Section B - Schedule of Items.pdf

PDF 10 KB Posted

Attached to
Recovery* Construction Road Maintenance - North Carolina
Solicitation number
AG-4419-S-10-0285
Issued by

About this file

Section B - Schedule of Items

View the file

Other files

File Type Posted
FBO Pre-Bid Meeting Cancellation.doc DOC document
Section C thru M - Solicitation.doc DOC document
Attachment 2 - Drawings Supplemental Specs.pdf PDF
Atachment 1 - Specifications.pdf PDF
Attachment 3 - Wage Determination.doc DOC document
Section A - SF1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/18/2009

Contract 4071

Road Name 5.7

ITEM NO. DESCRIPTION

METHOD OF

MEASURE

QUANTITY

TYPE

UNIT QUANTITY UNIT PRICE TOTALS

15707 Erosion Control, Hay Bales AQ EA 10.0

20401 Roadway Excavation, Compaction Method (d) Finishing Method (d)

CQ CY 184.0

20420 Drainage Excavation, Rolling Dip

AQ EA 2.0

20701 Earthwork Geotextile type IIA AQ SY 350.0

25102 Riprap (Class 3) AQ Ton 170.0

30105 Subbase,3" Stone Compaction Method A

AQ Ton 362.0

30326 Roadway Reconditioning AQ MI 0.9

25102 Seeding, fertilizing, and mulching, hydraulic method AQ Acre 2.5

63501 Temporary traffic control LSQ LS 1.0

4071 -$

SCHEDULE OF ITEMS

(PUBLIC WORKS)

Length (Miles)NFSR 4071 - Thunderhole

SUB-TOTAL FOR ROAD:

Road No.

As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which direct payment is not provided is a subsidary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. All quantities are Actual Quantities unless specifically designated as a Contract Quantity by "CQ"