2.02_Lost_Lake_Slump_Repair_2016_Final.pdf

PDF 2 MB Posted

Attached to
Lost Lake Embankment Mitigation
Solicitation number
AG-52B1-S-16-0060
Issued by

About this file

slump repair specs

View the file

Other files

File Type Posted
Amend_2_information.docx DOCX document
amendment_A0002.doc DOC document
Lost_Lake_Pre.docx DOCX document
amendment_A0001.doc DOC document
2.03_Lost_Lake_1-2250_aerial.pdf PDF
quote_document_and_clauses_revised_AMC.docx DOCX document
P550_5.13.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

55.0

SLUMP

FUTURE GROUND

EXISTING GROUND

0+00

0+50

1+00

1+50

2+00

2+50 3+00

30.0

3+50

4+00

EDGE OF SLUMP (EAST SIDE)

10.0 10.0

0+60

1+15

TOP OF EMBANKMENT - FUTURE

TOP OF EMBANKMENT - EXISTING

70.0

14.0

28.0

28.0

28.0

SLUMP

3.0

56.0

7.0

50.0

3.0

0+00

0+50

1+00

1+50

2+00

2+50 3+00 3+50

4+00

0+60

1+15

EXISTING

FAILED

CULVERT

EDGE OF

SLUMP

(EAST

SIDE)

VOID WHERE

WATER IS

FLOWING

PARKING AND TURN

AROUND AREA - 4+00 TO

5+50 (APPROXIMATE)

United States Department of Agriculture Forest Service

DATENO.

REVISION / ISSUE

1 00/00/00REVISION1

REVISION3

REVISION2

00/00/00

00/00/00

00/00/00REVISION4

A-01 06/28/2016

A.WILSON,PE

A.CREWS,PE

A.CREWS,PE

EMBANKMENT PROFILE

SALEM RANGER DISTRICT

MARK TWAIN

NATIONAL FOREST

LOST LAKE

EMBANKMENT MITIGATION

(R09) EASTERN REGION

EMBANKMENT AREA PROFILE VIEW

EMBANKMENT AREA PLAN VIEW

1. STATIONS AND MEASUREMENTS ARE ESTIMATED FROM DIGITAL AERIAL PHOTOS, AND

SHALL NOT BE USED FOR CONSTRUCTION DETAIL.

PH 3

UPSTREAM FACE OF EMBANKMENT FROM SHORELINE

PH 1

UPSTREAM FACE OF SLUMP PH 2

UPSTREAM FACE OF SLUMP FROM TOP OF EMBANKMENT

PH 4

TYPICAL EMBANKMENT VEGETATION TO BE REMOVED

United States Department of Agriculture Forest Service

DATENO.

REVISION / ISSUE

1 00/00/00REVISION1

REVISION3

REVISION2

00/00/00

00/00/00

00/00/00REVISION4

A-02 06/28/2016

A.WILSON,PE

A.CREWS,PE

A.CREWS,PE

EXISTING CONDITION PHOTOS

SALEM RANGER DISTRICT

MARK TWAIN

NATIONAL FOREST

LOST LAKE

EMBANKMENT MITIGATION

(R09) EASTERN REGION

1+00

EAST SIDE

OF SLUMP

0+50

WEST SIDE

OF SLUMP

GENERAL CONSTRUCTION NOTES

1. COST EFFICIENCY IS CRITICAL DUE TO LIMITED FUNDS

AVAILABILITY.

2. EQUIPMENT CLEANING: TO PREVENT THE SPREAD OF

INVASIVE SPECIES, EQUIPMENT SHALL BE FREE OF SOIL,

SEED, VEGETATIVE MATTER OR OTHER DEBRIS THAT COULD

CONTAIN OR MAY HOLD SEEDS PRIOR TO MOBILIZATION.

INSPECTION OF ALL EQUIPMENT IS A CONTRACT PROVISION

AND ARRANGEMENTS FOR INSPECTION SHALL BE

COORDINATED WITH THE COR INSPECTOR.

3. STATIONS ARE APPROXIMATE.

United States Department of Agriculture Forest Service

DATENO.

