RECOVERY** Silver Creek Campground Construction, Boise NF
Solicitation number
AG-82B1-S-10-0234
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
amend 003 0234(signed).pdf PDF
amend2.0234.pdf PDF
Amendment 001 —
amend01 signed.pdf PDF
Wage Determination.doc DOC document
AG-82B1-S-10-0234.doc DOC document
J5_fire precautions.doc DOC document
SilverCreek_Drawings_Final_Signed_02-19-10.pdf PDF
FS ARRA SIGN DETAILS.pdf PDF
AG-82B1-S-10-0234.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Important Information (this text is hidden):

1- Tracking changes – Microsoft Word has problems merging document in which track changes is turned on or where it has been on and the changes have not all been accepted. Before merging any documents make sure track changes is off and all changes have been accepted.

a. Ctrl+shift+E toggles “Track Changes” also you can toggle them through the menu pulldown “Tools – Track Changes”. When you toggle them the “Reviewing” toolbar is activated and which allows you to see and accept or reject changes.

2- When creating or editing specs, do not type notes or comments in or before the “PART-1 GENERAL” line. These may cause problems in specs reading in correctly.

a. Do not worry about those written by Masterspec. We know how to ignore them.

b. You can write all you want throughout the rest of the Spec, including loading up the end of the spec if you would like.

3- Contracting:

a. We try to save this first sheet for whatever contracting would like to add.

b. The header is also left blank for contracting. Edit the header anywhere and it will affect the header throughout this document. The footer is ours.

4- Section C and other non-specs must be added manually (see 3.a above).

5- Adding specs requires updating the list of specs, this may be done automatically through the “Specs” toolbar “TableOfContents” and “Update TOC” Buttons.

6- Be consistent when creating specs. Using different formatting within a single spec causes confusion for Microsoft Word and it will mess up your formatting.

7- This is created using 12 point font. Reading in specs of other font sizes will create minor font inconsistencies. You can change the font size upon completion of the spec package manually to whatever size you want for consistency sake.

8- Other Regions can use this; it is a minor programming change to correct R4 to something else. Send a request and a faxed picture of a large Hawaiian pizza to me and I will get right on it.

1.1 SPECIFICATIONS

A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

Section 010250 - Construction Staking

Section 011250 - Measurement and Payment with Asphalt

Section 011900 - Mobilization

Section 013300 - Submittal Procedures

Section 014100 - Quality Control

Section 023701 - Sediment and Erosion Control Measures

Section 024100 - Waste Material Disposal

Section 024102 - Removal, Disposal, & Salvage of Existing Structures

Section 033000 - Cast-In-Place Concrete

Section 033020 - Concrete from Packaged Dry Mix for Minor Structures

Section 047000 - Manufactured Masonry for Sign Bases

Section 073129 - Wood Shakes

Section 099100 - Painting

Section 101110 - Bulletin Board

Section 101400 - Signs

Section 101410 - Major Site I.D. Sign (HDPE) and Base

Section 101415 - Minor Site I.D. Signs (HDPE)

Section 129305 - Fee Tube

Section 129400 - Family Unit and Site Furnishings

Section 129410 - Group Site and Site Furnishings

Section 133400 - Precast Concrete Utility Building

Section 136000 - Pre-Manufactured Shelter

Section 221100 - Water Distribution Systems

Section 221102 - Curb Valves and Boxes

Section 221103 - Plumbing Appurtenances

Section 221105 - Water Hydrants

Section 221120 - Submersible Well Pumps

Section 221200 - Underground Water Storage Tank

Section 221310 - Sewage Holding Tank

Section 260500 - Common Work Results For Electrical

Section 260519 - Low-Voltage Electrical Power Conductors and Cables

Section 260526 - Grounding and Bonding for Electrical Systems

Section 260533 - Raceway and Boxes for Electrical Systems

Section 260553 - Identification for Electrical Systems

Section 269999 - Other Electrical Tests and Calibrations

Section 311000 - Clearing and Grubbing

Section 312000 - Earthwork

Section 312010 - Select Borrow

Section 312100 - Project Site Preparation and Grading

Section 312225 - Excavation & Embankment

Section 312230 - Rock Blasting

Section 321200 - Hot-Mix Asphalt Paving

Section 321204 - Crushed Aggregate Base or Surface Course

Section 321206 - Loose Rock Riprap

Section 321210 - Rockery Retaining Wall

Section 322100 - Tent Pads

Section 322205 - Barrier Rocks

Section 322622 - Precast Concrete Curb

Section 322640 - Pavement Marking

Section 322716 - Gates for Roads

Section 323150 - Post and Pole Fence

Section 328000 - Irrigation System

Section 329206 - Seeding

Section 329310 - Exterior Plants (Tree Spading)

