Roby_Project_Specifications.docx
DOCX document 26 KB Posted
- Attached to
- Building Demolitions Mark Twain National Forest
- Solicitation number
- AG-64R4-S-16-0026JS
About this file
Specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-64R4-S-16-0026_0001_Cottoner_and_Roby_Demolitions.pdf | ||
| Roby_Dwelling_and_Cottoner_Radio_Building_Demolition_Solicitation_Questions.docx | DOCX document | |
| Cottoner_Attachment_C.docx | DOCX document | |
| Cottoner_Project_Specifications.docx | DOCX document | |
| Wage_Determination_1996-0223.pdf | ||
| Attachment_B_Roby_Lead_Risk_Assessment.pdf | ||
| Cottoner_Attachment_A.pdf | ||
| Technical_and_Green_Plan_Forms.rtf | RTF text file | |
| Attachment_A_ROBY_ASBESTOS_REPORT.pdf | ||
| Cottoner_Attachment_A_1_Asbestos_Inspection_Report_Ann.pdf | ||
| Cottoner_Radio_Building_Location_Map.docx | DOCX document | |
| AG-64R4-S-16-0026_Cottoner_and_Roby_Demolitions.pdf | ||
| Roby_Location_Map.docx | DOCX document | |
| Cottoner_Attachment_B.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copyright 2015 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 011000 - SUMMARY
PART 1 - GENERAL
| 1.1 | PROJECT INFORMATION |
| A. | Project Identification: Roby Dwelling and Garage Demolition/Removal. |
| 1. | Project Location: Roby Lookout Tower Site, Roby, MO (T33 N, R11W, Section 27). From Houston MO travel Northwest on State Highway 17 approximately 23 miles. Project is located on the right, at the Roby Lookout Tower site. |
| B. | Owner: USDA Forest Service, Mark Twain National Forest, 401 Fairgrounds Road, Rolla, MO 65401. |
Retain "Architect's Consultants" Paragraph below if providing contact information for Architect's consultants for Project use.
Copy and re-edit subparagraph below for each consultant. Coordinate with requirement in Section 012000 "Price and Payment Procedures" to arrange schedule of values data by design consultant contracts for purposes of delineating the scopes of multiple certifications of payments.
Retain "Design-Builder" Paragraph below for design-build projects.
Retain "Project Website" Paragraph below if Project uses a project website, project extranet, or FTP site for information and document management.
| C. | The Work consists of demolishing and removing the Roby Dwelling and Roby Small Garage from the Houston/Rolla/Cedar Creek Ranger District, on the Mark Twain National Forest. Removal of the buildings shall include all attached structures, existing rubbish and trash and contents in and adjacent to the buildings as follows: |
| 1. | Roby Dwelling: Demolish the Roby Dwelling down to the basement walls. The basement floor shall be punctured at three (3) equal intervals through to the subsoil to facilitate drainage of water infiltration, backfilled with specified fill material, covered with 6” of top soil and seeded. The Roby Dwelling is approximately 20’ x 30’ with an additional 14.5’ x 16’ back room and a 10’ x 6’ porch. The Roby Dwelling basement is approximately 12’ x 18’ with approximate 10’ high walls. The small radio tower adjacent to the Roby Dwelling is included in the items to be removed. The tower is approximately 25’ high. Contractor is responsible to confirm actual building and tower dimensions. |
| 2. | Roby Small Garage: Demolish the Roby Small Garage down to the concrete floor slab. The concrete floor slab shall remain. The Roby Small Garage is approximately 12.5’ x 24’. Contractor is responsible to confirm actual building dimensions. |
All demolished materials shall be removed from government property.
D. Owner-Furnished Products: There are no Government-Furnished products on this contract.
In a list below, include items of work shown on Drawings but not included in the Contract, and any other work that will be performed at the same time as construction or that may require coordination with construction. Copy and re-edit subparagraph for each separate contract. See Evaluations.
| 1.2 | WORK RESTRICTIONS |
| A. | Contractor's Use of Premises: During demolition, Contractor will have limited use of site indicated. Contractor's use of premises is limited only by Owner's right to perform work or employ other contractors on portions of Project and as follows: |
First subparagraph below contains an example of limitations on Contractor's use of premises; delete if not applicable. Insert other descriptions of areas or types of limited use, requirements for cooperation with Owner's personnel, noninterference with Owner's or public use, and other necessary restrictions if required.