REVISION / ISSUE

1 00/00/00REVISION1

REVISION3

REVISION2

00/00/00

00/00/00

00/00/00REVISION4

A-03 06/28/2016

A.WILSON,PE

A.CREWS,PE

A.CREWS,PE

SITE LAYOUT AND

PROJECT BOUNDARIES

SALEM RANGER DISTRICT

MARK TWAIN

NATIONAL FOREST

LOST LAKE

EMBANKMENT MITIGATION

(R09) EASTERN REGION

EAST SIDE OF

SLUMP 1+00

VEGETATED BUFFER AREA,

MINIMUM 150' FROM EXISTING

WATER; GOVT WILL STAKE

EXISTING CLEARING TO BE ENLARGED

AND USED FOR EQUIPMENT TURN

AROUND

EXISTING TURN AROUND AREA TO BE ENLARGED

FOR EQUIPMENT PER TURN AROUND DETAIL

FILL AREA, TO BE APPROXIMATELY LEVEL WITH FINISHED EMBANKMENT

PROFILE AND COMPACTED TO WITHSTAND EQUIPMENT WEIGHT

TREES USED FOR WINDROW WALL FOR

EROSION CONTROL - CLEARED FROM

EMBANKMENT AND/OR FILL AREA

ENTRENCHED ROAD BED, FILL

AREA

1+00

3+00

0+00

2+00

4+00

INSTALL 4 OUTLETS, 2 DIPS, AS

FIELD CONDITIONS REQUIRE

AND APPROVED BY THE COR

A

A'

5+00

6+00

B

B'

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00

16+00

23+00

N

SLUMP

14.0

40.0

1.5

EXISTING GROUND

STARTING

STATION

ENDING

STATION

EXISTING CROSS

SECTION

NOTES

0+00 0+50

FIG 1 - TYPICAL

EXISTING CROSS

SECTION

RAILROAD

EMBANKMENT

0+50 1+00

FIG 2 - EXISTING

SLUMPED CROSS

SECTION

DIMENSIONS ARE

ESTIMATED AND

IDEALIZED.

APPROXIMATE VOLUME

OF SLUMPED AREA IS

1000 CY

1+00 4+00

FIG 1 - TYPICAL

EXISTING CROSS

SECTION

RAILROAD

EMBANKMENT

4+00 5+50 NOT DRAWN

PARKING AND TURN

AROUND AREA

5+50 15+00 NOT DRAWN

FR 2741 - ENTRENCHED

ROAD BED

STARTING

STATION

ENDING

STATION

PLANNED CROSS

SECTION

NOTES

0+00 0+60

SLOPING AT 2:1 (60

FEET LONG, 30 FEET

DEEP)

0+60 1+15

PROFILE ON SHEET

55 WIDE LEVEL

CHANNEL, 30 FOOT

DEEP

1+15 1+55

PROFILE ON SHEET

SLOPING AT 2:1 (40

FEET LONG, 20 FEET

UP).

1+55 4+00

SHEET 1 AND FIG 3,

SHEET 05

EMBANKMENT

LOWERED 10'

4+00 5+50

PARKING AND TURN

AROUND AREA

5+50 15+00

ENTRENCHED ROAD

BED - USE AREA FOR

FILL

1.5

3.0

CLOGGED 36" PIPE (X2)

EXISTING WATER

SURFACE ELEVATION

CAVITY IN EMBANKMENT,

PRIMARY LAKE DRAIN

EXISTING GROUND

BEAVER DAM,

TO BE REMOVED

3.0

CLOGGED 36" PIPE (X2)

30.0

10.0

TOP OF SLOPE, STATION 1+55

~55' WIDE LEVEL CHANNEL

SLOPED 1% TO 2% DOWNSTREAM

BEAVER DAM,

TO BE REMOVED

14.0

27.5

FUTURE GROUND

SLOPED UPSTREAM

AREA TO BE EXCAVATED

1.5

United States Department of Agriculture Forest Service

DATENO.

REVISION / ISSUE

1 00/00/00REVISION1

REVISION3

REVISION2

00/00/00

00/00/00

00/00/00REVISION4

A-04 06/28/2016

A.WILSON,PE

A.CREWS,PE

A.CREWS,PE

EMBANKMENT CONSTRUCTION DETAILS

SALEM RANGER DISTRICT

MARK TWAIN

NATIONAL FOREST

LOST LAKE

EMBANKMENT MITIGATION

(R09) EASTERN REGION

FIG 1 - EXISTING CROSS SECTION A-A' (TYPICAL)EXISTING CROSS SECTION NOTES BY STATION

APPROXIMATE STATIONS: 0+00 TO 0+50, 1+00 TO 4+00

FIG 2 - EXISTING SLUMPED CROSS SECTION B-B'

APPROXIMATE STATIONS: 0+50 TO 1+00

FIG 3 - PLANNED CROSS SECTION (-30')

APPROXIMATE STATIONS: 0+60 TO 1+15

PLANNED CROSS SECTION NOTES BY STATION

FIG 4 - PLANNED CROSS SECTION (-10')

APPROXIMATE STATIONS: 1+55 TO 4+00

1. THE TOP SEVERAL FEET OF THE EMBANKMENT CONTAINS SLAG MATERIAL. THIS LIGHTWEIGHT MINING

WASTE MATERIAL DOES NOT CONTAIN LEAD.

2. SAFETY NOTE: NOTE THAT WATER IS NOT CURRENTLY FLOWING THROUGH THE PIPE, BUT HAS

CREATED A VOID IN THE EMBANKMENT WHICH IS NOW THE PRIMARY OUTLET. SIZE OF THE CAVITY IS

UNKNOWN. CARE SHOULD BE TAKEN DURING EXCAVATION TO PREVENT COLLAPSE, AND ALSO TO

COMPACT THE VOID TO THE MAXIMUM EXTENT PRACTICAL.

3. FILL IN VOID CREATED AT BASE OF SLUMP AT BEAVER DAM,TO RE-ESTABLISH SLOPE.

4. REMOVE BEAVER DAM. DO NOT USE MATERIAL FOR SPILLWAY FILL. PLACE DOWNSTREAM OUTSIDE OF

SPILLWAY AREA.

UPSTREAM DOWNSTREAM

SLOPED 1%-2%

UPSTREAM

APPROXIMATE STATIONS: 5+50 TO 15+00 (SEE PROFILE)

ROAD BED CONSTRUCTION NOTES

6. MAXIMUM COMPACTED DEPTH OF 6 FEET

SHALL BE APPLIED TO THE ROAD FILL AREA.

7. ROADBED FILL AREA SHALL BE COMPACTED

SO THERE IS NO VISUAL DISPLACEMENT.

8. ROADWAY RECONDITIONING ON FR 2741 IS

NOT REQUIRED FOR THIS CONTRACT. ANY

ROADWAY CONDITIONING THAT IS

COMPLETED BY CONTRACTOR WILL BE

CONSIDERED INCIDENTAL.

9. PRIOR TO THE PLACEMENT OF AGGREGATE

COURSES, THE SUBGRADE SHOULD BE LEFT IN

A CONDITION FREE OF RUTS AND

DEPRESSIONS AND THAT WILL PERMIT

DISPERSED DRAINAGE. TEMPORARY

INSTALLATION OF WATER BARS MAY BE

REQUIRED TO MINIMIZE EROSION IF

OPERATIONS WILL STOP FOR MORE THAN 7

DAYS WITHOUT PERMANENT STABILIZATION.

EROSION CONTROL MEASURES ARE

INCIDENTAL TO CLEARING AND GRUBBING

AND ROADWAY EXCAVATION.

10. INSTALL FOUR OUTLET DITCHES AND TWO

DIPS. LOCATION TO BE DETERMINED IN FIELD

AS CONDITIONS DICTATE.MUST OBTAIN

APPROVAL FROM COR.

11. TWO TURNAROUNDS WILL BE

CONSTRUCTED AS SHOWN ON SHEET 03,

UNLESS APPROVED BY THE COR.

12. ALL EFFORTS SHALL BE MADE TO PREVENT

SLAG MATERIAL FROM BEING USED WITHIN

THE TOP 6 INCHES OF THE ROADBED.

13. OPTIONAL BID ITEMS: 2" OF LOOSE, 2"

MINUS CRUSHED AGGREGATE ADDED TO

ROADBED AND TURN-AROUNDS.

TYPICAL FUTURE ROAD BED CROSS SECTION

United States Department of Agriculture Forest Service

DATENO.

REVISION / ISSUE

1 00/00/00REVISION1

REVISION3

REVISION2

00/00/00

00/00/00

00/00/00REVISION4

A-05 06/28/2016

A.WILSON,PE

A.CREWS,PE

A.CREWS,PE

ROADWAY DETAILS

SALEM RANGER DISTRICT

MARK TWAIN

NATIONAL FOREST

LOST LAKE

EMBANKMENT MITIGATION

(R09) EASTERN REGION

1. ALL WATER BARS SHALL BEGIN AT THE

INTERSECTION OF THE ROADBED AND OUT

SLOPE AND RUN ACROSS THE ENTIRE WIDTH

OF THE ROADBED.

2. ALL WATER BARS SHALL HAVE FREE

FLOWING OUTLETS.

3. WHEN STAKES ARE USED, THEY SHALL

DESIGNATE THE OUTLET LOCATION.

4. BASE WIDTH FOR THE ROAD REMAINS THE

SAME (APPROXIMATELY 12 FEET.)

5. DO NOT EXCEED FLAGGED BOUNDARIES.

TOP OF EMBANKMENT - FUTURE

70.0

14.0

28.0

28.0

28.0

7.0

LAKE SURFACE

VEGETATED BUFFER AREA - NO CONSTRUCTION ZONE

BOTTOM OF EMBANKMENT - EXISTING

0+00

0+50

1+00

1+50 2+00

2+50 3+00 3+50

4+00

56.0

28.0

55.0

EDGE OF SLUMP (EAST SIDE)

GOVERNMENT WILL STAKE

EXISTING ROAD

FILL AREA

United States Department of Agriculture Forest Service

DATENO.

REVISION / ISSUE

1 00/00/00REVISION1

REVISION3

REVISION2

00/00/00

00/00/00

00/00/00REVISION4

A-06 06/28/2016

A.WILSON,PE

A.CREWS,PE

A.CREWS,PE

EROSION CONTROL DETAILS

SALEM RANGER DISTRICT

MARK TWAIN

NATIONAL FOREST

LOST LAKE

EMBANKMENT MITIGATION

(R09) EASTERN REGION

GENERAL VEGETATION AND EROSION CONTROL NOTES

- DIMENSIONS NOT TO SCALE.AND STATIONS ARE APPROXIMATED.

- ADDITIONAL EROSION CONTROL MAY BE NEEDED AS WEATHER AND FIELD

CONDITIONS DETERMINE. ANY ADDITIONAL MEASURES WILL BE

NEGOTIATED AS A MODIFICATION. BID SHALL INCLUDE ONLY WHAT IS

DEPICTED HERE. SEE SPECS FOR ADDITIONAL PRODUCT AND

INSTALLATION DETAILS.

WINDROW EROSION CONTROL

SPECIFIC VEGETATION AND EROSION CONTROL NOTES

1 VEGETATED BUFFER AREA SHALL BE AT LEAST 150 FEET FROM

WATER SURFACE AND SHALL NOT BE DISTURBED. GOVERNMENT

WILL STAKE PRIOR TO CONSTRUCTION.

2 INSTALL STRAW BALES, STAKE AND TRENCH IN.

3 INSTALL SILT FENCE.

4 SLASH MAY BE LEFT IN PLACE, PILED, ETC. AS NEEDED FOR

CONVENIENCE AND EFFICIENCY OF OPERATION.

5 OPTIONAL BID ITEM: SEED AND STRAW.

6 OPTIONAL BID ITEM: APPLY SEED AND INSTALL ROLLED EROSION

CONTROL CELLULAR MAT FOR SLOPE PROTECTION.

7 OPTIONAL BID ITEM: APPLY SEED AND INSTALL PERMANENT

EROSION CONTROL TURF REINFORCEMENT MAT FOR CHANNEL AND

EXTEND UP THE SIDE SLOPES TWO FEET, AND UP AND DOWN THE

UPSTREAM AND DOWNSTREAM SLOPES ON ALL BARE EARTH. SEE

SPECIFICATIONS FOR INSTALLATION REQUIREMENTS.