface waterbar.

98+60 21171 Construct ditch drainage waterbar.

PAY

ITEM DESCRIPTION OF WORK

100+60 21172 Construct surface waterbar.

102+40 21171 Construct ditch drainage waterbar.

104+40 21172 Construct surface waterbar.

105+20 21170 Construct cross channel 4' (inlet) - 6' (outlet) depth x 4' wide x 30' long.

107+60 21166 Begin partial road recontour, 3:1 embankment outslope.

108+20 21166 End partial recontour

109+00 21169 Remove 18" x 24' ditch relief culvert.

113+00 21170 Remove 18" culvert. Construct cross channel 4' (inlet) - 8' (outlet) depth x 3' wide x 30' long.

Armor inlet with 6"+ rock.

21175 Install 3 grade control structures with 10"+ rock.

113+30 21171 Construct ditch drainage waterbar.

116+70 21161 Excavate road fill at stream channel. See Stream Channel List. Will require improvement for vehicle access.

Stockpile 4 CY 10" + rock for channel construction.

62201 Remove log structure and construct stream channel as directed by CO.

117+50 Wide landing area - past outfitter/hunting camp

119+70 21171 Construct ditch drainage waterbar.

121+15 21169 Remove 18" x 30' ditch relief culvert.

122+70 21162 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 15 CY 14" + rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

123+95 21161 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 10 CY 10" + rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

125+50 21171 Construct ditch drainage waterbar.

Stockpile 3 CY 6"+ rock for outlet and fill slope armor.

62201 Armor fill slope and outlet as directed by CO.

126+30 21171 Construct ditch drainage waterbar.

Stockpile 3 CY 6"+ rock for fill slope armor.

62201 Armor fill slope as directed by CO

128+10 21169 Remove 18" x 30' ditch relief culvert. Place excavated material on road surface only and leave ditch open in both directions.

PAY

ITEM DESCRIPTION OF WORK

130+25 21170 Remove 18" culvert. Construct cross channel 4' (inlet) - 10' (outlet) depth x 3' wide x 21' long.

21175 Construct 3 grade control structures with 10"+ rock.

130+40 21166 Begin partial road recontour, 3:1 embankment outslope. May require improvement for vehicle access.

131+00 21166 End partial recontour.

131+10 21171 Construct ditch drainage waterbar.

132+02 21172 Construct surface waterbar.

133+02 21172 Construct surface waterbar.

134+40 21169 Remove 18" x 30' ditch relief culvert.

135+50 21171 Construct ditch drainage waterbar. Armor inlet with 1/4 CY 6" rock.

Stockpile 3 CY 6"+ rock for inlet, outlet and fill armor.

62201 Armor inlet, outlet and fill slope as directed by CO

136+25 21172 Construct surface waterbar.

137+00 21172 Construct surface waterbar.

137+70 21171 Construct ditch drainage waterbar. Armor inlet with 1/2 CY 6" rock.

Stockpile 3 CY 6"+ rock for inlet, outlet and fill armor

62201 Armor inlet, outlet and fill slope as directed by the CO.

138+45 21172 Construct surface waterbar.

139+20 21172 Construct surface waterbar.

139+80 21171 Construct ditch drainage waterbar.

140+50 21172 Construct surface waterbar.

141+25 21172 Construct surface waterbar.

142+10 21169 Remove 18" x 40' ditch relief culvert. Construct 3' wide channel.

143+35 21171 Construct ditch drainage waterbar.

145+00 21169 Remove 18" x 30' ditch relief culvert.

146+00 21172 Construct surface waterbar.

148+45 21171 Construct ditch drainage waterbar.

PAY

ITEM DESCRIPTION OF WORK

148+60 21166 Begin partial recontour, 3:1 embankment outslope. Will require improvement for vehicle access.

62201 Slope stabilization work as directed by the CO.

149+20 21166 End partial recontour.

