2.02_Lost_Lake_Slump_Repair_2016_Final.pdf
PDF 2 MB Posted
- Attached to
- Lost Lake Embankment Mitigation
- Solicitation number
- AG-52B1-S-16-0060
- Issued by
-
Department of Agriculture Forest Service
About this file
slump repair specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_2_information.docx | DOCX document | |
| amendment_A0002.doc | DOC document | |
| Lost_Lake_Pre.docx | DOCX document | |
| amendment_A0001.doc | DOC document | |
| 2.03_Lost_Lake_1-2250_aerial.pdf | ||
| quote_document_and_clauses_revised_AMC.docx | DOCX document | |
| P550_5.13.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55.0
SLUMP
FUTURE GROUND
EXISTING GROUND
0+00
0+50
1+00
1+50
2+00
2+50 3+00
30.0
3+50
4+00
EDGE OF SLUMP (EAST SIDE)
10.0 10.0
0+60
1+15
TOP OF EMBANKMENT - FUTURE
TOP OF EMBANKMENT - EXISTING
70.0
14.0
28.0
28.0
28.0
SLUMP
3.0
56.0
7.0
50.0
3.0
0+00
0+50
1+00
1+50
2+00
2+50 3+00 3+50
4+00
0+60
1+15
EXISTING
FAILED
CULVERT
EDGE OF
SLUMP
(EAST
SIDE)
VOID WHERE
WATER IS
FLOWING
PARKING AND TURN
AROUND AREA - 4+00 TO
5+50 (APPROXIMATE)
United States Department of Agriculture Forest Service
DATENO.
REVISION / ISSUE
1 00/00/00REVISION1
REVISION3
REVISION2
00/00/00
00/00/00
00/00/00REVISION4
A-01 06/28/2016
A.WILSON,PE
A.CREWS,PE
A.CREWS,PE
EMBANKMENT PROFILE
SALEM RANGER DISTRICT
MARK TWAIN
NATIONAL FOREST
LOST LAKE
EMBANKMENT MITIGATION
(R09) EASTERN REGION
EMBANKMENT AREA PROFILE VIEW
EMBANKMENT AREA PLAN VIEW
1. STATIONS AND MEASUREMENTS ARE ESTIMATED FROM DIGITAL AERIAL PHOTOS, AND
SHALL NOT BE USED FOR CONSTRUCTION DETAIL.
PH 3
UPSTREAM FACE OF EMBANKMENT FROM SHORELINE
PH 1
UPSTREAM FACE OF SLUMP PH 2
UPSTREAM FACE OF SLUMP FROM TOP OF EMBANKMENT
PH 4
TYPICAL EMBANKMENT VEGETATION TO BE REMOVED
United States Department of Agriculture Forest Service
DATENO.
REVISION / ISSUE
1 00/00/00REVISION1
REVISION3
REVISION2
00/00/00
00/00/00
00/00/00REVISION4
A-02 06/28/2016
A.WILSON,PE
A.CREWS,PE
A.CREWS,PE
EXISTING CONDITION PHOTOS
SALEM RANGER DISTRICT
MARK TWAIN
NATIONAL FOREST
LOST LAKE
EMBANKMENT MITIGATION
(R09) EASTERN REGION
1+00
EAST SIDE
OF SLUMP
0+50
WEST SIDE
OF SLUMP
GENERAL CONSTRUCTION NOTES
1. COST EFFICIENCY IS CRITICAL DUE TO LIMITED FUNDS
AVAILABILITY.
2. EQUIPMENT CLEANING: TO PREVENT THE SPREAD OF
INVASIVE SPECIES, EQUIPMENT SHALL BE FREE OF SOIL,
SEED, VEGETATIVE MATTER OR OTHER DEBRIS THAT COULD
CONTAIN OR MAY HOLD SEEDS PRIOR TO MOBILIZATION.
INSPECTION OF ALL EQUIPMENT IS A CONTRACT PROVISION
AND ARRANGEMENTS FOR INSPECTION SHALL BE
COORDINATED WITH THE COR INSPECTOR.
3. STATIONS ARE APPROXIMATE.
United States Department of Agriculture Forest Service
DATENO.
REVISION / ISSUE
1 00/00/00REVISION1
REVISION3
REVISION2
00/00/00
00/00/00
00/00/00REVISION4
A-03 06/28/2016
A.WILSON,PE
A.CREWS,PE
A.CREWS,PE
SITE LAYOUT AND
PROJECT BOUNDARIES
SALEM RANGER DISTRICT
MARK TWAIN
NATIONAL FOREST
LOST LAKE
EMBANKMENT MITIGATION
(R09) EASTERN REGION
EAST SIDE OF
SLUMP 1+00
VEGETATED BUFFER AREA,
MINIMUM 150' FROM EXISTING
WATER; GOVT WILL STAKE
EXISTING CLEARING TO BE ENLARGED
AND USED FOR EQUIPMENT TURN
AROUND
EXISTING TURN AROUND AREA TO BE ENLARGED
FOR EQUIPMENT PER TURN AROUND DETAIL
FILL AREA, TO BE APPROXIMATELY LEVEL WITH FINISHED EMBANKMENT
PROFILE AND COMPACTED TO WITHSTAND EQUIPMENT WEIGHT
TREES USED FOR WINDROW WALL FOR
EROSION CONTROL - CLEARED FROM
EMBANKMENT AND/OR FILL AREA
ENTRENCHED ROAD BED, FILL
AREA
1+00
3+00
0+00
2+00
4+00
INSTALL 4 OUTLETS, 2 DIPS, AS
FIELD CONDITIONS REQUIRE
AND APPROVED BY THE COR
A
A'
5+00
6+00
B
B'
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
23+00
N
SLUMP
14.0
40.0
1.5
EXISTING GROUND
STARTING
STATION
ENDING
STATION
EXISTING CROSS
SECTION
NOTES
0+00 0+50
FIG 1 - TYPICAL
EXISTING CROSS
SECTION
RAILROAD
EMBANKMENT
0+50 1+00
FIG 2 - EXISTING
SLUMPED CROSS
SECTION
DIMENSIONS ARE
ESTIMATED AND
IDEALIZED.
APPROXIMATE VOLUME
OF SLUMPED AREA IS
1000 CY
1+00 4+00
FIG 1 - TYPICAL
EXISTING CROSS
SECTION
RAILROAD
EMBANKMENT
4+00 5+50 NOT DRAWN
PARKING AND TURN
AROUND AREA
5+50 15+00 NOT DRAWN
FR 2741 - ENTRENCHED
ROAD BED
STARTING
STATION
ENDING
STATION
PLANNED CROSS
SECTION
NOTES
0+00 0+60
SLOPING AT 2:1 (60
FEET LONG, 30 FEET
DEEP)
0+60 1+15
PROFILE ON SHEET
55 WIDE LEVEL
CHANNEL, 30 FOOT
DEEP
1+15 1+55
PROFILE ON SHEET
SLOPING AT 2:1 (40
FEET LONG, 20 FEET
UP).
1+55 4+00
SHEET 1 AND FIG 3,
SHEET 05
EMBANKMENT
LOWERED 10'
4+00 5+50
PARKING AND TURN
AROUND AREA
5+50 15+00
ENTRENCHED ROAD
BED - USE AREA FOR
FILL
1.5
3.0
CLOGGED 36" PIPE (X2)
EXISTING WATER
SURFACE ELEVATION
CAVITY IN EMBANKMENT,
PRIMARY LAKE DRAIN
EXISTING GROUND
BEAVER DAM,
TO BE REMOVED
3.0
CLOGGED 36" PIPE (X2)
30.0
10.0
TOP OF SLOPE, STATION 1+55
~55' WIDE LEVEL CHANNEL
SLOPED 1% TO 2% DOWNSTREAM
BEAVER DAM,
TO BE REMOVED
14.0
27.5
FUTURE GROUND
SLOPED UPSTREAM
AREA TO BE EXCAVATED
1.5
United States Department of Agriculture Forest Service
DATENO.
REVISION / ISSUE
1 00/00/00REVISION1
REVISION3
REVISION2
00/00/00
00/00/00
00/00/00REVISION4
A-04 06/28/2016
A.WILSON,PE
A.CREWS,PE
A.CREWS,PE
EMBANKMENT CONSTRUCTION DETAILS
SALEM RANGER DISTRICT
MARK TWAIN
NATIONAL FOREST
LOST LAKE
EMBANKMENT MITIGATION
(R09) EASTERN REGION
FIG 1 - EXISTING CROSS SECTION A-A' (TYPICAL)EXISTING CROSS SECTION NOTES BY STATION
APPROXIMATE STATIONS: 0+00 TO 0+50, 1+00 TO 4+00
FIG 2 - EXISTING SLUMPED CROSS SECTION B-B'
APPROXIMATE STATIONS: 0+50 TO 1+00
FIG 3 - PLANNED CROSS SECTION (-30')
APPROXIMATE STATIONS: 0+60 TO 1+15
PLANNED CROSS SECTION NOTES BY STATION
FIG 4 - PLANNED CROSS SECTION (-10')
APPROXIMATE STATIONS: 1+55 TO 4+00
1. THE TOP SEVERAL FEET OF THE EMBANKMENT CONTAINS SLAG MATERIAL. THIS LIGHTWEIGHT MINING
WASTE MATERIAL DOES NOT CONTAIN LEAD.
2. SAFETY NOTE: NOTE THAT WATER IS NOT CURRENTLY FLOWING THROUGH THE PIPE, BUT HAS
CREATED A VOID IN THE EMBANKMENT WHICH IS NOW THE PRIMARY OUTLET. SIZE OF THE CAVITY IS
UNKNOWN. CARE SHOULD BE TAKEN DURING EXCAVATION TO PREVENT COLLAPSE, AND ALSO TO
COMPACT THE VOID TO THE MAXIMUM EXTENT PRACTICAL.
3. FILL IN VOID CREATED AT BASE OF SLUMP AT BEAVER DAM,TO RE-ESTABLISH SLOPE.
4. REMOVE BEAVER DAM. DO NOT USE MATERIAL FOR SPILLWAY FILL. PLACE DOWNSTREAM OUTSIDE OF
SPILLWAY AREA.
UPSTREAM DOWNSTREAM
SLOPED 1%-2%
UPSTREAM
APPROXIMATE STATIONS: 5+50 TO 15+00 (SEE PROFILE)
ROAD BED CONSTRUCTION NOTES
6. MAXIMUM COMPACTED DEPTH OF 6 FEET
SHALL BE APPLIED TO THE ROAD FILL AREA.
7. ROADBED FILL AREA SHALL BE COMPACTED
SO THERE IS NO VISUAL DISPLACEMENT.
8. ROADWAY RECONDITIONING ON FR 2741 IS
NOT REQUIRED FOR THIS CONTRACT. ANY
ROADWAY CONDITIONING THAT IS
COMPLETED BY CONTRACTOR WILL BE
CONSIDERED INCIDENTAL.
9. PRIOR TO THE PLACEMENT OF AGGREGATE
COURSES, THE SUBGRADE SHOULD BE LEFT IN
A CONDITION FREE OF RUTS AND
DEPRESSIONS AND THAT WILL PERMIT
DISPERSED DRAINAGE. TEMPORARY
INSTALLATION OF WATER BARS MAY BE
REQUIRED TO MINIMIZE EROSION IF
OPERATIONS WILL STOP FOR MORE THAN 7
DAYS WITHOUT PERMANENT STABILIZATION.
EROSION CONTROL MEASURES ARE
INCIDENTAL TO CLEARING AND GRUBBING
AND ROADWAY EXCAVATION.
10. INSTALL FOUR OUTLET DITCHES AND TWO
DIPS. LOCATION TO BE DETERMINED IN FIELD
AS CONDITIONS DICTATE.MUST OBTAIN
APPROVAL FROM COR.
11. TWO TURNAROUNDS WILL BE
CONSTRUCTED AS SHOWN ON SHEET 03,
UNLESS APPROVED BY THE COR.
12. ALL EFFORTS SHALL BE MADE TO PREVENT
SLAG MATERIAL FROM BEING USED WITHIN
THE TOP 6 INCHES OF THE ROADBED.
13. OPTIONAL BID ITEMS: 2" OF LOOSE, 2"
MINUS CRUSHED AGGREGATE ADDED TO
ROADBED AND TURN-AROUNDS.
TYPICAL FUTURE ROAD BED CROSS SECTION
United States Department of Agriculture Forest Service
DATENO.
REVISION / ISSUE
1 00/00/00REVISION1
REVISION3
REVISION2
00/00/00
00/00/00
00/00/00REVISION4
A-05 06/28/2016
A.WILSON,PE
A.CREWS,PE
A.CREWS,PE
ROADWAY DETAILS
SALEM RANGER DISTRICT
MARK TWAIN
NATIONAL FOREST
LOST LAKE
EMBANKMENT MITIGATION
(R09) EASTERN REGION
1. ALL WATER BARS SHALL BEGIN AT THE
INTERSECTION OF THE ROADBED AND OUT
SLOPE AND RUN ACROSS THE ENTIRE WIDTH
OF THE ROADBED.
2. ALL WATER BARS SHALL HAVE FREE
FLOWING OUTLETS.
3. WHEN STAKES ARE USED, THEY SHALL
DESIGNATE THE OUTLET LOCATION.
4. BASE WIDTH FOR THE ROAD REMAINS THE
SAME (APPROXIMATELY 12 FEET.)
5. DO NOT EXCEED FLAGGED BOUNDARIES.
TOP OF EMBANKMENT - FUTURE
70.0
14.0
28.0
28.0
28.0
7.0
LAKE SURFACE
VEGETATED BUFFER AREA - NO CONSTRUCTION ZONE
BOTTOM OF EMBANKMENT - EXISTING
0+00
0+50
1+00
1+50 2+00
2+50 3+00 3+50
4+00
56.0
28.0
55.0
EDGE OF SLUMP (EAST SIDE)
GOVERNMENT WILL STAKE
EXISTING ROAD
FILL AREA
United States Department of Agriculture Forest Service
DATENO.
REVISION / ISSUE
1 00/00/00REVISION1
REVISION3
REVISION2
00/00/00
00/00/00
00/00/00REVISION4
A-06 06/28/2016
A.WILSON,PE
A.CREWS,PE
A.CREWS,PE
EROSION CONTROL DETAILS
SALEM RANGER DISTRICT
MARK TWAIN
NATIONAL FOREST
LOST LAKE
EMBANKMENT MITIGATION
(R09) EASTERN REGION
GENERAL VEGETATION AND EROSION CONTROL NOTES
- DIMENSIONS NOT TO SCALE.AND STATIONS ARE APPROXIMATED.
- ADDITIONAL EROSION CONTROL MAY BE NEEDED AS WEATHER AND FIELD
CONDITIONS DETERMINE. ANY ADDITIONAL MEASURES WILL BE
NEGOTIATED AS A MODIFICATION. BID SHALL INCLUDE ONLY WHAT IS
DEPICTED HERE. SEE SPECS FOR ADDITIONAL PRODUCT AND
INSTALLATION DETAILS.
WINDROW EROSION CONTROL
SPECIFIC VEGETATION AND EROSION CONTROL NOTES
1 VEGETATED BUFFER AREA SHALL BE AT LEAST 150 FEET FROM
WATER SURFACE AND SHALL NOT BE DISTURBED. GOVERNMENT
WILL STAKE PRIOR TO CONSTRUCTION.
2 INSTALL STRAW BALES, STAKE AND TRENCH IN.
3 INSTALL SILT FENCE.
4 SLASH MAY BE LEFT IN PLACE, PILED, ETC. AS NEEDED FOR
CONVENIENCE AND EFFICIENCY OF OPERATION.
5 OPTIONAL BID ITEM: SEED AND STRAW.
6 OPTIONAL BID ITEM: APPLY SEED AND INSTALL ROLLED EROSION
CONTROL CELLULAR MAT FOR SLOPE PROTECTION.
7 OPTIONAL BID ITEM: APPLY SEED AND INSTALL PERMANENT
EROSION CONTROL TURF REINFORCEMENT MAT FOR CHANNEL AND
EXTEND UP THE SIDE SLOPES TWO FEET, AND UP AND DOWN THE
UPSTREAM AND DOWNSTREAM SLOPES ON ALL BARE EARTH. SEE
SPECIFICATIONS FOR INSTALLATION REQUIREMENTS.
File details come from the government source that posted it. Updated .