quote_document_and_clauses_revised_AMC.docx

DOCX document 116 KB Posted

Attached to
Lost Lake Embankment Mitigation
Solicitation number
AG-52B1-S-16-0060
Issued by

About this file

solicitation

View the file

Other files

File Type Posted
Amend_2_information.docx DOCX document
amendment_A0002.doc DOC document
Lost_Lake_Pre.docx DOCX document
amendment_A0001.doc DOC document
2.03_Lost_Lake_1-2250_aerial.pdf PDF
2.02_Lost_Lake_Slump_Repair_2016_Final.pdf PDF
P550_5.13.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

PAGE OF PAGES

(THIS IS NOT AN ORDER)
THIS RFQ
|X|
IS
|_|
IS NOT A SMALL BUSINESS SET- ASIDE
1
52
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
AG-52B1-S-16-0060
8/1/16
UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY Hoosier National Forest 811 Constitution Ave Bedford, IN 47421

6. DELIVER BY (Date)

See Section F

5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
|_|
FOB DESTINATION
NAME
TELEPHONE NUMBER
|_|
OTHER (See Schedule)
Roger Manning
AREA CODE
NUMBER
9. DESTINATION
812
275-5987
a. NAME OF CONSIGNEE
8. TO:
Mark Twain NF
a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
Rolla
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
MO
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the
9/1/16, 11:00a.m. e.s.t.
submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a)
(b)
(c)
(d)
(e)
(f)
Lost Lake Embankment Mitigation

Estimated Price range is $50,000 - $100,000

Email quotes to: rkmanning@fs.fed.us
No faxes. Reference “Request No “on outer mailing envelope.
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

NUMBER
PERCENTAGE
NOTE: Additional provisions and representations
|X|
are
|_|
are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121
STANDARD FORM 18 (Rev. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

TIN#_________________ DUNS#_________________

Email:______________________ Phone__________________ Fax____________

Are you registered in SAM (www.sam.gov)?_____

SCHEDULE OF ITEMS

LOST LAKE EMBANKMENT MITIGATION

MARK TWAIN NATIONAL FOREST

BASE ITEM

Line Item
Title
Unit
Total Price
1
Mobilization; clearing/grubbing; excavation; temporary erosion control
Lump Sum
$

OPTIONAL ITEMS

Line Item
Title
Unit
Total Price
1
Aggregate for roadbed
Lump Sum
$
2
Aggregate for turn-arounds
Lump sum
$
3
Permanent erosion control and seed/straw, including installation of Turf Reinforcement Mat and Rolled Erosion Control Mats.
Lump sum
$

Project Total Cost……………………………………………………$ ______________

Base Item: Consists of excavation of embankment, as depicted in the drawings, and placement of the material on the nearby fill areas including a roadbed, erosion control, and application of seed/straw.

Optional Item 1: Apply two inches (loose) of 2” minus aggregate on finished roadbed.

Optional Item 2: Apply two inches (loose) of 2” minus aggregate on two turn-arounds.

Optional Item 3: Apply government furnished seed, contractor furnished weed-free straw to disturbed areas, in spring 2017. Apply various erosion control mats to spillway area as depicted in drawings and specifications.

Performance period: 60 days from Contract Award.

Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _______________________________________________________________.

NOTES:

a. Contractor must be registered www.sam.gov to be considered. THIS IS A FREE REGISTRATION.

b. A pre-quote meeting is cheduled for Aug. 10 at 10:00a.m. local time at the project location.

c. Award will be made to one contractor. You must submit pricing for all items.