149+55 21170 Construct cross channel 2' (inlet) - 4' (outlet) depth x 3' wide x 30' long.

Stockpile 3 CY 6"+ rock for channel armor and grade control.

62201 Construct grade control and armor fill slope as directed by the CO.

149+90 21166 Begin partial road recontour, 3:1 embankment outslope.

62201 Slope stabilization work as directed by the CO.

150+50 21166 End partial recontour

150+60 21172 Construct surface waterbar

151+80 21170 Construct cross channel 2' (inlet) - 6' (outlet) depth x 3' wide x 30' long. Channel eroded across roadway, will require improvement for vehicle access.

21175 Construct 3 grade control structures with 10"+ rock.

152+65 21171 Construct ditch drainage waterbar.

154+95 21171 Construct ditch drainage waterbar. Armor with slash if rock is not available.

156+60 21169 Remove 18" x 30' ditch relief culvert.

159+55 21170 Construct cross channel 2' - 5' deep x 3' wide' x 30' long.

161+00 21172 Construct surface waterbar.

165+15 21169 Remove 18" x 30' ditch relief culvert.

165+80 21171 Construct ditch drainage waterbar.

166+00 Potential rock source. Do not disturb existing rock buttress.

170+00 21169 Remove 18" x 42' ditch relief culvert.

171+50 21172 Construct surface waterbar.

173+00 21172 Construct surface waterbar.

174+50 21172 Construct surface waterbar.

176+00 21172 Construct surface waterbar.

21160 End roadway clearing.

End path construction.

End work on this road.

0+00 Begin Road 5811 at junction with Road 5807 MP 3.0.

21160 Begin roadway clearing. Moderate to heavy clearing. Thick alder across roadway (avg.1" - 4" dia. x 6' - 10' ht.) and small conifers (avg. 2" - 4" dia. x 15' - 20' ht.). Average road width 16'.

0+25 21160 Remove berm for access. This berm will not be replaced.

0+60 21160 Clean ditch relief culvert outlet and inlet.

18+85 21171 Construct ditch drainage waterbar.

22+23 Ditch relief culvert - do not remove.

23+00 21171 Construct ditch drainage waterbar.

26+50 Remove berm for access.

21174 Construct double earth berm at completion of work. Maintain 24" wide foot/horse path along cutslope side of berms.

21168 Begin road scarification and slash placement.

26+70 21171 Construct ditch drainage waterbar.

26+88 21168 End road scarification.

21166 Begin partial road recontour, 3:1 embankment outslope.

28+38 21166 End partial recontour.

21168 Begin road scarification.

38+02 21170 Construct cross channel 3' wide x 40' long. 8' outlet depth. Check for buried culvert and remove and dispose of if found.

21175 Construct three grade control structures using 10"+ rock.

41+40 21171 Construct ditch drainage waterbar.

42+17 21162 Excavate road fill at stream channel. See Stream Channel list.

Stockpile 10 CY 10"+ rock for channel construction.

62201 Remove culvert and construct stream channel as directed by the CO.

43+17 21162 Excavate road fill at stream channel. See Stream Channel list.

Stockpile 4 CY 10"+ rock for channel construction.

62201 Construct stream channel as directed CO.

43+50 21171 Construct ditch drainage waterbar.

44+35 Caribou Creek. Work at stream crossing is described in Road 5800 Work Log and Stream Channel List.

21160 End roadway clearing.

21168 End road scarification and slash placement.

End work on this road.

BID ITEM 1: CARIBOU WORK LOG - ROAD 5811

Note: Work sites are currently flagged with site numbers identified. All work sites will be reflagged with station numbers prior to decommissioning.

BID ITEM 1: CARIBOU WORK LOG - ROAD 5811

0+00 Begin work on FSR 4521 (Junction with FSR 4530) 21160 Remove double earth barrier and begin roadway clearing. Road width averages

16' and is intermittently ditched beyond Station 40+70. Minimal clearing, mostly passable by vehicle (isolated small brush and occasional small downed logs) to sta. 40+00. Light to moderate clearing beyond Station 40+00. Pockets of thick brush and conifer regen. (1"dia. x 2 - 6' ht.) plus areas of (2- 4" dia. x 12' ht.)

alder growth on cut bank that sweeps over the road.

21174 Construct double earth barrier in previous location at completion of work.

Maintain 24" wide foot/horse path along cutslope side of berms.

1+00 21172 Reconstruct existing surface waterbar.

16+80 21172 Reconstruct existing surface waterbar.

21+80 21171 Construct ditch drainage waterbar.

26+20 21171 Construct ditch drainage waterbar.

29+50 21172 Construct surface waterbar.

32+20 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6"+ rock.

35+85 21172 Reconstruct surface waterbar.

40+25 21172 Reconstruct surface waterbar.

44+45 21172 Reconstruct surface waterbar.

48+10 21172 Reconstruct surface waterbar.

48+85 21171 Construct ditch drainage waterbar. Brush may be substituted for rock armor at outlet if rock is unavailable.

55+00 21172 Reconstruct existing surface waterbar.

57+14 62201 Armor fill slope below culvert outlet with 1 CY 6"+ rock.

63+70 21171 Construct ditch drainage waterbar.

69+90 21172 Construct surface waterbar.

71+36 N/A Potential rock source in cutbank.

79+85 21171 Construct ditch drainage waterbar.

83+60 21168 Begin road scarification and slash placement. Maintain 3' slash free foot path.

Remove dozer berm where necessary to allow drainage off outside edge of road.

87+60 62201 Improve existing cross channel as directed by CO.

BID ITEM 2: CALLAHAN WORK LOG - ROAD 4521

89+00 21160 Snap off or cut sweeping vegetation on cutbank to Station 90+50.

89+30 21172 Reconstruct surface waterbar.

91+10 21171 Construct ditch drainage waterbar. Brush may be substituted for rock armor at outlet if rock is unavailable.

93+10 21169 Remove 18" x 24' culvert. Excavate 1' lower than existing culvert outlet to scoured rock level. Armor outlet and inlet with 1/2 CY 6"+ rock on each.

96+10 21168 End road scarification.

21166 Begin partial recontour, 3:1 embankment outslope.

97+30 21166 End partial recontour.

21168 Begin road scarification.

97+60 62201 Improve existing cross channel as directed by CO.

98+80 21172 Reconstruct surface waterbar.

102+50 21169 Remove 18" x 28' ditch relief culvert. Excavate 1' lower than existing culvert outlet to scoured rock level. Armor inlet with 1/2 CY 6"+ rock.

21175 Install 2 grade control structures using 12"+ rock.

103+50 21172 Reconstruct surface waterbar.

106+70 21171 Construct ditch drainage waterbar. Brush may be substituted for rock armor at outlet if rock is unavailable

109+50 21171 Construct ditch drainage waterbar.

114+25 21169 Remove 18" x 30' ditch relief culvert. Excavate to 2' lower than existing culvert outlet - elevation flagged.

25170 Deliver 3 CY 12" diameter rock.

21175 Install 3 grade control structures using 12"+ rock.

114+25 21168 End road scarification.

21166 Begin reconstruction of partial recontour, 3:1 embankment outslope. Existing outslope - may need improvement for vehicle access.

118+30 21166 End reconstruction of partial recontour.

21168 Begin road scarifcation.

118+30 21172 Reconstruct surface waterbar.

121+40 21170 Remove 18" x 24' culvert. Construct cross channel 5' (inlet) - 21' outlet depth x 3' wide x 42' long. Maintain ditch seep flow into crossing.

25170 Deliver 10 CY 12" diameter rock.

21175 Install 4 grade control structures using 12"+ rock.

62201 Buttress cutslope as directed by CO

122+40 21171 Construct ditch drainage waterbar.

