WD Mt Rose.docx
DOCX document 27 KB Posted
- Solicitation number
- AG-82B1-S-10-0333
About this file
ATTACHMENT TO AMEND 002 WAGE DETERMINATIONS NV30 NV6 AND NV57
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sign in prebid.pdf | ||
| amend 003 mt rose signed.pdf | ||
| Prebid Min.doc | DOC document | |
| amend 002 0333.signedpdf.pdf | ||
| Amend 001.pdf | ||
| MtRose.Specs.Final.2010.03.19.docx | DOCX document | |
| AG-82B1-S-10-0333.pdf | ||
| Mt Rose.Drawings.Final.2010-03-23.pdf | ||
| AG-82B1-S-10-0333.doc | DOC document | |
| WD.docx | DOCX document | |
| fire_precautions.doc | DOC document | |
| FS_ARRA_SIGN_DETAILS_2apr09.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: NV100030 03/19/2010 NV30
Superseded General Decision Number: NV20080030
State: Nevada
Construction Type: Heavy
Counties: Storey and Washoe Counties in Nevada.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Modification Number Publication Date 0 03/12/2010 1 03/19/2010
CARP0971-007 07/01/2009
Rates Fringes
CARPENTER
Including Form Work.........$ 27.54 10.76
ZONE PAY:
ZONE 1: All work within 50 road miles of either Carson City Courthouse or Washoe County Courthouse shall be considered a Free Zone.
ZONE 2: All work within 50 to 150 road miles of the Washoe County Courthouse shall receive $3.00 additional per hour.
ZONE 3: All work within 150 to 300 road miles of the Washoe County Courthouse shall receive $4.00 additional per hour.
ZONE 4: Any work performed in excess of 300 road miles of the Washoe County Courthouse shall receive $5.00 additional per hour.
ELEC0401-001 12/01/2009
Rates Fringes
ELECTRICIAN......................$ 35.40 13.02+3%
* ENGI0003-031 07/01/2009
Rates Fringes
OPERATOR: Power Equipment (01a) Lubeman...............$ 27.94 16.02
(02) Bulldozer..............$ 28.47 16.02
(03) Skid Loader/Bobcat, Excavator...................$ 28.74 16.02
(06) Roller.................$ 29.95 16.02
(08) Loader up to and including 2-1/2 cu. yds.
and Scraper.................$ 30.79 16.02
(09) Mechanic and Backhoe Loader Combo................$ 31.11 16.02
(10) Loader over 2-1/2 cu.
yds. up to and including 4
cu. yds), Grade Setter, Grader/Blade................$ 31.46 16.02
(11) Backhoe, Loader over 4 cu. yds. up to and including 12 cu. yds., Trackhoe....................$ 31.89 16.02 (11a) Loader over 12 cu.yds......................$ 33.53 16.02
ZONE PAY:
Zone 1: All work within 50 road miles of Carson City Courthouse of Washoe County Courthouse shall be considered a Free Zone.
Zone 2: All work 50 to 150 road miles from Washoe County Courthouse shall receive $2.00 additional per hour.
Zone 3: All work 150 to 300 road miles from Washoe County Courthouse shall receive $3.00 additional per hour.
Zone 4: All work over 300 road miles from Washoe County Courthouse shall receive $4.00 additional per hour.
IRON0118-004 07/01/2009
Rates Fringes
IRONWORKER: Reinforcing and Structural.......................$ 33.00 23.71
* LABO0169-017 10/01/2009
Rates Fringes
LABORER
(1) Common or General.......$ 22.40 8.42 (1A) Flagger................$ 19.53 8.42
(3) Form Stripping, Mason Tender - Cement/Concrete and Pipelayer...............$ 22.65 8.42
PAIN0567-015 07/01/2007
Rates Fringes
PAINTER..........................$ 23.44 7.80
PLAS0797-003 10/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 20.82 11.43
SUNV2007-030 09/19/2007
Rates Fringes
LABORER: Concrete Saw...........$ 23.92 0.00
LABORER: Landscape..............$ 18.51 0.00
OPERATOR: Crane.................$ 29.21 10.42
TRUCK DRIVER: Dump Truck........$ 19.37 5.06
TRUCK DRIVER: Flatbed Truck.....$ 19.49 3.95
TEAM0533-005 12/01/2007
Rates Fringes
TRUCK DRIVER: Water Truck 2,500 gallons & over........$ 22.26 11.94 Up to 2,500 gallons.........$ 22.24 11.94
ZONE PAY:
ZONE 1: All work within 50 road miles of either Carson City Courthouse or Washoe County Courthouse shall be considered a Free Zone.
ZONE 2: All work 50 to 150 road miles from the Washoe County Courthouse shall receive $2.00 additional per hour.
ZONE 3: All work 150 to 300 road miles from the Washoe County Courthouse shall receive $3.00 additional per hour.
ZONE 4: Any work performed more than 300 road miles from the Washoe County Courthouse shall receive $4.00 additional per hour.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: NV100006 03/19/2010 NV6
Superseded General Decision Number: NV20080006
State: Nevada
Construction Type: Building
County: Washoe County in Nevada.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
0 03/12/2010 1 03/19/2010
BRNV0013-001 08/01/2008
Rates Fringes
BRICKLAYER.......................$ 22.94 9.14
BRNV0013-003 07/01/2008
Rates Fringes
MARBLE MASON.....................$ 24.74 9.08
TILE FINISHER....................$ 16.84 7.18
TILE SETTER......................$ 23.24 9.08
CARP0971-001 07/01/2009
Rates Fringes
CARPENTER (Including Drywall Hanging,Form Worker,and Metal Stud Installation)...............$ 27.54 10.76
ZONE PAY:
ZONE 1: All work within 50 road miles of either Carson City Courthouse or Washoe County Courthouse shall be considered a Free Zone.
ZONE 2: All work within 50 to 150 road miles of the Washoe County Courthouse shall receive $3.00 additional per hour.
ZONE 3: All work within 150 to 300 road miles of the Washoe County Courthouse shall receive $4.00 additional per hour.
ZONE 4: Any work performed in excess of 300 road miles of the Washoe County Courthouse shall receive $5.00 additional per hour.
ELEC0401-001 12/01/2009
Rates Fringes
ELECTRICIAN......................$ 35.40 13.02+3%
* ENGI0003-001 07/01/2009
Rates Fringes
OPERATOR: Power Equipment (03)Excavator and Grader (Finishing and Non- Finishing)..................$ 29.79 16.02 (03)Forklift (under 20 ft) and Skid Loader/Bobcat......$ 28.74 16.02 (04)Forklift (20 ft and over).......................$ 29.48 16.02 (06)Base Roller (Ride Along) and Paver (Incl.
Asphalt)....................$ 29.95 16.02 (08)Bulldozer, Loader (up to and including two and one-half [2-1/2] cu. yds.)
and Scraper.................$ 30.79 16.02 (09)Mechanic................$ 31.11 16.02 (10)Loader (over two and one-half [2-/12] cu. yds.
up to and including four [4] cu. yds) and Grade Setter......................$ 31.46 16.02 (11)Loader (over four [4]
cu. yds. up to and including twelve [12] cu.
yds.).......................$ 31.89 16.02 (11A)Loader (over twelve [12] cu.yds.................$ 33.53 16.02 Base Roller (Ride Along) and Paver (Incl. Asphalt)..$ 28.34 13.65 Bulldozer, Loader (up to and including two and one-half [2-1/2] cu. yds.) and Scraper.....................$ 28.93 13.65 Excavator and Grader (Finishing and Non- Finishing)..................$ 29.79 13.65 Forklift (20 ft and over)...$ 27.62 13.65 Forklift (under 20 ft) and Skid Loader/Bobcat..........$ 26.88 13.65 Loader (over four [4] cu.
yds. up to and including twelve [12] cu. yds.).......$ 30.03 13.65 Loader (over twelve [12] cu.yds......................$ 31.67 13.65 Loader (over two and one-half [2-/12] cu. yds. up to and including four [4]
cu. yds) and Grade Setter...$ 29.60 13.65 Mechanic....................$ 29.25 13.65
AREA PAY (Free Area and Remote Area Rates)
AREA 1 PAY SCALE: All that area falling within fifty (50) road miles of either the Carson City Courthouse or the Washoe County Courthouse shall be considered a free area for the purpose of this agreement;
AREA 2 PAY SCALE: All work falling between fifty (50) and one hundred and fifty (150) road miles of the Washoe County Courthouse shall be computed at an additional $2.00 per hour;
AREA 3 PAY SCALE: All work falling between one hundred and fify (150) and three hundred (300) miles of the Washoe County Courthouse shall be computed at an additional $4.00 per hour;
AREA 4 PAY SCALE: Any work performed in excess of three hundred (300) road miles of the Washoe County Courthouse shall be computed at an additional $4.00 per hour.
IRON0118-002 07/01/2009
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.00 23.71
* LABO0169-009 10/01/2009
Rates Fringes
LABORER
(1) Common or General, Cone Setter, Compactor (Asphalt & Dirt) handheld for patchwork...............$ 22.40 8.42 (1A) Flagger................$ 19.53 8.42
(3) Asphalt Shoveler, Concrete Saw, Concrete Vibrator, Form Stripping, Jackhammer, Mason Tender - Cement/Concrete, Plaster Tender, Rigging/Signaling for Crane, Trencher-hand guided......................$ 22.65 8.42
(4) Asphalt Dumpman, Asphalt Raker, Pipelayer....$ 22.90 8.42
(5) Asbestos Removal (Floor, Wall, Ceiling)......$ 23.20 8.42
PAIN0567-009 07/01/2009
Rates Fringes
SOFT FLOOR LAYER, Including Vinyl and Carpet.................$ 26.41 9.85
PAIN0567-013 07/01/2009
Rates Fringes
PAINTER
Drywall Finishing...........$ 26.54 8.95 Paperhanger, Spray..........$ 25.74 7.85 Prep, Brush, Roller.........$ 24.89 7.85
PLAS0797-003 10/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 20.82 11.43
PLAS0797-006 07/01/2007
Rates Fringes
PLASTERER........................$ 21.16 10.11
PLUM0350-006 08/01/2009
Rates Fringes
PLUMBER/PIPEFITTER...............$ 29.08 9.97
SFNV0699-001 01/01/2010
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 38.60 17.60
SHEE0026-001 08/01/2008
Rates Fringes
SHEETMETAL WORKER (Including HVAC Duct Installation and Metal Roof)......................$ 29.14 13.46
SUNV2007-004 08/01/2007
Rates Fringes
FENCE ERECTOR....................$ 15.27 3.03
LABORER: Landscape..............$ 9.85 0.00
LABORER: Mason Tender - Brick...$ 15.96 0.00
OPERATOR: Backhoe...............$ 16.67 0.00
OPERATOR: Trencher..............$ 27.96 0.00
ROOFER, Excluding Metal Roofs....$ 14.23 3.03
TRUCK DRIVER: Dump Truck........$ 16.90 0.00
TRUCK DRIVER: Water Truck.......$ 17.22 2.45
TEAM0533-003 07/01/2008
Rates Fringes
TRUCK DRIVER
Flatbed.....................$ 20.15 11.64
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
1.) Has there been an initial decision in he matter? This can
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
General Decision Number: NV100062 04/23/2010 NV62
State: Nevada
Construction Type: Highway
County: Washoe County in Nevada.
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
0 04/23/2010
SUNV2010-016 03/12/2010
Rates Fringes
BRICKLAYER.......................$ 32.68
BRICKLAYER ZONE PAY: add the applicable amounts per hour calculated on a radius of over 50 miles from Washoe County Courthouse in Reno, Nevada:
Zone 1: 0 to 35 miles: $0.00
Zone 2: over 35 to 75 miles: $1.25
Zone 3: over 75 miles: $5.37
CARPENTER........................$ 38.30
CARPENTER ZONE PAY: add the applicable amounts per hour, calculated from the Washoe County Courthouse:
Zone 1: 0 to 50 miles: $0.00 (road miles of either the Carson City Courthouse or the Washoe County Courthouse)
Zone 2: over 50 to 150 miles: $3.00
Zone 3: over 150 to 300 miles: $4.00
Zone 4: over 300 miles: $5.00
CEMENT MASON.....................$ 34.40
ELECTRICIAN
Electrician:
Neon Sign..................$ 44.31 Wireman....................$ 34.39 Line Construction:
Groundman..................$ 39.19 Heavy Equipment Operator...$ 47.86 Lineman....................$ 57.91
FENCE ERECTOR....................$ 37.89
Hod Carrier (Brick Mason Tender)..........................$ 30.10 HOD CARRIER ZONE PAY: add the applicable amounts per hour, calculated based on radius from the Washoe County Courthouse:
Zone 1: 35 to 75 miles: $1.25
Zone 2: over 75 miles: $7.50
IRONWORKER.......................$ 54.38
LABORER
Flagperson..................$ 27.95 Group 1.....................$ 30.82 Group 2.....................$ 30.92 Group 3.....................$ 31.07 Group 4.....................$ 31.32 Group 5.....................$ 31.62 Gunman, Materialman.........$ 31.32 Highway Striper.............$ 33.57 Landscaper..................$ 25.66 Nozzleman, Rodman...........$ 31.62 Reboundman..................$ 30.97 Traffic Barrier Erector.....$ 30.82 LABORER ZONE PAY: add the applicable amounts per hour, calculated based on a radius from either the Carson City Courthouse or the Washoe County Courthouse:
Zone 1: 0 to 50 miles: $0.00
Zone 2: over 50 to 150 miles: $2.00 (Based on a radius from the Washoe County Courthouse)
Zone 3: over 150 to 300 miles: $3.00 (Based on a radius from the Washoe County Courthouse)
Zone 4: over 300 miles: $4.00 (Based on a radius from the Washoe County Courthouse)
LABORER CLASSIFICATIONS:
Group 1
All cleanup work of debris; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares; General; Guide Posts and Highway Signs; Guardrail Erection and Dismantling;
Limber, Brushloader and Piler
Group 2
Choker setter or Rigger (clearing work only) Pittsburgh;
Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakeman);
Panel Forms (wood or metal) handling, cleaning and stripping of Loading and unloading, (Carrying and handling of all rods and material for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper
Group 3
Asphalt Workers (Ironers, Shovelers, Cutting Machine);
Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type); handling, cleaning\stripping; Concrete Saw;
Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking; Hand-Guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precast or cut); Ditching Machine (hand-guided); Drillers Tender; Chuck Tender; Form Raiser; Slip Forms; Grouting of Concrete Walls;
Headerboardman; Jackhammer, Pavement Breaker, Air Spade;
Mastic Worker (wet or dry); Pipewrapper; Kettleman, Potman;
application of asphalt, creosote and similar type materials;
All Power Tools (air, gas, or electric), Post Driver; Riprap- Stonepaver and RockSlinger, including placing of sack concrete wet or dry; Rototiller; Rigging and Signaling in connection with Laborers' work; Sandblaster, Potman; Vibra-screed
Group 4
Joy Drill Model TWM-2A, Gardner Denver Model DN143 and similar type drills and Track Drillers, Diamond Core Drillers, Wagon Drillers, Mechanical Drillers on Multiple Units; High scalers;
Concrete pump; Heavy Duty Vibrator with Stinger over 5" diameter; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit Cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Equipment); TV Monitoring and Grouting of Utility Lines; Asphalt Rakers
