Atachment 1 - Specifications.pdf
PDF 94 KB Posted
- Solicitation number
- AG-4419-S-10-0285
About this file
Attachment 1 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO Pre-Bid Meeting Cancellation.doc | DOC document | |
| Section C thru M - Solicitation.doc | DOC document | |
| Attachment 2 - Drawings Supplemental Specs.pdf | ||
| Attachment 3 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Section B - Schedule of Items.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 1 -
Table of Contents
Table of Contents ............................................................................................................ - 1 - Preface ............................................................................................................................. - 3 - 101 - Terms, Format, and Definitions ............................................................................. - 4 -
101.03 Abbreviations. ................................................................................................. - 4 -
101.04 Definitions....................................................................................................... - 4 -
102 - Bid, Award, and Execution of Contract ................................................................ - 7 - 102 Bid, Award, and Execution of Contract ............................................................... - 7 -
103 - Scope of Work ....................................................................................................... - 7 - Deletions ..................................................................................................................... - 7 -
104 - Control of Work..................................................................................................... - 7 - Deletions ..................................................................................................................... - 7 -
104.06 Use of Roads by Contractor ............................................................................ - 7 -
105 - Control of Material ................................................................................................ - 8 -
105.05 Use of Material Found in the Work. ............................................................... - 8 -
106 - Acceptance of Work .............................................................................................. - 8 -
106.01 Conformity with Contract Requirements. ....................................................... - 8 -
106.07 Delete ............................................................................................................ - 10 -
107 - Legal Relations and Responsibility to the Public ................................................ - 10 -
107.02 Protection and Restoration of Property and Landscape. ............................... - 10 -
107.05 Responsibility for Damage Claims. .............................................................. - 11 -
107.06 Contractor’s Responsibility for Work. .......................................................... - 11 -
107.09 Legal Relationship of the Parties. ................................................................. - 11 -
107.10 Environmental Protection. ............................................................................ - 11 -
108 - Prosecution and Progress ..................................................................................... - 12 - 108 Delete. ................................................................................................................ - 12 -
109 - Measurement and Payment .................................................................................. - 12 - 109 Deletions ............................................................................................................ - 12 -
109.02 Measurement Terms and Definitions. ........................................................... - 12 -
109.02 Measurement Terms and Definitions ............................................................ - 13 -
109.04 Receiving Procedures. ................................................................................... - 13 -
151 - Mobilization......................................................................................................... - 13 - 153 - Contractor Quality Control .................................................................................. - 14 -
153.04 Records. ........................................................................................................ - 14 - 155 - Schedules for Construction Contracts ................................................................. - 14 -
155 Delete. ................................................................................................................ - 14 - 201 - Clearing and Grubbing ........................................................................................ - 14 -
201.01 Description .................................................................................................... - 14 -
201.02 Delete: ........................................................................................................... - 14 -
201.04 Clearing. (c) .................................................................................................. - 14 -
201.06 Disposal......................................................................................................... - 15 -
203 - Removal of Structures and Obstructions ............................................................. - 15 -
203.01 Description. ................................................................................................... - 15 -
203.05 Disposing of Material. .................................................................................. - 15 -
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 2 -
204 - Excavation and Embankment .............................................................................. - 16 -
204.02 Definitions..................................................................................................... - 16 -
204.06 Roadway Excavation .................................................................................... - 16 -
204.07 Subexcavation ............................................................................................... - 16 -
204.11 Compaction. .................................................................................................. - 16 -
204.13 Sloping, Shaping, and Finishing. .................................................................. - 17 - Table 204-2 Construction tolerances. ....................................................................... - 17 -
204.15 Acceptance .................................................................................................... - 18 - Table 204-1 Sampling and Testing Requirements. ................................................... - 18 -
301 - Untreated Aggregate Courses
301.03 General
301.04 Mixing and Spreading
301.05 Compacting
301.06 Surface Tolerance
301.08(b) Plasticity Index
301.08 Acceptance
301.09 Measurement
Table 301-1 Field Density Requirements Table 301-1—Acceptance Sampling and Testing Requirements
303 - Road Reconditioning ........................................................................................... - 23 -
303.04 Shoulder Reconditioning .............................................................................. - 23 -
303.05 Roadbed Reconditioning ............................................................................... - 23 -
303.06 Aggregate Surface Reconditioning ............................................................... - 23 -
635 - Temporary Traffic Control .................................................................................. - 24 -
635.03 General. ......................................................................................................... - 24 -
703 - Aggregate ............................................................................................................. - 24 -
703.05 Subbase, Base, & Surface Course Aggregate. .............................................. - 24 -
705 - Rock ..................................................................................................................... - 14 -
705.02 Riprap Rock. ................................................................................................. - 14 -
713 - Roadside Improvement Material ......................................................................... - 26 -
713.04 Seed ............................................................................................................... - 26 -
713.05 Mulch. ........................................................................................................... - 26 -
718 - Traffic Signing and Marking Material................................................................. - 27 -
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 3 -
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 4 -
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 5 -
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 6 -
Figure 101-1—Illustration of road structure terms.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 7 -
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 8 -
105 - Control of Material
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 9 -
If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price.
Four methods of determining conformity and accepting work are described in Subsections
106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 10 -
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.02_0811_us_12_14_2004
107.02 Protection and Restoration of Property and Landscape.
Add the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented.
Follow all requirements of Section 157.
Monitor the National Weather Service forecast. Do not commence land disturbing activities if within the next 24 hours there is a fifty percent chance of precipitation with rainfall amounts greater than ¼ inch.
Stabilize all embankments higher than 4 feet vertical and all disturbed areas within 25 feet of protected streams with temporary ground cover at the end of each workday.
Temporary ground cover consists of mulch sufficient to completely cover the disturbed area.
Complete all protected stream culvert installations as soon as possible; preferably within the same day of initial disturbance.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 11 -
Apply final seeding and fertilizer under section 625 within 10 days of initial disturbance for all fills over 4 feet vertical and within 25 feet of all protected stream courses.
At designated locations place 3 inch rock a minimum 6 inches deep across the road prism for at least 50 feet down the centerline to provide a construction entrance.
Remove sediment from behind temporary silt fences when the depth is greater than 6 inches.
Prior to suspending work on the project for periods longer than 7 days assure that all temporary erosion control measures are in place. During work suspension maintain temporary erosion control measures in a working condition.
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 12 -
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 13 -
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.02_0811_us_07_27_2005
109.02 Measurement Terms and Definitions
Add the following under subsection (1) Cubic yard in place:
(d) Compute the quantity by means of a computer generated digital terrain model.
109.04_0811_us_12_14_2004
109.04 Receiving Procedures.
Delete the section and add the following:
When the method of measurement requires weighing in the hauling vehicle, furnish a person to direct the spreading and distribution of material and to record the location and placement of the material on the project. During the placement, maintain a record of each delivery and document it in an acceptable manner. Include the following information:
a) Project identification
b) Truck identification
c) Drivers Name and original signature
d) Date and time weighed
e) Gross and net mass
f) Daily total for each truck
Use an approved format for the delivery record(s). Furnish the original record(s) and a written certification of the delivery of the material at the end of each week.
151 - Mobilization
151.03_nat_us_08_05_2005
151.03 Payment
Delete the entire subsection and add the following:
151.03 Payment
Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 14 -
153 - Contractor Quality Control
153.04_nat_us_10_24_2007
153.04 Records.
Delete all but the first sentence
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
201 - Clearing and Grubbing
201.01_nat_us_02_18_2005
201.01 Description
Replace with the following
This work consists of clearing and grubbing within clearing limits and other designated areas.
201.02 Delete:
Delete Tree wound dressing material reference.
201.03 General.
Delete the last sentence.
201.04 Clearing.
Delete the last sentence of (d).
201.04_nat_us_02_22_2005
201.04 Clearing. (c)
Delete paragraph (c) and replace with the following:
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 15 -
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract.