Section 332100 - Water Supply Wells

Section 332228 - Culvert Pipe and Pipe Arches

END OF SECTION C

February2010

USDA FOREST SERVICE, R-4

SILVER CREEK CAMPGROUND RECONSTRUCTION

SECTION 010250 - CONSTRUCTION STAKING

PART 2 - GENERAL

2.1 SUMMARY

A. This work shall consist of the construction staking of roads, parking lots, parking spurs, family units, group area pads, signs, tent pads, paths, culverts, retaining walls, buildings, and utilities in accordance with the drawings and specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.

2.2 QUALITY CONTROL

A. Construction staking shall be accomplished under the direction of a Civil Engineer, Engineering Technician, or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.

2.3 MEASUREMENT AND PAYMENT

A. Measurement shall be lump sum for surveying and staking the project through all phases of construction.

PART 3 - PRODUCTS

3.1 GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS

A. The Government will provide the Contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include the Northing, Easting, and Elevations for centerline of roads, spurs and parking areas, edge of parking areas, and corners of buildings and other structures.

3.2 STAKES

A. Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:

1. Roads, parking lots, and parking spurs

-Orange

2. Waterlines, utilities, and culverts

-Blue

3. Family Units, group units, stairs, and paths

-Red

4. Buildings, excavation and grading

-Yellow

5. Tent pads

-Blue/White Striped

3.3 SURVEY NOTE PAPER AND BOOKS

A. Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the Contractor.

PART 4 - EXECUTION

4.1 GENERAL

A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.

B. Accuracy requirements:

1. Minimum position close; 1/1000

2. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)

C. Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.

D. Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.

E. Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.

4.2 ESTABLISING AND REFERENCING IMPROVEMENT LOCATIONS

A. Access Roads, Parking Spurs, and Parking lots:

1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.

2. Slope stakes shall be set at maximum 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25 foot intervals around curves having a radius less than 100 feet.

B. Group Units, Family Units and Tent Pads

1. Slope stakes and slope stake references shall be established at the corners. Slope stakes shall be written to reference the finish grade of the unit or pad being staked.

C. Paths and Trails

1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.

2. Slope stakes shall be set at 10-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points.

D. Culverts

1. Slope stakes and slope reference stakes shall be set at all culvert locations. A culvert reference stake and hub shall be set on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. The following shall be recorded on these stakes:

a. The actual field measured length rounded up to an even number

b. The vertical and horizontal distance from hubs to the invert at the ends of the culvert.

E. Waterline, Sewerline, & other Utilities

1. Waterline, Sewerline, & other Utilities shall be staked at the locations shown on the drawings with the specified minimum burial depth. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Centerline reference stakes shall be established as necessary to provide the control for the construction work.

F. Buildings

1. Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control.

4.3 DISCREPANCIES

A. The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of bench marks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.

4.4 VERTICAL CONTROL

A. Control Points are established at the project site. Northing’s, Easting’s and Elevations of control points shall be provided to the Contractor after award.

4.5 MARKING STAKES

A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;

PI

Point of Intersection of tangents

PC

Point of curvature

POC

Point on curve

Pt

Point of tangency

POT

Point on tangent

RP

Reference point

P

P-line (preliminary location line)

L

L-line (final location line)

BM

Bench mark

TBM

Temporary bench mark

BT

Begin taper (any)

ET

End taper (any)

C

Cut

F

Fill

CL

Centerline

D

Ditch

W

Width

4.6 SURVEY NOTES

A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.

B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.

END OF SECTION 010250

APRIL 2006

USDA FOREST SERVICE, R-4

SILVER CREEK CAMPGROUND RECONSTRUCTION

SECTION 011250 - MEASUREMENT AND PAYMENT WITH ASPHALT

PART 5 - GENERAL

5.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

5.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

7. For bituminous material, volumes will be measured at 60(F or will be corrected to the volume at 60(F by using ASTM D1250 for asphalts. Emulsified asphalt will be measured at 60(F, or measured by converting the gallonage at another temperature to gallonage at 60(F by means of the following formula:

Gallons at 60(F = Gallons at A(F

1+0.00025 (A(F - 60(F)

* A(F is the temperature of the material at the time the gallonage is measured.

a. For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when bituminous material has been lost from the vehicle or the distributor, has been wasted, or has otherwise not been incorporated into this work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day at the times the CO directs. Each vehicle shall bear a plainly legible identification mark.

b. When bituminous materials are shipped, net certified weights, or volume corrected for loss of foaming, can be used for computing quantities.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the Contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

5.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

5.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

5.5 PRICE ADJUSTMENT (for Out-of-Specification Bituminous Materials)

A. Bituminous materials are defined as all types and grades of asphalt cement, liquid asphalt, emulsified asphalt, and dust oil.

B. If bituminous material fails one or more test requirements, and the Contracting Officer determines it is in the public interest to accept the material at a reduced price, the price reduction shall be based on the test results giving the largest percent price adjustment. The contractor may remove and replace the defective material or accept the adjustment.

C. The price reduction shall apply to all pay items affected.

D. Price adjustment will be based on samples taken in duplicate in accordance with AASHTO T40 under the supervision of the Contracting Officer. Samples shall be sent to an authorized laboratory. The laboratory shall test one of each duplicate sample and retain the other. When any test result is not within the specification limits, the laboratory shall immediately notify the Contractor, the supplier, and the Contracting Officer. The Contractor, after notifying the Contracting Officer, may check test the retained sample.

E. If the retained sample tests satisfactorily, the material will be accepted. If the retained sample also fails, the following schedule of price adjustments shall apply. The average of test values for the two samples will determine the basis for price adjustment, except when test results on the samples differ by more than the applicable AASHTO or ASTM Repeatability Unit; then, the test result numerically nearest the specification requirement will be used. (A repeatability unit is defined as D2S or D2S% limit for single operator precision described in ASTM C670.)

F. The schedule of price adjustments shall not apply to the following tests:

Test
AASHTO Test Method
Spot Test
T102
Particle Charge
T59
Ductility
T51

G. Bituminous materials failing to meet specifications for these tests shall be removed and replaced.

H. See Table 011250-1 for the schedule of price adjustments for bituminous materials that do not meet specifications.

Table 011250-1

Schedule of Price Adjustments for Out-of-Specification Bituminous Materials.

Application
Deviation from Specification Limit Measured in Reproducibility Units*.
Less than 1
1 but less than 2
2 but less than 3
3 or more
Price reduction applicable to bituminous base course and pavement mixture or to seal coat and bituminous material paid for as a separate item.
0%
5%
25%
Remove & Replace
Price reduction applicable to bituminous material paid for as a separate item.
0%
10%
25%
Remove & Replace

* A reproducibility unit is defined as D2S or D2S% limit for multi-laboratory precision described in ASTM recommended practice C670.

The Sieve Test (AASHTO T59) results may be exempt from the Schedule of Price Adjustments provided the contractor's quality assurance program includes checking the uniformity of bituminous spread rates in increments no greater than 1 foot over the width of the spray bar and variation between increments is no greater than 5 percent.

PART 6 - PRODUCTS (NOT APPLICABLE)

PART 7 - EXECUTION (NOT APPLICABLE)

REVISION HISTORY:

PRIMARY AUTHOR: ???

5/11/2006 D. WEWER – Added 50# Bags to list of units.

END OF SECTION 011250 MAY 2006

USDA FOREST SERVICE, R-4

SILVER CREEK CAMPGROUND RECONSTRUCTION

SECTION 011900 - MOBILIZATION

PART 8 - GENERAL

8.1 SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

8.2 MEASUREMENT AND PAYMENT

A. The measurement shall be lump sum for mobilization. Payment shall be as follows:

1. Bond premiums will be reimbursed after receipt of the evidence of payment.

2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

5. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 9 - PRODUCTS (NOT USED)

PART 10 - EXECUTION (NOT USED)

END OF SECTION 011900

July 2005

USDA FOREST SERVICE, R-4

SILVER CREEK CAMPGROUND RECONSTRUCTION

SECTION 013300 - SUBMITTAL PROCEDURES

PART 11 - GENERAL

11.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

11.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

11.3 MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PART 12 - PRODUCTS

12.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

E. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

12.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

PART 13 - EXECUTION

13.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

EDIT table below for each project. COORDINATE table references with edited specification sections.

13.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:

TABLE 013000-1

Spec. Section
Section Title
Subsection
Required Submittal
C
Section C
1.4A
Traffic Control/Site Closure Plan
010250
Construction Staking
3.6
Survey Notes
014100
Quality Control
1.3 A
Contractor quality control plan
014100
Quality Control
1.3 B
Permits, Licenses, and Certificates
014100
Quality Control
1.3 C
Test and inspection reports
014100
Quality Control
1.3 D
As-Built drawings
023701
Sediment & Erosion Control Measures
1.2A
Sediment & Erosion Control Plan
033000
Cast-in-Place Concrete
1.3A
Product Data
033000
Cast-in-Place Concrete
1.3B
Design Mix
033000
Cast-in-Place Concrete
1.3C
Steel Reinforcement Shop Drawings
033000
Cast-in-Place Concrete
1.3D
Quality Control Test Reports
047000
Manufactured Masonry
1.3A
Product Data, Samples, Qualifications, Instructions
099100
Paint
3.3A
Color Selection Sheets
101110
Bulletin Board
2.1H
Certificate of Compliance
101400
Signs
1.2A
Sign List Submittal
101410
High-Density Polyethylene (HDPE) Signs
1.4A
Sample Sign Mock-Up
101415
High-Density Polyethylene (HDPE) Signs
1.4A
Sample Sign Mock-Up
129400
Family Unit and Site Furnishings
1.2A
Product Data
129410
Group Site and Site Furnishings
1.2A
Product Data
133400
Precast Concrete Utility Building
1.2A
Manufacturer’s Literature
133400
Precast Concrete Utility Building
1.2B
Shop Drawings
133400
Precast Concrete Utility Building
1.2C
Design Calculations
133400
Precast Concrete Utility Building
1.2D
Concrete Delivery Certificate
136000
Pre-Manufactured Shelter
1.2A
Shop Drawings
221100
Water Distribution Systems
1.3A
Product Data
221100
Water Distribution Systems
1.3B
Water Disposal Plan
221100
Water Distribution Systems
1.3C
Bridge Crossing Plan
221100
Water Distribution Systems
1.3D
Operation and Maintenance Data
221103
Plumbing Appurtenances
1.2A
Product Data
221103
Plumbing Appurtenances
1.2B
Operation and Maintenance Data
221105
Water Hydrants
1.3A-B
Manufacturer’s Literature and Maintenance Data
221105
Water Hydrants
1.3C
Washed Rock Certification
221105
Water Hydrants
1.3D
Maintenance Data
221120
Submersible Well Pumps
1.2A
Product Data
221120
Submersible Well Pumps
2.4A
Operation and Maintenance Manual
221200
Underground Water Storage Tank
1.3A
Product Data and Shop Drawings
221200
Underground Water Storage Tank
1.3B
Product Certificate
221200
Underground Water Storage Tank
1.3C
Operation and Maintenance Data
221310
Sewage Holding Tank
1.3A
Product Data
221310
Sewage Holding Tank
1.3B
Shop Drawings
221310
Sewage Holding Tank
1.3C
Coordination Drawings
221310
Sewage Holding Tank
1.3D
Product Certificate
260500
Common Work Results for Electrical
1.2A
Product Data
312000
Earthwork
1.3A
Bedding and Backfill Certification
312000
Earthwork
1.3A
Sieve Analysis
312000
Earthwork
1.3B
Product Data
312010
Select Borrow
1.2A
Source and Gradation
312225
Excavation and Embankment
1.3A
Density Test Results
312225
Excavation and Embankment
1.3C
Blasting Plan
312225
Excavation and Embankment
1.3D
Permits and Licenses
312230
Rock Blasting
1.2
See Specification
321200
Hot-Mix Asphalt Paving
1.2A
Product Data
321200
Hot-Mix Asphalt Paving
1.2B
Job Mix Design
321200
Hot-Mix Asphalt Paving
1.2C
Material Certificate
321204
Crushed Aggregate Base or Surface Course
1.2A
Aggregate Base – Source, Gradation, Material Properties
321204
Crushed Aggregate Base or Surface Course
1.2B
Compaction Test Results and Proctor
321206
Loose Rock Riprap
1.2A
Product Data
322100
Tent Pad Surface Material
2.2A
Aggregate Gradation and Certificate of Compliance
322622
Precast Concrete Curb
2.1B
Certificate of Conformance – Concrete Curb
322640
Pavement Markings
1.3A
Product Data
332100
Water Supply Wells
1.4A
Product Data
332100
Water Supply Wells
1.4B
Project Record Documents
332100
Water Supply Wells
1.4C
Field Quality-Control Reports
332100
Water Supply Wells
1.4D
Operation and Maintenance Data
332100
Water Supply Wells
1.4E
Installation Instructions
332100
Water Supply Wells
1.4F
Water Disposal Plan
332228
Culvert Pipe and Pipe Arches
1.3A
Fabricator’s Certification
332228
Culvert Pipe and Pipe Arches
1.3B
Water Diversion Plan
332228
Culvert Pipe and Pipe Arches
1.4A
Culvert Locations and Lengths

END OF SECTION 013300

APRIL 2009

USDA FOREST SERVICE, R-4

SILVER CREEK CAMPGROUND RECONSTRUCTION

SECTION 014100 - QUALITY CONTROL

PART 14 - GENERAL

14.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

14.2 QUALITY CONTROL

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:

1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

2. Testing agency will re-test and re-inspect corrected work.

C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

14.3 SUBMITTALS

A. Contractor Quality Control Plan

B. Permits, Licenses, and Certificates

C. Test and Inspection Reports

D. As-Built Drawings

14.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 15 - PRODUCTS (Not Applicable)

PART 16 - EXECUTION

16.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

16.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

16.3 TEST AND INSPECTION REPORTS

A. Submit three copies of complete test results no later than three calendar days after the test was performed.

B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

C. Testing and Inspection Reports shall include the following:

SPEC WRITER: REVISE LIST BELOW TO SUIT PROJECT.

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples, tests, or inspections.

5. Names of individuals performing tests and inspections.

6. Reference Specification Section(s).

7. Complete test or inspection data.

8. Test and inspection results and an interpretation of test results.

9. Ambient conditions at time sample was taken, tested, or inspected.

10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

11. Name and signature of laboratory inspector.

12. Recommendations on retesting and reinspecting.

16.4 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

16.5 AS-BUILT DRAWINGS

A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.

16.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS

EDIT table below for each project. COORDINATE table references with edited specification sections.

A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:

TABLE 014100-1

Item
Subsection
Certification or Test Required
Frequency
033000
2.12
Mixing and Delivery
Each Truck
033000
3.12
Concrete – three cylinders, slump, air, temperature
1 composite per truck load delivered
221100
3.2N
HDPE Pipe - Bent Strap Test
Once Daily
221100
3.7A
Hydrostatic Testing of Water System
See Spec.
221100
3.7B
Pressure and Leakage Test – Water Line
See Spec.
221100
3.8A
Bacteriological Examination
After disinfection, before use
221120
3.4A
Mechanical and Electrical Testing (Pump System)
See Spec.
221200
3.11A
Leak Test
Until Passing
221200
3.11B
Air Test
See Spec.
221200
3.11C
Pressure Test
Until Passing
221310
3.4A
Holding Tank Leakage Test
Until Passing
269999
3.1
Other Electrical Tests And Calibrations
See Spec.
312000
3.13C
Compaction Test – at Pipe Zone
One per 750 Feet of Trench at Locations Designated by CO
312000
3.13D
Compaction Test – above Pipe Zone
One per 750 Feet of Trench at Locations Designated by CO
312000
3.13I
Tracer Wire Conductivity Test
Until Passing
312000
3.16A
Compaction Test – Backfill/Fills
One per Tank or Utility Box
312000
3.18B
Compaction Test - Subsurface Drainage Material
One per Tank
312000
3.18C
Compaction Test – Drainage Backfill
One per Tank
312000
3.19C
Moisture-Density Relationship
One for each soil type encountered
312000
3.19C
Compaction Test – Utility Building Slab Area
At subgrade and at each compacted fill and backfill layer
312000
3.19C
Compaction Test – Exterior Concrete Slabs
1 per slab
312225
3.13A
Moisture-Density Relationship
One Test for Each Soil Type Encountered
312225
3.13A
Compaction – Select Borrow/Earth Embankment
One test every 3000 sq. yd. of embankment per lift
312225
3.13B
Compaction – Subgrade
One test every 2000 sq. yd. of subgrade
312230
3.2
Test Blasting
See Spec.
321200
3.9B
Gradation and Asphalt Content
One per 700 tons or Min. of 3 per site
321200
3.9C
Field Density Tests – Asphalt
One test for every 2000 sq. yd. of pavement
321204
3.6A
Gradation
1 per 1000 tons
321204
3.6A
Liquid Limit, Plastic Limit, Fractured Faces
1 per 1000 tons
321204
3.6A
Moisture-Density
1 per type and source of material
321204
3.6A
In-Place Density
1 per 2000 SY and 1 per slab on grade and Utility Building
328000
3.9
Pressure Testing
Until Passing
332100
3.5A
Plumbness and Alignment Test
See Spec.
332100
3.5C
Performance Tests (Multiple)
See Spec.
332100
3.7A
Water Analysis Test
See Spec.
332228
3.7C
Compaction Tests
One test for every two pipes installed at locations directed by the Contracting Officer

END OF SECTION 014100

APRIL 2009

USDA FOREST SERVICE, R-4

SILVER CREEK CAMPGROUND RECONSTRUCTION

SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES

PART 17 - GENERAL

17.1 The work under this section consists of furnishing all necessary labor, equipment, materials, and performing all operations in connection with construction sediment and control measures.

A. General

1. All erosion and sediment control measures are to be placed prior to any disturbance caused by grading and or excavation and shall conform to the requirements of the appropriate regulatory agency for the State.

2. The Contractor shall be solely responsible for ensuring that erosion and sediment control measures are implemented and maintained at the site.

3. Soil disturbing activities include but are not limited to: Clearing and grubbing, excavation for utilities and foundations, roadway and parking lot construction, construction or modification of site drainage, grading, and preparation for final seeding.

17.2 SUBMITTALS

A. The Contractor shall be required to submit a sediment and erosion control plan in accordance with this specification for approval by the Contracting Officer 2 weeks prior to start of work.

B. The Contractor shall be required at a minimum to install silt fencing or straw waddles on the downhill side of construction to ensure sediment does not reach the stream and install sedimats for in stream work (culvert replacements in live streams).

17.3 MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PART 18 - PRODUCTS

18.1 MATERIALS

A. Synthetic Filter Fabric for silt fences:

1. Pervious sheet of polypropylene, nylon, or polyethylene fabric conforming to the following physical and hydraulic characteristics:

Physical Properties (Min.)
Requirement
Test Method
Grab Tensile, lbs.
W120/F100
ASTM-D-4632
Grab Elongation, %
15
ASTM-D-4632
Mullen Burst, psi
275
ASTM-D-3786
Puncture, lbs.
65
ASTM-D-4833
Trapezoidal Tear, lbs.
50
ASTM-D-4533
UV Resistance, %
80
ASTM-D-4355
AOS, US Sieve #
30/40
ASTM-D-4751
Permittivity gal/min-sq. ft.
90
ASTM-D-4491

2. Filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F.

3. Support Posts: 4 foot - 2 x 2 wood.

B. Straw Bales:

1. Oat or wheat straw, free from weeds, viable weed seeds, foreign matter detrimental to plant life, and dry.

a. Grass hay bales are not acceptable.

b. In order to prevent deterioration of the bindings, all bales shall be either wire-bound or string-tied so that bindings are oriented around the sides rather than along the tops and bottoms of the bales.

C. Straw wattles or rolls:

1. Furnish straw wattles or rolls that are manufactured from weed free straw and wrapped in a tubular photodegradable plastic netting made from 85% high density polyethylene, 14% ethyl vinyl acetate and 1% color for UV inhibition. Conform to the following:

a. Diameter

9 inches min.

b. Netting strand thickness

0.030 inches

c. Netting knot thickness

0.055 inches

d. Mass of netting

0.315 to 0.385 ounces per foot

PART 19 - EXECUTION

19.1 CONSTRUCTION

A. Install straw bales at local drainage ways to prevent silt intrusion upon adjacent drainage courses. Remove straw bales following establishment of vegetation cover and utilize as mulch at swales or on steep slopes.

B. Prior to construction, install silt fence or straw waddles/rolls…