Amendment_No1_SewageLagoons_2009.doc

DOC document 91 KB Posted

Attached to
SEWAGE LAGOONS SOLID WASTE REMOVAL
Solicitation number
AG-8173-S-09-0022
Issued by

About this file

AMENDMENT NO. 1

View the file

Other files

File Type Posted
Amendment_No2_SewageLagoons_2009.doc DOC document
RFQ_Sewage_Lagoons_Solid_Waste_Removal2009.doc DOC document
EXHIBIT_3_Pictures_and_SpecificationsB.doc DOC document
RETURN_PACKET_Sewage_Lagoons_Solid_Waste_Removal2009.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment No. 1
7/30/09
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
USDA Forest Service
SAME

Apache-Sitgreaves N.F. AQM

PO Box 640 30 S. Chiricahua Drive

Springerville, AZ 85938

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(()
9A. AMENDMENT OF SOLICITATION NO.
FORMDROPDOWN

AG-8173-S-09-0022

9B. DATE (SEE ITEM 11)

FORMDROPDOWN

7/27/09

10A. MODIFICATION OF CONTRACT/ORDER

NO.

,
FORMDROPDOWN

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE
FORMDROPDOWN

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON-

FORMDROPDOWN

TRACT ORDER NO. IN ITEM 10A.

FORMDROPDOWN

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMDROPDOWN

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMDROPDOWN

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return one copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)

AG-8173-S-09-0022
SEWAGE LAGOONS SOLID WASTE REMOVAL

.The purpose of Amendment No. 1 is to: . . I. The Closing Date for Offers remains August 20,, 2009, 4:30 p.m. local time.

II. Incorporate the minutes of Pre-Quotation meeting held July 30, 2009, 9:00 a.m.

. III. Incorporate a revised Schedule of Items to replace the original in the RFQ and Return Packet.

(Continued on attached pages).

Except as provided herein, all terms and conditions of this document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
,
WARREN L. ABBOTT, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C DATE SIGNED
BY
/s/ Warren Abbott

7/30/2009

(Signature of person authorized to sign)

(Signature of Contracting Officer)

RFQ AG-8173-S-09-0022

SEWAGE LAGOONS SOLIDS WASTE REMOVAL

AMENDMENT NO. 1

JULY 30, 2009

Minutes from Pre-Quotation Meeting:

Date: July 30, 2009

9:00 a.m.

Supervisor’s Office Main Conference Room

Attendance:

For the Government -- Jim Morrison, Facilities Engineer (928-333-6273); Anne Weiskircher, Contract Specialist; Warren Abbott, Contacting Officer

Contractors -- Jeff McReynolds, G & G Builders, (520-620-6049); Brad Vandersee, Red J Environmental, (480-557-7371)

Introductions were made, and the Contracting Officer covered the administrative portion of the RFQ’s and how to respond with an offer.

Specifications were discussed by Jim Morrison, Facilities Engineer, concerning the scope of work and what the Government expects the outcome of these projects to achieve.

Contractors desired to take a look at the Lagoons, a site visit is being coordinated by Jim Morrison. Prospective date will picked from August 3, 4, 5, 10-14. Actual starting location will be determined by Jim Morrison. Contact Jim Morrison (928-333-6273) for actual date and location.

All other terms and conditions remain the same.

(See attached Revised Schedule of Items)

REVISED—PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

The Apache-Sitgreaves National Forests has requirement for solid waster removal from a number of lagoons located on or near recreation / campground facilities on the forest. The Government anticipates award of a Firm Fixed-Price contract, which shall constitute the entire agreement including all terms and conditions applicable to the contract. The proposed project includes all work to visit each lagoon for the purpose of measuring the solids; using those measurements to estimate the number of gallons of solids to be removed from each lagoon, propose the removal method and cost per gallon to remove and dispose of the sewage sludge. In addition, this project Includes all work to either remove the solids by mechanical means, transportation and disposal of the sludge at a disposal facility that is certified by Arizona Department of Environmental Quality (ADEQ). Alternatives to removal such as agents or chemicals that reduce the volume of solids may be considered. For the purposes of this solicitation, the terms sludge, solids, and solid waste may be interchanged and have the same meaning.

Based on the estimates of the amount of sludge and the costs per gallon, actual costs may exceed the dollars available for this project. The Government reserves the right to award all line items or any combination of line items with the funding that is available.

B1.0 SCHEDULE OF ITEMS:

Item No
Description
Meth. of Meas
Unit
Est.

Qty

Unit Price
Total
B1.1
Survey Lagoons, Determine Quantities, Removal & Disposal Costs
LS
LS
1
$________
$__________
B2.1
Big Lake Primary Lagoon Solids Removal or Reduction
AQ
Gal
22,612
$________
$__________
B3.1
Big Lake Secondary Lagoon Solids Removal or Reduction
AQ
Gal
29,837
$________
$__________
B4.1
Woods Canyon Primary Lagoon Solids Removal or Reduction
AQ
Gal
3,577
$________
$__________
B5.1
Canyon Point Lagoon Solids Removal or Reduction
AQ
Gal
21,948
$________
$__________
B6.1
Mobilization: One-way, one time to begin project
LSQ
LSQ
1
$________
$__________

TOTAL FOR ALL ITEMS, B1.1 – B6.1 =======================(

PRE-QUOTATION MEETING

DATE:

JULY 30, 2009

TIME:

9:00 A.M. (MST)

LOCATION:

APACHE-SITGREAVES NATIONAL FOREST HEADQUARTERS

SUPERVISOR’S OFFICE

30 S. CHIRICAHUA DRIVE

SPRINGERVILLE, AZ 85938

TECHNICAL OR SPECIFICATION QUESTIONS, CONTACT THE COR,

JIM MORRISON, 928-333-6372

File details come from the government source that posted it. Updated .