Section B - Schedule of Items.pdf
PDF 10 KB Posted
- Solicitation number
- AG-4419-S-10-0285
About this file
Section B - Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO Pre-Bid Meeting Cancellation.doc | DOC document | |
| Section C thru M - Solicitation.doc | DOC document | |
| Attachment 2 - Drawings Supplemental Specs.pdf | ||
| Atachment 1 - Specifications.pdf | ||
| Attachment 3 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/18/2009
Contract 4071
Road Name 5.7
ITEM NO. DESCRIPTION
METHOD OF
MEASURE
QUANTITY
TYPE
UNIT QUANTITY UNIT PRICE TOTALS
15707 Erosion Control, Hay Bales AQ EA 10.0
20401 Roadway Excavation, Compaction Method (d) Finishing Method (d)
CQ CY 184.0
20420 Drainage Excavation, Rolling Dip
AQ EA 2.0
20701 Earthwork Geotextile type IIA AQ SY 350.0
25102 Riprap (Class 3) AQ Ton 170.0
30105 Subbase,3" Stone Compaction Method A
AQ Ton 362.0
30326 Roadway Reconditioning AQ MI 0.9
25102 Seeding, fertilizing, and mulching, hydraulic method AQ Acre 2.5
63501 Temporary traffic control LSQ LS 1.0
4071 -$
SCHEDULE OF ITEMS
(PUBLIC WORKS)
Length (Miles)NFSR 4071 - Thunderhole
SUB-TOTAL FOR ROAD:
Road No.
As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which direct payment is not provided is a subsidary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. All quantities are Actual Quantities unless specifically designated as a Contract Quantity by "CQ"