1. Owner will occupy premises during construction. Perform construction only during normal working hours (8 AM to 5 PM Monday thru Friday, other than holidays), unless otherwise agreed to in advance by Owner. Clean up work areas and return to usable condition at the end of each work period.
First "Limits" Subparagraph below is based on requirements of LEED 2009 NC Credit SS 5.1. See Evaluations.
2. Limits: Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet beyond building perimeter.
Retain "Limits" Subparagraph below for greenfield sites if reduced site disturbance is required for IgCC.
"Driveways, Walkways, and Entrances" Subparagraph below is an example of a special requirement appropriate to many projects. Revise to suit Project or delete.
| 3. | Driveways, Walkways, and Entrances: Keep driveways, parking garage, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. |
| B. | Nonsmoking Building: Smoking is not permitted within 25 feet of the buildings on site. |
| 1.3 | CONTRACT TIME |
| A. | Contract time shall be 15 Calendar Days. |
| 1.4 | SCHEDULE |
| A. | Within 10 days after issuance of the Notice to Proceed the contractor shall submit a plan and schedule for removal of any designated improvements or material on the parcel. The work shall be performed in accordance with the approved plan and schedule. Work shall begin within 10 contract days from the Notice to Proceed. |
| 1.5 | CERTIFICATIONS |
| A. | Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in asbestos and lead materials removal. All work with asbestos containing materials (ACM) and lead materials shall be performed with, and under the supervision of, skilled and experienced contractors directly employed by the Contractor and certified in accordance with national and state standards. Contractor employees shall have the minimum hours of required training in asbestos and lead by a person certified with the State of Missouri. Proof of certification for each employee shall be submitted to the COR prior to the start of work. |
| 1.6 | NOTIFICATIONS AND FEES |
| A. | Contractor is responsible for providing all required notifications concerning the removal and disposal of ACM, lead and mold per Local, State and Federal regulations having jurisdiction and for the payment of any required fees. |
| 1.7 | MEASUREMENT AND PAYMENT |
| A. | Measurement for removal of the buildings and appurtenances will be considered a Lump Sum (LS) unit. |
| 1.8 | BASIS OF PAYMENT |
| A. | The accepted removal of improvements will be paid at the contract Lump Sum (LS) price per Units of Measure (Job). |
PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
ROBY DWELLING AND SMALL GARAGE DEMOLITION/REMOVAL
Copyright 2013 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
| 1.1 | SECTION REQUIREMENTS |
| A. | Items indicated to be removed and salvaged remain Owner's property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse. Include fasteners or brackets needed for reattachment elsewhere. |
| B. | Pre-demolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins. |
| C. | Post-Demolition Photographs: Contractor shall submit photographs showing the condition of the existing sites after demolition of the buildings and site cleanup. |
Retain, revise, or delete first paragraph below to suit Project. Insert other limitations if necessary, such as when adjacent floors will be occupied.
| D. | Owner will occupy portions of the site immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted. |
| E. | Asbestos/Lead/Mold: |
| 1. | The Roby Dwelling and Small Garage have been tested for Asbestos Containing Materials (ACM), Lead Paint and Mold. Inspection and Assessment Reports are attached for reference. |
| a. | Asbestos (See Asbestos Inspection Report, Attachment A): |
| 1) | Roby Dwelling: The drywall joint compound was tested and determined to contain asbestos. The attic chimney thermal wrap was assumed to be ACM. The ACM materials are considered FRIABLE. |
| 2) | Roby Small Garage: No suspect ACM materials were noted. |
| b. | Lead Paint (See Lead Risk Assessment Report, Attachment B): |
| 1) | Roby Dwelling: The Roby Dwelling has tested positive for Lead Paint. |
| 2) | Roby Small Garage: The Roby Small Garage has tested positive for Lead Paint. |
| c. | Mold (Mold and Indoor Air Quality Assessment Report will be provide upon request): |
| 1) | Roby Dwelling: The Roby Dwelling has tested positive for mold. Proper protective equipment shall be worn when entering the dwelling. |
| 2) | Roby Small Garage: The Roby Small Garage was not tested for mold. |
| 2. | All materials shall be removed in accordance with Missouri Department of Natural Resources (MDNR) regulations and any other agency having jurisdiction. If the contractor encounters suspect ACM not previously identified, the contractor shall stop work and immediately notify the Contracting Officer’s Representative (COR) so the Forest Service can have the suspect material sampled and tested. |
| 3. | Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in asbestos and lead removal. All work with asbestos and lead containing materials shall be performed with, and under the supervision of, skilled and experienced asbestos and lead contractors directly employed by the Contractor, and certified in accordance with national and state standards. Contractor employees shall have the minimum hours of required training in asbestos and lead by a person certified with the State of Missouri. Proof of certification for each employee shall be submitted to the COR prior to the start of work. |
| F. | Hazardous Material: The contractor may encounter small quantities of hazardous material as defined by the Missouri Department of Natural Resources (MDNR). This material shall be recycled or disposed of in a manner that maintains the material’s qualifications as “small quantities” in accordance with MDNR regulations. In the event the contractor encounters what is reasonably suspected to be large quantities of hazardous matter, the contractor shall immediately cease work and notify the COR. If the Forest Service determines the suspect material is not hazardous or does not constitute a large quantity of hazardous material the contractor will be notified to continue the work. |
PART 2 - PRODUCTS
| 2.1 | PEFORMANCE REQUIREMENTS |
| A. | Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction. |
| B. | Standards: Comply with ANSI/ASSE A10.6 and NFPA 241. |
| 2.2 | SOIL MATERIALS |
| A. | Top Soil: ASTM D 2487 Soil Classification Groups GW, GP, GM, SW, SP, and SM; free of rock or gravel larger than 3 inches in any dimension, debris, waste, frozen materials, vegetation, or other deleterious matter or an approved equal. |
| B. | Backfill and Fill: Ground rock, no clay, maximum size 2 inches. Possible source is Doss & Harper Stone Co., Houston, MO (417-967-4167). |
| 2.3 | SEED AND MULCH |
| A. | Seed: 50 percent Kentucky Bluegrass, 25 percent perennial rye, 25 percent fescue or an approved substitution. |
| B. | Mulch: Straw mulch. Clean, mildew-and seed-free hay or straw of wheat, rye, oats, or barley. |
Terms, descriptions, and gradations of granular soil materials in "Subbase Material," "Bedding Course," "Drainage Course," and "Impervious Fill" paragraphs below are examples only. Revise to comply with local practices and to suit Project. For example, granular materials may be referenced by state or local highway designations rather than by ASTM classifications.
PART 3 - EXECUTION
| 3.1 | DEMOLITION |
| A. | Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building/site. |
| B. | Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished. Contractor shall contact Dig Rite prior to work. |
Retain "Refrigerant" Paragraph below if selective demolition includes mechanical equipment containing refrigerant. Refrigerant may be part of equipment such as air-conditioning units, chillers, refrigerators, freezers, icemakers, heat pumps, dehumidifiers, and drinking water coolers.
| C. | Refrigerant: Remove refrigerant from mechanical equipment to be selectively demolished according to 40 CFR 82 and regulations of authorities having jurisdiction. |
| D. | Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. |
| E. | Protect walls, ceilings, floors, and other existing finish work that are to remain. |
| F. | Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished. |
| G. | Removal of buildings shall include all attached structures. Under no circumstances shall the contractor burn, grind, pulverize or otherwise reduce any portion of the building into fine particles. The contractor shall remove all components of the buildings unless otherwise specified. All existing wood and other material attached to concrete and masonry construction shall be removed. |
| H. | Requirements for Building Reuse: |
| 1. | Maintain existing building structure (basement walls and floor) not indicated to be demolished; do not demolish such existing construction beyond indicated limits. |
| 2. | Protect cistern adjacent to dwelling from damage. |
| I. | Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. |
| J. | Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials. |
| K. | Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began. |
| L. | Seed and mulch any areas disturbed by the demolition operations. Seed and mulch shall be considered incidental to the work. |
| 3.2 | BASEMENT BACKFILL |
| A. | Basement shall be free from any demolition debris, trash or other waste prior to placement of any backfill material. |
| B. | Puncture basement floor, a minimum 6 inch diameter hole, through to sub surface, in three (3) equally spaced intervals to facilitate drainage of any water infiltration. |
| C. | Place and spread fill material evenly over basement in maximum 12 inch layers to prevent voids. |
| D. | Place and evenly grade fill material to approximately 6 inches above basement wall height. |
| E. | Place and evenly grade 6 inches of top soil material over fill material and slope to drain away from basement. |
| F. | Seed and mulch over top soil. Evenly distribute seed by sowing with spreader or seeding machine in two directions at right angles to each other. Rake seed lightly into top 1/8 inch of topsoil and water with fine spray. Protect seeded areas by spreading straw mulch with 1-1/2 inches thickness. Seed and mulch shall be considered incidental to the work. |
END OF SECTION 024119