ATT D Davis Bacon.pdf
PDF 32 KB Posted
- Solicitation number
- AG-4419-S-10-0653
About this file
ATT D DAVIS BACON WD
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1442 AG-4419-S-10-0653.pdf | ||
| ATT B SPECIFICATIONS.pdf | ||
| ATT C DRAWINGS PLANS.pdf | ||
| RFP AG-4419-S-10-0653.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MN100151 03/19/2010 MN151
Superseded General Decision Number: MN20080151
State: Minnesota
Construction Type: Heavy
Heavy including Water and Sewer Lines
Counties: Beltrami, Cass, Clearwater, Cook, Crow Wing, Hubbard, Itasca, Koochiching, Lake, Lake of the Woods, Mahnomen, Mille Lacs, Morrison and Pine Counties in Minnesota.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Modification Number Publication Date
0 03/12/2010
1 03/19/2010
CARP0361-010 05/01/2009
COOK, ITASCA, KOOCHICHING, LAKE, PINE
Rates Fringes
CARPENTER (Form Work Only).......$ 30.12 14.65
* CARP0606-023 05/01/2009
BELTRAMI, CASS, CLEARWATER, CROW WING, HUBBARD, LAKE OF THE
WOODS, MAHNOMEN
CARPENTER (Form Work Only).......$ 23.25 13.69
* CARP0606-024 05/01/2009
MORRISON
CARPENTER (Form Work Only).......$ 23.45 14.21
* CARP0930-015 05/01/2009
MILLE LACS
CARPENTER (Form Work Only).......$ 25.53 16.09
ELEC0110-020 11/01/2009
MILLE LACS (South of Bradbury, Lewis & Onamia Townships), 4/27/2010http://www.wdol.gov/wdol/scafiles/davisbacon/MN151.dvb
ELECTRICIAN......................$ 35.55 20.37
ELEC0110-029 11/01/2009
PINE (South of Arione, Barry, Clover, Hinckley & Ogema
Townships)
ELECTRICIAN......................$ 35.55 20.37
ELEC0242-003 05/31/2009
CASS (Bounded on the north by the south line of Leech Lake, Minnesota Island, Could, Bay River & Salem Townships), COOK, CROW WING, HUBBARD (Except Rockwood, Helga, Farden, Lake
Hattie, Schoolcraft, Guthrie, Hart Lake, Lake Alice, Lake
George, Hendrickson & Lakeport), ITASCA (Southerly 12
Townships, including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), LAKE, MILLE LACS (Including
Northerly Townships of Kathio, South Harbor, Isle, East Side, Onamia & Harbor), MORRISON, PINE (Excluding southerly
Townships of Brook Park, Mission Creek, Munch, Crosby, Pokegama, Cross Lake, Chengwatana, ELECTRICIAN......................$ 31.24 63.5%
ELEC0294-007 05/31/2009
KOOCHICHING (East of a line extending North and South from the easternmost point of the City limits of Grand Rapids)
ELECTRICIAN......................$ 32.28 58.75%
ELEC0294-013 05/31/2009
HUBBARD (North part bounded on the south by a line extending east & west of the south line of Lake Alice & Lake George
Townships)
ELECTRICIAN......................$ 32.28 58.75%
ELEC0294-015 05/31/2009
BELTRAMI,CASS (Northern part bounded on the South by a line extending east and west of the south line of Boy River and
Salem Twps.), CLEARWATER, HUBBARD (Northern part bounded on the south by a line extending east and west of the south line of Lake Alice and Lake George Twp), ITASCA (Remainder of
County, Excluding the section south of a line extending east & west of the south line of Grand Rapids & Trout Lake Townships), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) ITASCA (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) & LAKE OF
THE WOODS (Excluding extreme Northwest part) COUNTIES
Electricians:....................$ 32.28 58.75%
ELEC1426-020 06/01/2009
MAHNOMEN
ELECTRICIAN......................$ 24.76 10.92
* ENGI0049-076 05/01/2009
AREA 1 (METRO): COOK, LAKE
AREA 2 (EASTERN): MILLE LACS, PINE, CASS (South of the
ANorthern right of way of Hwy #2 A& East of the Western right of way of Hwy #371), CASS (South of the northern right-of-way of U.S. Hwy #2 & east of the Western right-of-way of U.S. Hwy
#371), CROW WING (East of the western right-of-way of U.S. Hwy
#371), ITASCA (East of the western right-of-way of MN Hwy #6), KOOCHICHING (East of a north-south line from the Canadian border to Pelland, the western right-of-way of U.S. Hwy #71 from Pelland to Big Falls & MN Hwy #6), MORRISON (East of the western right-of-way of U.S. Hwy #371 & U.S. Hwy #10 from
Little Falls to the Morrison-Benton County line)
AREA 3 (WESTERN): BELTRAMI, CLEARWATER, HUBBARD, LAKE OF THE
WOODS, MAHNOMEN and the remaining portions of CASS, CROW WING, ITASCA, KOOCHICHING, MORRISON
OPERATOR: Power Equipment
AREA 1
GROUP 2....................$ 30.57 15.25
GROUP 3....................$ 30.02 15.25
GROUP 4....................$ 29.72 15.25
GROUP 5....................$ 26.68 15.25
GROUP 6....................$ 25.47 15.25
AREA 2
GROUP 2....................$ 28.11 15.25
GROUP 3....................$ 27.66 15.25
GROUP 4....................$ 27.36 15.25
GROUP 5....................$ 24.79 15.25
GROUP 6....................$ 23.92 15.25
AREA 3
GROUP 2....................$ 23.45 15.25
GROUP 3....................$ 22.52 15.25
GROUP 4....................$ 22.21 15.25
GROUP 5....................$ 20.50 15.25
GROUP 6....................$ 19.90 15.25
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 2: Crane with over 135' Boom, excluding jib; Dragline
& Hydraulic Backhoe with shovel-type controls 3 cubic yards and over; Grader/Blade finishing earthwork and bituminous.
GROUP 3: Dragline & Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over;
Mechanic; Tandem Scraper; Truck Crane; Crawler Crane
GROUP 4: Bituminous Roller 8 tons & over; Elevating Grader;
Bobcat/Skid Steer Loader over 1 cu yd; Loader over 1 cu yd;
Grader; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Tractor over 50 hp; Bulldozer over 50 hp.
GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber
Tire Roller; Bobcat/Skid Steer Loader up to 1 cu yd; Loader up to 1 cu yd; Tractor 50 hp or less; Bulldozer 50 hp or less.
GROUP 6: Oiler, Crane Oiler
CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;
CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM
UNDERGROUND WORK:
UNNELS, SHAFTS, ETC. - $ .25 PREMIUM
UNDER AIR PRESSURE - $ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
IRON0512-026 05/01/2009
BELTRAMI, CASS, CLEARWATER, COOK, CROW WING, HUBBARD, ITASCA,
KOOCHICHING, LAKE, LAKE OF THE WOODS, MAHNOMEN, PINE
IRONWORKER, REINFORCING AND
STRUCTURAL.......................$ 29.76 19.50
IRON0512-043 05/01/2009
MILLE LACS, MORRISON
IRONWORKER, REINFORCING AND
STRUCTURAL.......................$ 33.80 20.44
LABO0132-037 05/01/2009
LABORER (LANDSCAPE)..............$ 16.70 10.49
LABO0563-036 05/01/2009
AREA 1: PINE
AREA 2A: COOK, LAKE
AREA 2B: ITASCA
AREA 3A: MILLE LACS
AREA 4: BELTGRAMI, CASS, CLEARWATER,CROW WING, HUBBARD,
KOOCHICHING, LAKE OF THE WOODS, MAHNOMEN, MORRISON
LABORERS
AREA 1:
(1) Common or General
Laborer....................$ 27.72 12.03
(2) Mason Tender -
Cement/Concrete............$ 27.92 12.03
(6) Pipelayer..............$ 29.72 12.03
AREA 2A:
(1) Common or General
Laborer....................$ 27.14 11.54
(2) Mason Tender -
Cement/Concrete............$ 27.34 11.54
(6) Pipelayer..............$ 29.14 11.54
AREA 2B:
(1) Common or General
Laborer....................$ 26.10 12.58
(2) Mason Tender -
Cement/Concrete............$ 26.30 12.58
(6) Pipelayer..............$ 28.10 12.58
AREA 3A:
(1) Common or General
Laborer....................$ 23.16 11.39
(2) Mason Tender -
Cement/Concrete............$ 23.36 11.39
(6) Pipelayer..............$ 25.16 11.39
AREA 4:
(1) Common or General
Laborer....................$ 19.78 9.92
(2) Mason Tender -
Cement/Concrete............$ 19.98 9.92
(6) Pipelayer..............$ 21.78 9.92
SUMN2009-089 09/28/2009
TRUCK DRIVER: Straight Truck....$ 16.05 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .