Attachment 3 - Wage Determination

View the file

Other files

File Type Posted
FBO Pre-Bid Meeting Cancellation.doc DOC document
Section C thru M - Solicitation.doc DOC document
Attachment 2 - Drawings Supplemental Specs.pdf PDF
Atachment 1 - Specifications.pdf PDF
Section A - SF1442.pdf PDF
Section B - Schedule of Items.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NC080010 10/23/2009 NC10

Superseded General Decision Number: NC20070010

State: North Carolina

Construction Type: Highway

Counties: Alleghany, Anson, Ashe, Avery, Beaufort, Bertie, Bladen, Brunswick, Caldwell, Camden, Carteret, Caswell, Chatham, Cherokee, Chowan, Clay, Cleveland, Columbus, Craven, Currituck, Dare, Duplin, Edgecombe, Gates, Graham, Granville, Greene, Halifax, Harnett, Haywood, Henderson, Hertford, Hoke, Hyde, Iredell, Jackson, Johnston, Jones, Lee, Lenoir, Macon, Madison, Martin, McDowell, Mitchell, Montgomery, Moore, Nash, Northampton, Pamlico, Pasquotank, Pender, Perquimans, Person, Pitt, Polk, Richmond, Robeson, Rockingham, Rutherford, Sampson, Scotland, Stanly, Surry, Swain, Transylvania, Tyrrell, Vance, Warren, Washington, Watauga, Wayne, Wilkes, Wilson and Yancey

Counties in North Carolina.

HIGHWAY CONSTRUCTION PROJECTS (does not include tunnels;

building structures in rest areas; railroad construction;

bascule, suspension, spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction; and other major bridges)

Modification Number Publication Date

0 02/08/2008

1 07/25/2008

2 07/24/2009

3 10/23/2009

SUNC1990-002 02/12/1990

Rates Fringes

Carpenter......................$ 7.71

Concrete finisher..............$ 7.64

Ironworker, reinforcing........$ 9.27

Laborers:

_Asphalt raker..............$ 7.25

_Form setter (road).........$ 7.25

_General....................$ 7.25

_Mason (brick, block, stone)...................$ 7.76

_Pipelayer..................$ 7.25

_Power tool operator........$ 7.25

Power equipment operators:

_Asphalt distributor........$ 7.25

_Asphalt paver..............$ 7.25

_Bulldozer (utility)........$ 7.25

_Bulldozer..................$ 7.25

_Concrete finishing machine.$ 9.48

_Concrete grinder...........$ 8.13

_Crane, backhoe, shovel, and dragline

____1 yd. & under..........$ 7.25

____Over 1 yd..............$ 8.53

_Drill operator.............$ 7.65

_Grade checker..............$ 7.25

_Grease person..............$ 7.25

_Hydroseeder................$ 7.25

_Loader.....................$ 7.25

_Mechanic...................$ 8.27

_Milling machine............$ 8.00

_Motor grader (fine grade)..$ 8.01

_Motor grader (rough grade).$ 7.42

_Oiler......................$ 7.25

_Piledriver.................$ 11.00

_Roller (finish)............$ 7.25

_Roller (rough).............$ 7.25

_Scraper....................$ 7.25

_Screed asphalt.............$ 7.25

_Stone spreader.............$ 7.25

_Stripping machine operator.$ 7.25

_Subgrade machine...........$ 9.00

_Sweeper....................$ 7.25

_Tractor (utility)..........$ 7.25

Truck drivers:

_Heavy-duty trucks..........$ 7.25

_Multi-rear-axle trucks.....$ 7.25

_Single-rear-axle trucks....$ 7.25

_Welder.....................$ 9.07

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION