Prebid Min.doc

DOC document 23 KB Posted

Attached to
RECOVERY** - MT Rose Campground Construction - H-T NF
Solicitation number
AG-82B1-S-10-0333
Issued by

About this file

Prebid minutes

View the file

Other files

File Type Posted
sign in prebid.pdf PDF
amend 003 mt rose signed.pdf PDF
amend 002 0333.signedpdf.pdf PDF
WD Mt Rose.docx DOCX document
Amend 001.pdf PDF
MtRose.Specs.Final.2010.03.19.docx DOCX document
AG-82B1-S-10-0333.pdf PDF
Mt Rose.Drawings.Final.2010-03-23.pdf PDF
AG-82B1-S-10-0333.doc DOC document
WD.docx DOCX document
fire_precautions.doc DOC document
FS_ARRA_SIGN_DETAILS_2apr09.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mt. Rose Campground Reconstruction Project

Pre-bid walk-through

May 14, 2010 10:30am

The following information was discussed on site:

· No blasting is permitted on this project.

· Grinding scheduling and methods are at the contractor’s discretion. Any grinding operations shall not be outside of the disturbed area for the contract.

· The Davis-Bacon wages posted are incorrect and will be revised for the local area.

· The toilets are provided and placed by the government. Contractor is only required to dig and backfill the hole and coordinate timing.

· All aggregate material shall match the grading shown on the plans and in the specifications. The grading requirements for each type are given in the specifications.

· The questions regarding the well have not been answered yet.