SECTION C - SPECIFICATIONS/STATEMENT OF WORK

SPECIFICATIONS

Division
Section Title

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00
SUMMARY
01 30 00
ADMINISTRATIVE REQUIREMENTS
01 42 00
REFERENCES

DIVISION 31 - EARTHWORK

31 00 00
SOIL EROSION & WATER POLLUTION CONTROL
31 10 00
SITE CLEARING
31 20 00
EARTH MOVING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 00
TURF AND GRASSES

DRAWINGS

SHEET 01 – EMBANKMENT PROFILE

SHEET 02 – EXISTING CONDITION PHOTOS

SHEET 03 – SITE LAYOUT AND PROJECT BOUNDARIES

SHEET 04 – EMBANKMENT CONSTRUCTION DETAILS

SHEET 05 – ROADWAY DETAILS

SHEET 06 – EROSION CONTROL DETAILS

OTHER ATTACHMENTS

LOST LAKE AERIAL PHOTO

LOST LAKE MAP

TURF REINFORCEMENT MAT SPECIFICATIONS – P550

SECTION 01 10 00 – SUMMARY

PART 1 - GENERAL

1.1PROJECT INFORMATION
A.Project Identification: Lost Lake Embankment Mitigation
B.Owner: U.S. Forest Service, Salem Ranger District
C.Project Location:
1.37°43'33.7"N91°14'31.9"W
2.Forest Service Road 2741, Davisville, MO, Crawford County, Salem Ranger District
3.From the Dillard Mill Road (Dillard Mill State Historic Site), turn left (north) on Hwy 49. Make the first left on the unnamed gravel road (labeled as Crooked Tower Road on GoogleMaps). Travel three miles to Forest Road 2741 (the first left after CR 804). Take FR 2741 approximately two miles, to the lake. Map is provided in appendices.
D.Period of Performance: The period of performance shall be no more than 60 days upon issuance of the notice to proceed.
E.Engineer: Amy M. Crews, P.E., (573) 341-7438, amymcrews@fs.fed.us
F.Government Furnished Products, Work by Owner and Under Separate Contracts: Seed and Straw (optional item).
G.Contractor Furnished Products: The Contractor shall furnish all equipment, materials, supplies, and services that are not specified herein as Government-furnished, which are necessary to comply with the requirements of this contract. Ancillary work items not listed below, though necessary to attain the completed project, shall be included in the contract.
1.2SCOPE OF WORK
A.The purpose of this contract is to mitigate a railroad embankment to alleviate safety hazards. The culverts that allowed the James Branch to pass through the railroad embankment failed, causing the water level to rise and the embankment to partially fail. Then end result is to construct an emergency spillway with specified slopes and dimensions to alleviate this safety hazard.
B.The trees that are removed can be laid in place, or other means at the contractor’s discretion. A 150 foot long construction free vegetated buffer area will be in place at the water edge. Trees will be used as a windrow buffer strip approximately 150 feet away from the water. Location of windrow buffer strip will be flagged by government.
C.The soil from this emergency spillway construction will be placed in two different areas on site.
1.The first fill area is directly adjacent to the existing embankment. Care should be used to track in this area in lifts and provide enough compaction for construction loads.
2.The second area starts at 5+50 and continues to approximately15+00 along the entrenched portion of FR 2741. Stations are approximated. This portion of fill should not exceed 6 foot compacted depth and must be compacted sufficiently for roadway loads, or until there is no visual displacement.
D.The Contractor shall furnish all personnel, equipment, supplies, transportation, tools, materials, supervision, certifications and environmental permits/documentation necessary to provide for the work summarized as follows:
1.Erosion Control;
2.Site Clearing;
3.Earth Work;
4.Slope Stabilization.
1.3WORK RESTRICTIONS
A.Contractor's Use of Premises: During construction, Contractor will have unlimited use of space indicated, however the work to be done must be strictly confined to the areas delineated.

END OF SECTION 01 10 00

SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS

1.1PROJECT MANAGEMENT AND COORDINATION
A.Schedule: Contractor shall notify the COR of schedule for completion of work at the beginning of the project, and keep the COR or Government Inspector informed of when Contractor will be on-site. Contractor shall update the COR on progress weekly via e-mail or other approved means.
1.Contractor shall insure that work is complete as scheduled and is uninterrupted by employee stoppages.
2.Contractor shall take all precautions to avoid delays, and adhere to schedule.
3.Hours of Operation: There are no hours of operation limits for this contract.
B.Government Personnel:
1.Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the CO and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
2.Inspector: An individual appointed to make observations for the CO/COR. This person cannot direct work, or authorize changes to the contract, but instead has the goal of observing the work to be done so that the quality assurance objectives of the government are achieved.
3.Designated Official: The Contractor shall provide a designated official who shall be responsible for the performance of the work. The designated official shall conduct overall management coordination and shall be the central point of contact with the Government for performance of all work under this contract. The name of this person and an alternate who shall act for the Contractor when the designated official is absent shall be designated in writing to the contracting officer no later than the post award orientation. The designated official or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
a.The designated official shall be authorized to receive any notices of deficiency in contract performance. The notices may include, but not be limited to, the following: non-performance of work, deficiencies in work performed and notices of proposed payment deductions for performance issues (Reference TE-4 PRS).
b.Contact info must be provided for designated official, or alternate, including phone number and/or e-mail.
1.2FINAL INSPECTION
A.Submit an e-mail request for final inspection for acceptance to the COR. On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements. Engineer will prepare final Certificate for Payment after inspection or will advise Contractor of items that must be completed or corrected before certificate will be issued.
1.3SUBMITTALS
A.Prepare and submit submittals required by individual Specification Sections.
B.Submit complete submittal package, either hard copy or digital.
C.Label each submittal for identification with the following Name, phone and e-mail address of Contractor, number and title of appropriate Specification Section.
D.Highlight applicable product information. Include the manufacturer's recommendations, product specifications, and installation instructions.
E.Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced.
F.Engineer will review each submittal, make marks to indicate corrections or modifications required, and will notify the Contractor of the reasons for submittal decline.
G.Submittals must be approved prior to work beginning.
1.4ADMINISTRATIVE REQUIREMENTS
A.Special Qualifications: Contractor personnel shall demonstrate experience commensurate with work to be done.
B.Field Measurements: The Contractor shall verify all measurements and quantities at the project(s) site and shall be responsible for all dimensions and layout of all materials installed.
C.Reporting and Recordkeeping Requirements:
1.The Contractor shall maintain detailed, complete and accurate billing records, supplier invoices, written quotations, parts and materials receipts, and any other financial data necessary to document compliance with this contract and make these records available for examination by the Contracting Officer when requested
2.Records shall be kept of identified deficiencies and the corrective action taken to correct them. Short term remedial actions and long term solutions shall be described in the corrective action report. All inspection documents shall be made available to the Government upon request.
D.Permits, Licenses, and Fees: The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local laws, rules, and regulations pertaining to Work practices, protection of Workers, and authorized visitors to the site.
E.Safety & Worksite Housekeeping: The Contractor shall take all precautions to maintain the work site at all times, in a condition that will prevent damage or injury to person or property, both Government or otherwise. The Contractor shall protect all personnel, whether government or civilian, from any and all safety hazards on job sites during progress of work on this contract. All worksites shall be kept free of litter or other debris at all times, and upon completion of work all residual materials shall be removed from the site and the area left clean. All debris will be lawfully disposed of off-site.
1.Worker safety and environmental protection practices shall comply with current, applicable local and Installation policies, laws, rules, regulations, ordinances, and the applicable requirements of the Missouri Department of Natural Resources (MDNR), the Occupational Safety and Health Administration (OSHA), and the U.S. Environmental Protection Agency (EPA).
2.The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall remove from the job site any employee for reasons of misconduct or security.
3.Contractor may choose to close Forest Road 2741 using signs (MUTCD).
F.Payments and Pricing: Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown equitable adjustments that are deemed fair and reasonable by the CO, shall be applied if necessary. Contractor shall pay Davis-Bacon prevailing wages (enclosed for Crawford County) for all work performed on site.
G.Quality Assurance / Quality Control:
1.Quality Assurance: The Government reserves the right to perform inspections and tests as and when it deems necessary to ascertain that contractual requirements are being fulfilled. The Government Inspector may observe and/or ask for explanation of work performed. The intent is not to delay the Contractor.
a.Communications: The Contractor shall provide a telephone number that will allow the Government to contact them during working hours as needed.
b.Identification of deficiencies: The Contractor shall not rely on Government direction in correcting discovered deficiencies, but shall identify and correct problem areas on his own.
H.Contractor Personnel Conduct: The Contractor is required to conduct business in a professional and customer service oriented manner, with due regard for the safety and convenience of the site occupants and visitors. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance.

