SilverCreek_Drawings_Final_Signed_02-19-10.pdf

PDF 18 MB Posted

Attached to
RECOVERY** Silver Creek Campground Construction, Boise NF
Solicitation number
AG-82B1-S-10-0234
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
amend 003 0234(signed).pdf PDF
amend2.0234.pdf PDF
Amendment 001 —
amend01 signed.pdf PDF
Wage Determination.doc DOC document
AG-82B1-S-10-0234.doc DOC document
SilverCreek_Specifications_Final.doc DOC document
J5_fire precautions.doc DOC document
FS ARRA SIGN DETAILS.pdf PDF
AG-82B1-S-10-0234.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X X

X

X

X X

X

X

G1
G2
G3
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
D21
D22
D23
D24
D25
D26
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
E1
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13

File details come from the government source that posted it. Updated .