Q A.doc

DOC document 26 KB Posted

Attached to
RECOVERY - Design Build Services for Trail Bridges
Solicitation number
AG-4419-S-10-0344
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Q A 2.doc DOC document
DB TN.doc DOC document
SOW for trail bridge replacement 4.doc DOC document
DB KY.doc DOC document
locationmaps.zip ZIP file
DB KY.docx DOCX document
Solicitation.pdf PDF
CIM-0860-26T_TimberBridge.pdf PDF
Clauses.doc DOC document
SOW for trail bridge replacement 4.docx DOCX document
DB TN.docx DOCX document
SPS 557.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. The estimated cost of $200,000 to $300,000 referenced in the solicitation, what does that cover? This is the total estimate for the design/build project.

2. What is the overall budget for this project? $200,000 to $300,000

3. With an approximate construction completion date of March 01, 2011, what is the anticipated Notice to Proceed date? Within 30 days of award. Award date is unknown at this time.

4. Is topographic survey data, geotechnical investigation information, and design or fabrication information available for the trail bridges? Topographic survey data is available through USGS. Site specific surveys are not available. Geotechnical investigation is not available. Subsurface geotechnical investigation is not required. The FS standard bridge and FRP bridge design information are available.

5. Is the control datum for the surveys of each Trail Bridge required to be Kentucky or Tennessee State Plane respectfully? Yes

6. Is Hydraulic survey data currently available for each of the Trail Bridges? Hydraulic survey data is not available

7. Have the lengths of the approaches for each Trail Bridge been determined? The lengths of the approaches have not been determined. Approaches are not to exceed 5%.

8. When is the on-site visit or pre-bid tour date and time? The on-site visit will be for those vendors included in the Phase II portion of this project. Date and time TBD.

9. What is the purpose of the two-phase submittal? The Forest Service requires a two-bid process for all design/build projects.

10. Can you clarify the costs for phase one design? There is not a phase one design.

11. Can the due date be pushed back later than January 26, 2010? The due date for phase one will not be extended.

12. What format (SF330 or other) is preferred for the submittal? There is no format for phase one submission.

13. Will there be interviews for the final selection? Interviews are not anticipated.

14. Will As-Built surveys and drawings be required upon completion of construction? As-built drawings are required

15. Will QA/QC Soil and Concrete Testing and Inspection be required for the Project? QA/QC is not required