END OF SECTION 01 30 00

SECTION 01 42 00 – REFERENCES, DEFINITIONS AND ACRONYMS

PART 1 - GENERAL

1.1REFERENCES
1.2DEFINITIONS
A.Consumable Materials. Items used in the routine maintenance and repair of equipment but not considered a specific part for a specific piece of equipment. Examples of consumable materials are bulk items such as grease, oil, lubricants, wire connectors, screws, nuts or other items that are normally considered consumable in commercial maintenance and/or repair function.
B.Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
C.Contracting Officer (CO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
D.Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the CO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
E.Excess Excavation. Material from the roadway in excess of that needed for construction of designed roadways.
F.Forest Service. The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
G.Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or other Federal agencies. Inspector. The Government-authorized representative designated in writing by the Contracting Officer, Contracting Officer’s Representative, or Engineering Representative responsible for detailed inspection. Invert. The lowest point of the internal cross section of culvert or pipe arch.
H.Inspector: An individual appointed to make observations for the CO/COR. This person cannot direct work, or authorize changes to the contract, but instead has the goal of observing the work to be done so that the quality assurance objectives of the government are achieved.
I.Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to items that cannot be found after a reasonable search, theft, damage resulting in unexpected harm to property requiring repair to restore the item to usable condition, or destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.
J.Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
K.Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
L.Real Property. See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).
M.Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
N.Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
O.Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of, or that can be used only in certain locations or for limited purposes.
1.3ABBREVIATIONS AND ACRONYMS
CFRCode of Federal Regulations
CORContracting Officer Representative
GFPGovernment Furnished Property
FARFederal Acquisition Regulation
KOContracting Officer
PWSPerformance Work Statement
QAQuality Assurance
QCQuality Control
USDAUnited States Department of Agriculture
USFSUnited States Forest Service

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

END OF SECTION 01 42 00

SECTION 31 00 00 - SOIL EROSION & WATER POLLUTION CONTROL

1.1PRODUCT SUBMITTALS
A.Rolled Erosion Control Mat
B.Turf Reinforcement Mat
1.2PRODUCTS
A.Temporary Controls
1.Silt Fence
2.Straw Bales
B.Permanent Controls: Products shall be as specified below, or an approved equal.
1.Rolled Erosion Control Mat
a.Biodegradable, coconut and fiber, 4’x100’ rolls, sold by ASP Enterprises, or approved equal, as approved by COR

314-630-9805 Cell 314-343-4357 Office 1099 Cassens Industrial Ct Fenton, MO 63026 mstirnaman@aspent.com www.aspent.com

2.Turf Reinforcement Mat
a.P550, sold by ASP Enterprises, or approved equal

314-630-9805 Cell 314-343-4357 Office 1099 Cassens Industrial Ct Fenton, MO 63026 mstirnaman@aspent.com www.aspent.com

1.3EXECUTION
A.Preparation. Minimize area to be disturbed. Construct controls in accordance with manufacturer recommendations.
1.Buffer Area and Windrow.
a.Insure buffer area is not disturbed. Boundaries will be established by the Government prior to work start.
2.Temporary Controls
a.Before grubbing and grading, construct all temporary erosion controls.
3.Permanent Controls (Optional Bid Item)
a.Rolled Erosion Control Mat and Turf Reinforcement Mat
1)Government Furnished Seed Mix must be applied prior to Mat installation.
2)Must be installed in Spring 2017, in conjunction with the seed mix. See Seed and Straw Specification for installation limitations.
B.Construction. Construct erosion control and sediment control measures as follows:
1.Buffer Area and Windrow. Construct windrow for filtering sediment from runoff and reducing the velocity of sheet flow on the upstream side of the vegetated buffer area as shown on drawings.
a.Construct windrow according to best management practices included as appendix to the contract package.
2.Temporary: Install any temporary erosion or pollution control measures that are required due to negligence or carelessness, without compensation.
a.Install straw bales and silt fence in accordance with attached EPA/MDNR guidance.
3.Permanent: Construct permanent erosion controls, in accordance with drawings, after seed mix is applied. Install according to manufacturer recommendations, unless otherwise approved by COR.
a.Turf Reinforcement Mat
1)Install using anchor pattern H, 15 staples per panel, as depicted in Attached Installation Manual.
b.Rolled Erosion Control Mat
1)Install according to manufacturer’s recommendations.
C.Turf Re-establishment (Optional Bid Item, to be completed in February 2017). Government will furnish native seed mix.
D.Inspection & Reporting. Inspect and repair all erosion control measures at least every 7 days, and within 24 hours after more than one inch of rain in 24 hours.
E.Maintenance & Cleanup. Maintain temporary erosion control measures in working condition until the project is complete or the measures are no longer needed.
1.Replace erosion control measures that cannot be maintained and those that are damaged by construction operations.
2.Remove sediment trapped in perimeter control measures before deposits reach 100% of the above ground height.

END OF SECTION 31 00 00

SECTION 31 10 00 - SITE CLEARING

1.1SECTION REQUIREMENTS
A.Utility Locator Service: NA
B.Do not disturb trees unless approved by COR. Remain within flagged boundaries.

PART 2 - EXECUTION

2.1 SITE CLEARING

As approved and indicated in plans, remove obstructions, trees, shrubs, grass, and other vegetation as needed.

1.Use Contractor’s preferred method of slash treatment, such as scattering, piling, burying, debris mat, etc.
2.Do NOT disturb buffer area, filter strip and site boundaries.
3.Construction slash placement will not be allowed in lakes, meadows, or streams.
4.As indicated in drawings, 150 foot vegetated buffer area shall be left in place in the manmade ravine leading to the lake (see drawings). In addition, in the area depicted, use trees, stumps and other organic material to create a windrow buffer strip to serve as a sediment filter strip and catch wall.
5.Clearing and grubbing can be performed in the most economically efficient manner, so long as it minimizes impact to soil erosion and water quality.
a.Specific Slash Treatment Methods. When using one or more of the following slash treatment methods, meet requirements specified below:
1)Windrowing Construction Slash. Place construction slash in neat, compacted windrows laid approximately parallel to and along the toeline of embankment slopes. Do not permit the top of the windrows to extend above the top of subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile.
2)Scattering. Scatter construction slash outside the clearing limits without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
3)Piling. Pile construction slash in areas designated on the ground and approved by the COR or. Place and construct piles so future burning will not damage remaining trees. Keep piles reasonably free of dirt from stumps.
4)Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope.
5)Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.

END OF SECTION 31 10 00

SECTION 31 20 00 - EARTH MOVING

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

This work consists of excavating material, hauling, placing, disposing, sloping, shaping, compacting, and finishing earthen material.

Governing Specifications: Governing specifications for this project are “Standard Specifications for Construction of Roads and Bridges On Federal Highway Projects - FP-14”. A portion of the relevant specifications are included with this document and contains all local revisions that are applicable to the specification. Full Specifications are available at: http://flh.fhwa.dot.gov/resources/specs/ Utility Locator Service: NA PART 2 - PRODUCTS – Not Used

PART 3 - EXECUTION

3.1LAYOUT AND GRADES
A.Establish and maintain field survey control lines and temporary benchmarks as needed.
B.Designate pre-approved stockpile locations if needed.
3.2EXCAVATION
A.Grade areas to a smooth surface to cross sections, lines, and elevations indicated.
B.Use all suitable excavated material in the construction of bedding, and backfill for road.
C.Compact fill areas until there is no visual displacement.
D.Finish the road surface to be reasonably smooth, uniform, and shaped to conform to the typical sections as SHOWN ON THE DRAWINGS.
3.3CLEANUP
A.Thoroughly clean the entire project of trash and other debris. Haul excess materials away and legally dispose of off-site.

END OF SECTION 31 20 00

SECTION 32 92 00 - TURF AND GRASSES

PART 1 - GENERAL

1.1SECTION REQUIREMENTS
A.Submittals:
1.Product specifications for weed-free straw and weed free mulch.
B.Planting Restrictions: Contractor must coordinate with the COR to apply seed at the optimal time in spring 2017 (typically February). Government will provide the contractor a three week period, and contractor will have the flexibility to mobilize and apply seed, straw and erosion control mats, as their schedule permits.

PART 2 - PRODUCTS

2.1GRASSES FOR SEEDING
A.Government will supply a seed mix that will consist of native grasses.
B.Contractor will supply weed-free straw.

PART 3 - EXECUTION

3.1PREPARATION
A.Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades. Moisten before planting.
3.2PLANTING
A.Seeding:
1.Evenly distribute seed by sowing with spreader or seeding machine in two directions at right angles to each other. Rake seed lightly into top 1/8 inch of topsoil.
2.Protect seeded areas by applying compost mulch after completing seeding operations. Soak areas, scatter mulch uniformly to a thickness of 3/16 inch, and roll surface smooth.

END OF SECTION 32 92 00

52.217-5 Evaluations of Options (JUL 1990) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.217-7 Option for Increased Quantity—Separately Priced Line Item. (Mar 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within [insert in the clause the period of time in which the Contracting Officer has to exercise the option]. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.(Sept 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless-

(1) The product cannot be acquired-

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall-

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than-

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

The contractor must comply with Section 9002 of the Farm Security and Rural Investtment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Enviromental, Energy, and Transportation Management”, and the Federal Acquisition Regulations to provide green products. All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased, recycled content, energy star, and environmentally preferable products.

For more information regarding the Department of Agriculture Biobased Affirmative Procurement Program go to http://www.biopreferred.gov/BioPreferred/faces/Welcome.xhtml and then click on Biobased Produducts for a completed category listing in the Biopreferred Catalog.

For more information regarding Environmental Protection Agency list of designated products to http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm For more information regarding Energy Star products go to http://www.energystar.gov/

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall—

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to James Klug.

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within ___5___ days after the date of contract award.

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The contracting Officer will designate a Contracting Officer's Representative(COR) at the time of award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the contracting officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal for a contract claim.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

EQUIPMENT CLEANING

All soil moving equipment shall be thoroughly cleaned to make it free of soil, noxious weed seeds, vegetative matter or other debris that could contain or hold seeds prior to being delivered to the project site. Equipment shall be considered free of soil, noxious weed seeds and other such debris when a visual inspection by the C.O.R., prior to the equipment being delivered to the site, does not disclose such material present. Disassembly of equipment components is not required. The Contractor shall notify the Forest Service at least five (5) working days prior to moving each piece of soil moving equipment onto the project site, unless otherwise agreed.

The Contractor shall thoroughly clean all soil moving equipment prior to moving them off a project site or between work areas on a project site that are known to be infested with noxious weed species of concern and other work areas, if any, that are free of noxious weed species of concern. Areas known to be infested with specific noxious weed species of concern to the Forest Service shall be noted in the Schedule of Work. The Contractor and the Forest Service shall agree on the methods of cleaning, location for the cleaning and control of off-site impacts, if any.

When new areas of infestation of noxious weeds of concern to the Forest Service are identified on the project site by either the Forest Service or Contractor they shall be promptly reported to the other party.