125+50 21171 Construct ditch drainage waterbar. Brush may be substituted for rock armor at outlet if rock is unavailable

128+50 21163 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 10 CY 12"+ rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

131+42 21171 Construct ditch drainage waterbar.

135+90 21171 Construct ditch drainage waterbar.

136+70 21163 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 10 CY 14"+ rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

139+40 21171 Construct ditch drainage waterbar. Leave ditch open from both directions dispose of excavated material to road surface only. Brush may be substituted for rock armor at outlet if rock is unavailable

150+00 21169 Remove 18" x 26' ditch relief culvert. Leave ditch open from both directions, dispose of excavated material to road surface only.

153+00 21162 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 10 CY 14" + rock for grade control structures.

62201 Remove culvert and construct stream channel as directed by CO.

155+70 21169 Remove 18" x 40' ditch relief culvert. Maintain open ditch flow to this channel.

Dispose of excavated material to road surface only and primarily to wide area approximately 60' behind this station.

21175 Install 3 grade control structures using 12"+ rock.

159+40 21172 Construct surface water bar. Armor outlet, brush may be substituted for rock.

165+00 N/A Landing area. May be used for staging/fueling for remaining portion of road work ahead of this station. Passenger vehicle access beyond this point is unnecessary. Clear only the vegetation necessary for equipment access and work completion beyond this point.

166+00 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY of 6"+ rock.

188+75 21172 Construct surface waterbar.

191+40 21172 Construct surface waterbar.

194+20 21169 Remove 18" x 28' ditch relief culvert. Armor outlet with 1/2 CY of 6" + rock.

21160 End roadway clearing.

21168 End road scarification.

195+00 End work on this road.

0+00 Begin project at bridge, approximately MP 0.6 on Road 4541.

21160 Remove earth barrier and begin roadway clearing. Road width averages 16' and is mostly ditched. Continuous brush averaging 6' - 12' height mostly overhanging from road edges mixed with small conifers ranging from 8' - 12' height scattered to common on road surface. Areas of thicker small brush/conifers (<8' htg.) across entire road surface past junction with Road 4541A. Downed logs present but uncommon and generally under 12" diameter.

21168 Begin road scarification and slash placement. Maintain non-scarified slash-free foot path 3' wide. Complete minor excavation as flagged (up to 2 hours total for this road) incidental to this pay item.

21174 Construct double earth barrier at completion of project. Maintain 24" foot/horse path around berms.

2+70 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY of 6" rock each.

25170 Deliver 1 CY 6" diameter rock.

5+00 21171 Construct ditch drainage waterbar. Brush may be substituted for rock armor at outlet if rock is unavailable

7+00 21172 Construct surface waterbar.

7+50 N/A Clean outlet of ditch relief culvert. Estimate 10 minutes. Incidental to 21168.

10+00 21171 Construct ditch drainage waterbar. Brush may be substituted for rock armor at outlet if rock is unavailable

12+00 21172 Construct surface waterbar.

16+80 21172 Construct surface waterbar.

20+50 21171 Construct ditch drain waterbar.

23+40 21171 Construct ditch drain waterbar. Armor inlet and outlet with 1/4 CY 6"+ rock each.

24+70 21172 Construct surface waterbar. Armor outlet and fill slope with 1 CY 12" + rock.

25170 Deliver 2 CY 12" diameter rock. Rock to be used for armoring at this station and sta. 35+65.

27+70 21172 Construct surface waterbar.

32+70 21172 Construct surface waterbar.

35+65 21172 Construct surface waterbar. Armor outlet and fill slope with 1 CY 12" + rock.

46+30 21172 Construct surface waterbar.

55+30 21172 Construct surface waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

BID ITEM 2: CALLAHAN WORK LOG - ROAD 4541

25170 Deliver 2 CY 6" diameter rock. Rock to be used for armoring at this station and sta. 65+54.

60+30 21172 Construct surface waterbar.

64+30 21168 Clean ditch for 70' ahead. Excavate to 3' width x 1' depth.

65+54 21172 Construct surface waterbar. Outlet location flagged. Armor inlet and outlet with 1/2 CY 6"+ rock each.

76+30 21172 Construct surface waterbar. Armor outlet and fill slope with 1 CY 12" + rock.

25170 Deliver 2 CY 12" diameter rock. Rock to be used for armoring at this station and sta. 79+30.

79+30 21172 Construct surface waterbar. Armor outlet and fill slope with 1 CY 12" + rock.

81+36 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

84+90 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6" + rock.

91+80 21168 Remove log from ditch.

93+40 21171 Construct ditch drainage waterbar.

96+30 21172 Construct surface waterbar.

99+60 21172 Construct surface waterbar.

102+50 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6" + rock.

106+20 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6" + rock.

108+90 21161 Excavate road fill and construct stream channel. See Stream Channel List.

21175 Construct 3 grade control structures using 12"+ rock.

111+20 21170 Construct cross channel, 3' (inlet) x 10' (outlet) x 3' wide x 40' long. Armor inlet and outlet with 1/2 CY 10"+ rock each.

21175 Install 2 grade control structures using 12"+ rock.

114+80 21161 Excavate road fill and construct stream channel . See Stream Channel List.

21175 Construct 3 grade control structures using 12"+ rock.

118+90 21162 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 45 CY 30"+ rock and 10 CY 12+ rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

120+10 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

121+80 21171 Construct ditch drainage waterbar.

124+80 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6" + rock.

127+40 21169 Remove 18" x 24' ditch relief culvert. Armor outlet with 1/2 CY 6" + rock.

132+60 Begin rock source in scree slopes above road.

134+00 End rock source.

139+35 21171 Construct ditch drainage waterbar. Armor outlet with 1 CY 12" + rock.

141+05 21163 Excavate road fill at stream channel . See Stream Channel List.

Stockpile 3 CY 12" + rock for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

141+43 Junction with FSR 4541A. No work planned on this spur road.

141+75 21171 Construct ditch drainage waterbar.

146+00 21172 Construct surface waterbar.

151+30 21172 Construct surface waterbar.

155+30 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

160+00 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

162+19 21163 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 18" + rock for channel construction.

25170 Deliver 15 CY 18" rock.

62201 Remove culvert and construct stream channel as directed by CO.

163+30 21171 Construct ditch drainage waterbar.

167+15 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6" + rock.

169+00 21172 Construct surface waterbar.

172+00 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

173+80 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

174+80 21171 Construct ditch drainage waterbar. Armor inlet with 1/2 CY and outlet with 1 CY 6" + rock.

25170 Deliver 3 CY 6" rock. Rock to be used for armoring at this station and sta.

175+25.

175+25 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

176+60 21164 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 10 CY 18" + rock for channel construction.

25170 Deliver 20 CY 18" rock.

62201 Remove culvert and construct stream channel as directed by CO.

178+28 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

180+20 21169 Remove 18" x 24' ditch relief culvert. Armor inlet and outlet with 1/2 CY 6" + rock each.

182+10 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

186+00 21170 Remove culvert. Construct cross channel, 3' (inlet) x 10' (outlet) x 4' wide x 35' long. Armor inlet with 1/2 CY 5" + rock. Maintain open ditch to this channel, dispose of excavated material in back of this site only.

25170 Deliver 2 CY 12" rock.

21175 Install 3 grade control structures with 12"+ rock.

189+85 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock each.

192+60 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 6" + rock

193+20 Junction with Road 4541B spur.

194+10 21169 Remove 18" x 24' ditch relief culvert. Armor outlet with 1/2 CY 6" + rock.

195+20 21171 Construct ditch drainage waterbar.

196+90 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY 6" + rock.

199+80 21163 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 30 CY 30" + rock for channel construction.

25170 Deliver 20 CY 30" rock.

62201 Remove culvert and construct stream channel as directed by CO.

201+70 21171 Construct ditch drainage waterbar. Locate just ahead of disposal area.

203+00 21170 Remove culvert. Construct cross channel, 6' (inlet) x 11' (outlet) x 4' wide depth x 35' long. Armor inlet with 1/2 CY 6" + rock. Maintain open ditch to this channel, dispose of excavated material in back of this site only.

21175 Install 3 grade control structures with 12"+ rock.

205+00 25170 Deliver 10 CY 12" diameter rock. Rock to be used for armoring at this station and stations ahead as needed. Large landing area, suitable for truck turnaround.

206+85 21169 Remove 18" x 24' ditch relief culvert. Armor inlet and outlet with 1/2 CY 12" + rock each.

208+85 21171 Construct ditch drainage waterbar. Armor inlet and outlet with 1/2 CY 12" + rock each.

210+70 21168 End road scarification.

21166 Begin partial recontour, 3:1 embankment outslope. 16' average road width.

62201 Complete slope stabilization work as directed by CO 232+10 End partial recontour.

232+20 21171 Construct ditch drainage waterbar.

21160 End road clearing.

End work.

0+00 Begin work (Station 193+20 on Road 4541).

21160 Begin roadway clearing. Road is mostly ditched with an average road width of 16'. Moderate to heavy tall brush (10 -15' height) on and overhanging roadway from cutbank and road edge mixed with 4' -10' conifer plus scattered larger 8" - 14" diameter trees mainly on road edge.

21168 Begin road scarification and slash placement. Complete minor excavation as flagged (up to 1 hour total for this road) incidental to this pay item.

1+10 21168 Clean ditch for 30' ahead. Excavate to 3' width x 1' depth.

2+20 21171 Construct ditch drainage waterbar. (Approximately 45' long.)

5+30 21171 Construct ditch drainage waterbar.

7+30 21171 Construct ditch drainage waterbar.

11+70 21171 Construct ditch drainage waterbar. Armor outlet with 1 CY 6" + rock.

25170 Deliver 1 CY 6" diameter rock.

13+45 21170 Construct cross channel 2' (inlet) - 8' (outlet) depth x 3' wide x 35' long.

Maintain open ditchline to channel. Dispose of excavated material below fill slope ahead of this site.

21175 Install 3 grade control structures with 12"+ rock.

15+90 21171 Construct ditch drainage waterbar.

16+60 21162 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 12" + rock if available for channel construction.

62201 Remove culvert and construct stream channel as directed by CO.

25170 Deliver 12 CY 12" diameter rock.

26+90 21172 Construct surface waterbar. Armor outlet with 1/2 CY of 6"+ rock.

25170 Deliver 1 CY 6" diameter rock. Rock to be used for armoring at this station and Station 28+20.

28+20 21171 Construct ditch drainage waterbar. Armor outlet with 1/2 CY of 6" + rock.

30+20 21164 Excavate road fill at stream channel. See Stream Channel List.

Stockpile 18" + rock if available for grade control structures.

62201 Remove culvert and construct stream channel as directed by CO.

25170 Deliver 10 CY 18" diameter rock

32+50 Junction with skid trail. Potential turnaround with improvement.

21160 End road clearing.

21168 End road scarification.

End road work.

BID ITEM 2: CALLAHAN WORK LOG - ROAD 4541B

P5_Callahan_proj_area
P6_Summary_quantities
Sum of Quant
P7_8_General_notes
P9_10_Caribou_steam_channel_list
Sheet1
P11_12_Callahan_stream_channel_list
Callahan Rev
P13_22_Caribou_worklog
Rd 5800
Rd 5807
Rd 5811
P23_31_Callahan_worklog
Rd 4521
Rd 4541
Rd 4541B

P32_PARTIAL_ROAD_ RECONTOUR