AMENDMENT NO. 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_Sewage_Lagoons_Solid_Waste_Removal2009.doc | DOC document | |
| EXHIBIT_3_Pictures_and_SpecificationsB.doc | DOC document | |
| Amendment_No1_SewageLagoons_2009.doc | DOC document | |
| RETURN_PACKET_Sewage_Lagoons_Solid_Waste_Removal2009.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
PAGE OF PAGES
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment No. 2 |
| 8/14/09 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| USDA Forest Service |
| SAME |
Apache-Sitgreaves N.F. AQM
PO Box 640 30 S. Chiricahua Drive
Springerville, AZ 85938
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) |
| (() |
| 9A. AMENDMENT OF SOLICITATION NO. |
| FORMDROPDOWN |
AG-8173-S-09-0022
9B. DATE (SEE ITEM 11)
| FORMDROPDOWN |
7/27/09
10A. MODIFICATION OF CONTRACT/ORDER
NO.
| , |
| FORMDROPDOWN |
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
| FORMDROPDOWN |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not ex-tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (() |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON- |
FORMDROPDOWN
TRACT ORDER NO. IN ITEM 10A.
FORMDROPDOWN
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMDROPDOWN
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMDROPDOWN
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return one copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)
| AG-8173-S-09-0022 |
| SEWAGE LAGOONS SOLID WASTE REMOVAL |
.The purpose of Amendment No. 2 is to: . . I. The Closing Date for Offers has been extended August 25, 2009, 4:30 p.m. local time.
II. Incorporate a revised Schedule of Items to replace the original in the RFQ and Return Packet.
(Continued on attached pages).
Except as provided herein, all terms and conditions of this document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| , |
| WARREN L. ABBOTT, Contracting Officer |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C DATE SIGNED |
| BY |
| /s/ Warren Abbott |
8/14/2009
(Signature of person authorized to sign)
(Signature of Contracting Officer)
RFQ AG-8173-S-09-0022
SEWAGE LAGOONS SOLIDS WASTE REMOVAL
AMENDMENT NO. 2
AUGUST 14, 2009
SUBJECT: Significant Points Based on Questions, Concerns, and Discussions During the Lagoon Walk Through 13 August 2009.
1. WOODS CANYON:
a. Upper lagoon can be de-canted into the lower lagoon but must be pumped back into the upper lagoon upon completion of solids removal.
b. FS will install a culvert in the ditch and cover it – or will backfill the ditch for access to the lagoons.
2. CANYON POINT:
Liquids Removal. The forest can, under its general permit, discharge up to 20,000 gallons per day from the lagoon into a fenced area. This fenced area is separate from but adjacent to the lagoon fence. It was created solely for this purpose. It will be possible to begin to discharge liquid days before the work is to begin to remove solids from the lagoon.
3. BIG LAKE:
a. Primary Lagoon can be decanted to lower lagoon – being careful to ensure we don’t breach the lower lagoon. We cannot discharge out of the lower lagoon. Once solids removal from the upper is complete, water will have to be pumped back up to the upper lagoon so we have adequate freeboard on the lower lagoon.
b. Secondary Lagoon: Since this is a polishing or secondary treatment lagoon, the amount of solids in the lagoon is hard to estimate. There should be little solids, or at least a much reduced solids level.
4. GENERAL
a. Quantities in Original Solicitation: I’ve heard from a contractors and consultants that the quantities of solids (in gallons) were understated. Initially, during the walk through yesterday, I said that I realized they were low and to bid on what you estimate to be correct or more realistic values. However, at the end of the day, I decided to revise the quantities in the solicitation. I originally used a very low percentage, something like 2.24% to calculate estimated quantities of solids in the lagoons. I learned that a more appropriate percentage would be between 30 and 40 percent. I revised the quantities using 30%. I chose the lower end of the range because these are seasonal systems, only operated between May and October. Based on the limited operating season, I feel this number is more appropriate.
b. Due date for Bids and the impact of revised quantities. The Closing Date has been extended (see page 1, above). The revised quantities should have little impact on the unit costs. Therefore, contractors should revise their pricing to reflect the increased quantities.
c. Work Periods –
(1) Preferred Performance Periods: The FS prefers to have this work done after the end of the heaviest use by campers, September to the end of October. Generally, visitation falls off after Labor Day. The campgrounds generally close in October; in some cases the concessionaire, Recreation Resource of America, begins to close all or parts of certain campgrounds within the complex before total closure of the campground complex.
(2) The advantage of doing this work during the fall are reduced inflow into the lagoons from campers and hosts, less inflow in infiltration due to rainfall, dry ground conditions.
(3) To do the work in the early spring is not practical. The ground condition is usually saturated, I&I is excessive, the lagoons may not be accessible, and as soon as the campgrounds can be opened, the concessionaire wants to open with little delay.
(4) Winter is generally not possible as the lagoons are not accessible during the winter.
(5) Summer is possible, but if there are major impacts such as having to close the sewer system for extended periods, nobody will want to shut down if it impacts the campgrounds.
So – do the work in the fall.
5. Priorities: Project priorities will be Big Lake Primary, Big Lake Secondary (if needed), Canyon Point, Woods Canyon. If available funding limits completion of all the lagoons, then we will prioritize and award by priority.
III. All other terms and conditions remain the same.
(See attached Revised Schedule of Items)
AMENDMENT NO. 2 REVISED—PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
The Apache-Sitgreaves National Forests has requirement for solid waster removal from a number of lagoons located on or near recreation / campground facilities on the forest. The Government anticipates award of a Firm Fixed-Price contract, which shall constitute the entire agreement including all terms and conditions applicable to the contract. The proposed project includes all work to visit each lagoon for the purpose of measuring the solids; using those measurements to estimate the number of gallons of solids to be removed from each lagoon, propose the removal method and cost per gallon to remove and dispose of the sewage sludge. In addition, this project Includes all work to either remove the solids by mechanical means, transportation and disposal of the sludge at a disposal facility that is certified by Arizona Department of Environmental Quality (ADEQ). Alternatives to removal such as agents or chemicals that reduce the volume of solids may be considered. For the purposes of this solicitation, the terms sludge, solids, and solid waste may be interchanged and have the same meaning.
Based on the estimates of the amount of sludge and the costs per gallon, actual costs may exceed the dollars available for this project. The Government reserves the right to award all line items or any combination of line items with the funding that is available.
B1.0 SCHEDULE OF ITEMS:
| Item No |
| Description |
| Meth. of Meas |
| Unit |
| Est. |
Qty
| Unit Price |
| Total |
| B1.1 |
| Survey Lagoons, Determine Quantities, Removal & Disposal Costs |
| LS |
| LS |
| 1 |
| $________ |
| $__________ |
| B2.1 |
| Big Lake Primary Lagoon Solids Removal or Reduction |
| AQ |
| Gal |
| 302,258 |
| $________ |
| $__________ |
| B3.1 |
| Big Lake Secondary Lagoon Solids Removal or Reduction |
| AQ |
| Gal |
| 398,840 |
| $________ |
| $__________ |
| B4.1 |
| Woods Canyon Primary Lagoon Solids Removal or Reduction |
| AQ |
| Gal |
| 47,811 |
| $________ |
| $__________ |
| B5.1 |
| Canyon Point Lagoon Solids Removal or Reduction |
| AQ |
| Gal |
| 293,378 |
| $________ |
| $__________ |
| B6.1 |
| Mobilization: One-way, one time to begin project |
| LSQ |
| LSQ |
| 1 |
| $________ |
| $__________ |
TOTAL FOR ALL ITEMS, B1.1 – B6.1 =======================(
NOTE: The quantities shown in the original Schedule of Items were reflected solids as 2.24% of the total volume of the lagoon. These quantities reflect an increase the estimated solids from 2.24% to 30% of the total volume of the lagoon.
LAGOON VOLUMES TABLE
| System Name |
| Lagoon Volume (CF) |
| Lagoon Volume (Gal) |
| Solids As a % of Total Volume (Gal) |
30%
| Big Lake Primary |
| 134,700 |
| 1,007,525 |
| 302,258 |
| Big Lake Secondary |
| 177,376 |
| 1,329,465 |
| 398,840 |
| Canyon Point |
| 130,730 |
| 977,928 |
| 293,378 |
| Woods Canyon |
| 21,306 |
| 159,369 |
| 47,811 |
1,042,286