INVOICING

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted online via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Your company must register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account in order to submit an invoice on this project.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.204-7System for Award Management (JUL 2013)
52.204-13System for Award Management Maintenance (JUL 2013)
52.204-10Reporting Executive Compensation and First-Tier Subcontract Awards (AUG 2012)
52.204-18Commercial and Government Entity Code Maintenance (NOV 2014)
52.204-19Incorporation by Reference of Representations and Certifications (DEC 2014)

52.209-6 Protecting the Government's Interest when Subcontracting

with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) (Applicable if contract exceeds $30,000)
52.209-10Prohibition on Contracting with Inverted Domestic Corporations (DEC 2014)
52.211-18Variation in Estimated Quantity (APR 1984)
52.219-6Notice of Total Small Business Set-Aside (NOV 2011)
52.219-28Post-Award Small Business Program Representation. (JUL 2013)
52.222-3Convict Labor (JUN 2003)
52.222-6Construction Wage Rate Requirements (MAY 2014)
52.222-7Withholding of Funds (MAY 2014)
52.222-8Payrolls and Basic Records (MAY 2014)
52.222-9Apprentices and Trainees (JUL 2005)
52.222-10Compliance with Copeland Act Requirements (FEB 1988)
52.222-11Subcontracts (Labor Standards) (MAY 2014)
52.222-12Contract Termination - Debarment (MAY 2014)
52.222-13Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014)
52.222-14Disputes Concerning Labor Standards (FEB 1988)
52.222-15Certification of Eligibility (MAY 2014))
52.222-21Prohibition of Segregated Facilities (FEB 1999)
52.222-26Equal Opportunity (MAR 2007)
52.222-27Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-50Combating Trafficking in Persons (MAR 2015)
52.222-55Minimum Wages Under Executive Order 13658 (DEC 2014)
52.223-5Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6Drug-Free Workplace (MAY 2001)
52.223-17Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (MAY 2008)
52.223-18Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2011)
52.225-13Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1Authorization and Consent (DEC 2007)
52.227-2Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000)
52.228-11Pledges of Assets (JAN 2012) (Applicable if contract exceeds $30,000)
52.228-12Prospective Subcontractor Requests for Bonds (MAY 2014) (Applicable if contractexceeds $30,000)
52.228-14Irrevocable Letter of Credit (NOV 2014) (Applicable if contract exceeds $30,000)
52.232-5Payments Under Fixed-Price Construction Contracts (MAY 2014)
52.232-17Interest (MAY 2014)
52.232-23Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (MAY 2014)

52.232-33Payment by Electronic Funds Transfer – System for Award Management (JUL 2013)
52.232-39Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
52.233-1Disputes (MAY 2014) Alt 1 (DEC 1991)
52.233-3Protest After Award (AUG 1996)
52.233-4Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2Differing Site Conditions (APR 1984)
52.236-3Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5Material and Workmanship (APR 1984)
52.236-6Superintendence by the Contractor (APR 1984)
52.236-7Permits and Responsibilities (NOV 1991)
52.236-8Other Contracts (APR 1984)
52.236-9Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10Operations and Storage Areas (APR 1984)
52.236-11Use and Possession Prior to Completion (APR 1984)
52.236-12Cleaning Up (APR 1984)
52.236-13Accident Prevention (NOV 1991) ALT 1
52.236-14Availability and Use of Utility Services (APR 1984)
52.236-17Layout of Work (APR 1984)
52.236-21Specifications and Drawings for Construction (FEB 1997)
52.243-5Changes and Changed Conditions (APR 1984)
52.244-6Subcontracts for Commercial Items (MAR 2015)
52.245-1Property Records - Alt 1 (APR 2012)
52.245-9Use and Charges (APR 2012)
52.246-21Warranty of Construction (MAR 1994)

Alternate I (APR 1984)

52.248-3Value Engineering – Construction (OCT 2010)
52.249-1Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)
52.249-10Default (Fixed-Price Construction) (APR 1984)
52.253-1Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $30,000)
452.236-71Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72Use of Premises (NOV 1996)
452.236-73Archeological or Historic Sites (FEB 1988)
452.236-74Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76Samples and Certificates (FEB 1988)
452.236-77Emergency Response (NOV 1996)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

52.225-9 Buy American—Construction Materials. Buy American—Construction Materials (May 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .