ATT C DRAWINGS PLANS.pdf
PDF 6 MB Posted
- Solicitation number
- AG-4419-S-10-0653
About this file
ATT C DRAWINGS AG-4419-S-10-0653
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT D Davis Bacon.pdf | ||
| SF 1442 AG-4419-S-10-0653.pdf | ||
| ATT B SPECIFICATIONS.pdf | ||
| RFP AG-4419-S-10-0653.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Traverse PC
Ellen Northing Easting
River MN State Plane MN State Plane control North Zone North Zone Elevation stake 2007 adj. 2007 adj. NAVD88 tag # ft ft ft
63 706,916.928 2,366,147.473 1,309.547
64 706,990.753 2,366,115.242 1,309.130
65 707,037.347 2,365,959.552 1,309.243
66 707,085.759 2,365,772.982 1,309.510
67 707,120.453 2,365,684.933 1,309.824
68 707,163.849 2,365,575.876 1,308.922
69 706,866.958 2,366,018.415 1,305.719 70 706,866.235 2,365,934.671 1,305.599
CUT & FILL VOLUMES
Width Depth Length Volume Volume Weight Weight*1.3
Location ft ft ft cubic ft cubic yards tons tons
Cut areas (through the dam - A)
Cut under flat top of dam (wedges) 25 9 35 7,875 292
Cut above the twin pipes (center) 10 9 35 3,150 117
Cut on the downstream slope of dam 25 6 20 3,000 111
Less volume of existing twin 4' pipes 1,430 53
Available fill from cut 12,595 466
Fill areas
Fill from gates into Impoundment to first weir 70 7 20 9,800 363 544 708
Fill on top of cut in dam (A) 70 3 50 10,500 389 583 758
Fill under the floodway ds of dam (B,C,D,E) 80 8 90 57,600 2,133 3,200 4,160
Fill along channel ds of floodway (F) 20 8 20 3,200 119 178 231
Total Fill required 60,800 3,004 4,506 5,857 Total Fill to bring in as stone 5,391
Use 1.5 tons per cubic yard
Use multiple of 1.3 for void fill and sink loss
0 10 20 30 40 50 60 70 80 90 100 110
Horizontal Distance feet
E le v a ti o n fe e t
Underlying mineral soil elevation
Large, first weir in impoundment
Stone 100-yr floodway and step-pool channel
| RadideuCover11.17.2 |
| Pigeon River Construction Design Plans |
| PIGEON RIVER IMPOUNDMENT-1 CONTRACTOR SITE LOCATOR MAP copy |
| PIGEON RIVER IMPOUNDMENT-2 CONTRACTOR Existing Topography at the Site |
| PIGEON RIVER IMPOUNDMENT-3 CONTRACTOR Control Points & Pictures |
| PIGEON RIVER IMPOUNDMENT-4 CONTRACTOR Stone Rapids Cut & Fill Areas |
| PIGEON RIVER IMPOUNDMENT-5 A - A' Steps & Pools Floodway Tops |
| PIGEON RIVER IMPOUNDMENT-6 Machine Storage & Fueling StoneStorage |
| PIGEON RIVER IMPOUNDMENT-7 CONTRACTOR Silt Fencing & Seeding Areas |
File details come from the government source that posted it. Updated .