Group 5
Construction Specialist; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used for such loading and placing
MILLWRIGHT.......................$ 49.70
Operating Engineer: (All Other Work) Group 1....................$ 41.33 Group 1A...................$ 44.09 Group 2....................$ 44.62 Group 3....................$ 44.89 Group 4....................$ 45.63 Group 5....................$ 45.93 Group 6....................$ 46.10 Group 7....................$ 46.35 Group 8....................$ 46.94 Group 9....................$ 47.26 Group 10....................$ 47.61 Group 10A...................$ 47.80 Group 11....................$ 48.04 Group 11A...................$ 49.68 Group 11B...................$ 50.49 Lubrication & Service Engineer....................$ 46.10
ZONE PAY [ALL OPERATING ENGINEERS INCLUDING PILEDRIVERS, &
STEEL ERECTION]: add the applicable amounts per hour, calculated based on a radius from the Washoe County Courthouse:
Zone 1: 0 to 50 miles: $0.00 (of either the Carson City Courthouse or the Washoe County Courthouse)
Zone 2: over 50 to 150 miles: $2.00
Zone 3: over 150 to 300 miles: $3.00
Zone 4: over 300 miles: $4.00
OPERATING ENGINEER CLASSIFICATIONS:
Group 1
Engineer Assistant
Group 1A
Heavy Duty Repairman Tender; Oiler; Parts man
Group 2
Compressor; Material Loader and/or Conveyor (handling building materials); Pump
Group 3
Bobcat or similar loader, under 1/4 cu. yd.; Concrete Curing Machines; Conveyor Belt (tunnel); Forklift (under 20');
Engineer Generating Plant (500 K.W.); Mixer Box (concrete plant); Motorman; Rotomist; Oiler (truck crane)
Group 4
Concrete Mixer Skip type; Dinky; Forklift (over 20') or Lumber Stacker; Ross Carrier; Skip Loader under 1 cu. yd; Tie Spacer
Group 5
Concrete Mixers over 1 cu. yd.; Concrete Pumps or Pumpcrete Guns; Elevator and Material Hoist 1 drum; Groundman for Asphalt Milling and similar
Group 6
Auger type drilling equipment up to 30 ft. depth digging capacity; Boom Truck or Dual Purpose A-Frame Truck; B.L.H.
Lima Road Pactor or similar; Chip Box Spreader (Flaherty type or similar); Concrete Batch Plant (wet or dry); Concrete Saws;
Locomotives (over 30 tons); Maginnis International Full Slab Vibrator; Mechanical Finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical Burn, Curb and/or Curb and Gutter Machine (concrete or asphalt); Pavement Breaker, Truck Mounted with compressor combination; Pavement Breaker or Tamper (with or without compressor combination);
Power Jumbo (setting slip-forms, etc., in tunnels); Roller (except asphalt) Self-Propelled Tape Machine; Self-Propelled Compactor (single engine); Self-Propelled Power Sweeper; Slip- Form Pump (power-driven by hydraulic, electric, air, gas, etc.
lifting device for concrete forms); Small Rubber-Tired Tractors; Snooper Crane, Paxton-Mitchell or similar;
Stationary Pipe Wrapping, Cleaning and Bending Machine
Group 7
Auger type drilling equipment over 30 ft. depth digging capacity; Compressor (over 2); Concrete Conveyor or Concrete Pump, truck or equipment mounted (any assistance required shall be performed by an Assistant to Engineer) Boom length to apply; Concrete Conveyor, Building Site; Drilling and Boring Machine, vertical and horizontal (not to apply to waterliners, wagon drills or jack hammers); Crusher Plant Engineer;
Generators; Kolman Loader; Material Hoist 2 or more drums;
Mechanical Finishers or Spreader Machine (asphalt, Barber- Greene or similar); Mine or Shaft Hoist; Pipe Bending Machines (pipeline only); Pipe Cleaning Machines (tractor-propelled and supported); Pipe Wrapping Machines (tractor-propelled and supported); Portable Crushing and Screening Plants; Post Driller and/or Driver; Pumps over 2; Roller asphalt; Screedman (except asphalt or concrete paving); Screedman (Barber-Greene and similar) (asphalt or concrete paving); Self-Propelled Boom- Type Lifting Device (center mount) (on under 10 ton capacity) Slusher; Surface Heater and Planer; Trenching Machine (maximum digging capacity 3 ft. depth); Truck-Type Loader
Group 8
Asphalt Plant Engineer; Asphalt Milling Machine; Cast-In-Place Pipe-Laying Machine; Combination Slusher and Motor; Concrete Batch Plant (multiple units); Dozer; Drill Doctor; Elevating Grader; Grooving and Grinding Machine; Ken Seal; Loader (up to 2 1/2 cu. yds; Mechanical Trench Shield; Mixermobile; Push Cats; Road Oil Mixing Machine Wood-Mixer (and other similar Pugmill equipment); Rubber-Tired Earthmoving Equipment (up to 35 cu. yds. "struck", Euclids, T-Pulls, DW10, 20, 21 and similar); Self-Propelled Compactors with Dozer; Hyster 450, Cat 825 or similar; Sheepfoot; Small Tractor (with boom); Soil Stabilizer (P & H or equal); Timber Skidder (rubber-tired) or similar equipment; Tractor-Drawn Scraper; Tractor; Tractor- Mounted Compressor Drill Combination; Trenching Machine over 3 feet depth; Tri-Batch Paver; Tunnel Badger or Tunnel Boring Machine; Tunnel Mole Boring Machine; Vermeer T-600b Rock Cutter
Group 9
Chicago Boom; Combination Backhoe and Loader (up to 3/8 cu.
yd.); Combination Mixer and Compressor (gunite); Lull Hi-Lift (over 20 feet); Mucking Machine; Sub-Grader (Gurries or other types); Tractor with Boom (D6 or larger); Track-Laying-Type Earthmoving Machine (single engine with tandem scrapers)
Group 10
Boom-Type Backfilling Machine; Bridge Crane; Cary-Lift or similar; Chemical Grouting Machine; Derricks; Derrick Barges (except excavation work); Euclid Loader and similar types;
Grade Setter, Grade Checker; Heavy Duty Rotary Drill Rigs;
Lift-Slab (Vagtborg and similar types); Loader over 2 1/2 cu.
yds. up to 4 cu. yds.; Locomotive over 100 tons, single or multiple units; Multiple-Engine Earthmoving Machines (Euclid Dozers, etc.); Pre-Stress Wire Wrapping Machine; Rubber-Tired Scraper, Self-Loading; Single-Engine Scraper over 35 cu. yds.;
Shuttle Car (Reclaim Station); Train Loading Station;
Trenching Machine multi-engine with sloping attachments (Jefco or similar); Vacuum Cooling Plant; Whirley Crane (under 25 tons)
Group 10A
Backhoe-Hydraulic up to 1 cu. yd.; Backhoe up to 1 cu. yd.
(Cable); CMI Dual Lane Auto-Grader SP30 or similar type;
Cranes not over 25 tons (hammerhead and gantry); Finish Blade;
Gradalls up to 1 cu. yd.; Motor Patrol; Power Shovels;
Clamshells; Draglines; Cranes up to 1 cu. yd.; Rubber-Tired Scraper, Self-Loading (twin engine); Self-Propelled Boom-Type Lifting Device, center mount over 10 tons up to 25 tons
Group 11
Automatic Asphalt or Concrete Slip-Form Paver; Automatic Railroad Car Dumper; Canal Trimmer; Cary Lift, Campbell or similar type; Cranes over 25 tons; Euclid Loader when controlled from the Pullcat; Highline Cableway; Loader over 4
cu. yds. up to 12 cu. yds;
Multi-Engine Earthmoving Equipment up to 75 cu. yds. Struck;
Multi-Engine Scrapers (when used to Push Pull); Power Shovels, Clamshells, Draglines, Backhoes Gradalls over 1 cu. yd. up to 7 cu. yds.; Self-Propelled Boom-Type Lifting Device (center mount) over 25 tons; Self-Propelled Compactor with multiple-propulsion power units; Single-Engine Rubber-Tired Earthmoving Machine with Tandem Scraper; Slip-Form Paver (concrete or asphalt); Tandem Cats and Scraper; Tower Crane Mobile (including Rail Mount); Truck Mounted Hydraulic Crane when remote control equipped over 10 tons up to 25 tons; Universal Liebher and Tower Cranes (and similar types); Wheel Excavator up to 750 cu. yds. per hour; Whirley Cranes over 25 tons
Group 11A
Band Wagons (in conjunction with Wheel Excavators);
Helicopter; Loader over 12 cu. yds.; Multi-Engine Earthmoving Equipment over 75 cu. yds. "struck"; Power Shovels;
Clamshells, Draglines, Backhoes, and Gradalls over 7 cu. yds.;
Remote-Controlled Earth Moving Equipment; Wheel Excavator over 750 cu. yds. per hour
Group 11B
Holland Loader or similar or Loader over 18 cu. yds.
Operating Engineer:
(PILEDRIVER)
Group 1 Oiler...............$ 48.72 Group 1 Truck Crane Oiler...$ 50.64 Group 1.....................$ 56.10 Group 2 Oiler...............$ 48.52 Group 2 Truck Crane Oiler...$ 50.43 Group 2.....................$ 54.56 Group 3 Oiler...............$ 48.29 Group 3 Truck Crane Oiler...$ 50.21 Group 3.....................$ 53.11 Group 4.....................$ 51.60 Group 6.....................$ 49.38 Group 8.....................$ 47.46
OPERATING ENGINEER CLASSIFICATIONS [PILEDRIVER]
Group 1
Derrick Barge Pedestal mounted over 100 tons; Clamshells over 7 cu. yds.; Self Propelled Boom Type Lifting Device, over 100 tons; Truck Crane or Crawler, land or barge mounted over 100 tons
Group 2
Derrick Barge Pedestal mounted 45 to 100 tons; Clamshells under 7 cu. yds.; Self Propelled Boom Type Lifting Device over 45 tons; Truck Crane or Crawler, land or barge mounted, 45 up to 100 tons
Group 3
Derrick Barge Pedestal mounted under 45 tons; Self Propelled Boom Type Lifting Device under 45 tons; Skid/Scow Piledriver, any tonnage; Truck Crane or Crawler, land or barge mounted under 45 tons
Group 4
Forklift, over 10 tons
Group 6
Deck Engineer
Group 8
Deckhand, Fireman
Operating Engineer: (STEEL
ERECTION)
Group 1 Oiler...............$ 48.50 Group 1 Truck Crane Oiler...$ 50.46 Group 1.....................$ 56.63 Group 2 Oiler...............$ 48.29 Group 2 Truck Crane Oiler...$ 50.21 Group 2.....................$ 55.12 Group 3 Hydraulic...........$ 49.66 Group 3 Oiler...............$ 48.07 Group 3 Truck Crane Oiler...$ 49.99 Group 3.....................$ 53.88 Group 4.....................$ 52.15 Group 5.....................$ 51.05
OPERATING ENGINEER CLASSIFICATIONS [STEEL ERECTION]
Group 1
Cranes over 100 tons; Derrick over 100 tons; Self-Propelled Boom Type Lifting Devices over 100 tons
Group 2
Cranes over 45 tons up to 100 tons; Derrick under 100 tons;
Self Propelled Boom Type Lifting Device over 45 tons; Tower Crane
Group 3
Cranes, under 45 tons; Self Propelled Boom Type Lifting Device under 45 tons
Group 4
Chicago Boom; Forklift over 10 tons
Group 5
Boom Cat
PAINTER
Brush, Roller...............$ 32.74 Sandblast...................$ 33.24 Spray.......................$ 33.59 Structural Steel............$ 33.74
PILEDRIVERMAN....................$ 58.47
PLUMBER/PIPEFITTER...............$ 45.20
TRUCK DRIVER.....................$ 28.61
Truck Drivers Including Dump Trucks, Dumpcretes and Bulk Spreader, Transit Mix, Transit Mix (Using Boom), Water & Jetting Trucks, Bus & Manhaul Drivers, and Winch Truck & "A" Frame Drivers
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
1.) Has there been an initial decision in the matter? This can
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
File details come from the government source that posted it. Updated .