201.06_nat_us_02_23_2005
201.06 Disposal.
Delete the first sentence of this subsection and substitute the following:
All merchantable timber within the clearing limits on either private or Government land remains the property of the landowners. Deck according to 201.04(f) on each owner's property adjacent to the road in approved locations.
203 - Removal of Structures and Obstructions
203.01_nat_us_02_25_2005
203.01 Description.
Delete and replace with the following:
This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
203.05_nat_us_02_18_2005
203.05 Disposing of Material.
Add the following:
(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toeline of embankment slopes. Do not permit the top of the windrows to extend above subgrade.
Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 200 feet in a windrow.
Do not place windrows against trees. Obtain approval for pioneer roads. A pioneer road may be constructed to provide an area for placement of windrows, provided the excavated material is kept within the clearing limits and does not adversely affect the road construction.
203.08_nat_us_02_24_2005
203.08 Payment
Add the following:
Disposal of construction slash will be compensated under the designated pay item in Section 201.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 16 -
204 - Excavation and Embankment
204.02_0811_us_12_22_2004
204.02 Definitions
Delete subsection (2) Subexcavation
204.05_nat_us_02_18_2005
204.05 Conserved Topsoil
Delete the entire paragraph.
204.06 Roadway Excavation
(b) Rock Cuts.
Delete the first sentence and replace with the following
When blasting rock is allowed, use blasting methods according to Subsection 205.08
204.07 Subexcavation
Delete the subsection in its entirety:
204.11_nat_us_04_11_2005
204.11 Compaction.
Delete the first paragraph and replace it with the following:
For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.
Add the following compaction methods:
(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer until no displacement occurs. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 17 -
204.13_nat_us_03_02_2005
204.13 Sloping, Shaping, and Finishing.
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.
Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.
For unsurfaced roads, use one of the following methods to finish the roadbed:
(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until visible displacement ceases.
(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.
Add Table 204-2—Construction Tolerances:
Table 204-2 Construction tolerances.
Tolerance Class(a)
A B C D E F G H I J K L M Roadbed width (ft) +0.5 +0.5 +1.0 +1.0 +1.0 +1.0 +1.5 +1.0 +2.0 +2.0 +2.0 +2.0 +2.0
Subgrade elevation
(ft)
+0.1 +0.2 +0.2 +0.5 +0.5 +1.0 +1.0 +1.5 +2.0 +3.0 +2.0 +3.0 (c)
Centerline alignment (ft)
+0.2 +0.2 +0.5 +0.5 +1.0 +1.0 `+1.5 +1.5 +2.0 +3.0 +3.0 +5.0 (c)
Slopes, excavation, and embankment (% slope(b)
+3 +5 +5 +5 +5 +5 +10 +10 +10 +10 +20 +20 +20
a. Maximum allowable deviation from construction stakes and drawings.
b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 18 -
c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.
204.15_nat_us_02_07_2007
204.15 Acceptance
Table 204-1 Sampling and Testing Requirements.
Add the following note to the table:
(2) When compaction methods (d) or (e) are used AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.
FP – 03 Supplemental Specifications Thunderhole Road Repairs 19
301 - Untreated Aggregate Courses
301.03_0811_us_08_12_2007
301.03 General.
Add the following:
Request approval in writing of the roadbed before placing aggregate.
If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.
301.04 Mixing and Spreading.
Delete the first two sentences of the first paragraph and add the following:
Adjust the moisture content to obtain a uniform mixture with a moisture content within 2 percent of the optimum moisture content. Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
Route and distribute hauling and leveling equipment over the width and length of each layer.
301.05 Compacting.
Delete the first and third paragraphs and add the following:
Compact the aggregate using one of the following methods as specified:
(a) Compaction Method A. Ensure that moisture content is suitable for compaction. Add water or dry material if required. Compact the aggregate by operating spreading and hauling equipment over the entire width until no visible displacement is noticed.
(b) Compaction Method C. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 99, method C or D.
(c) Compaction Method D. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.06 Surface Tolerance.
FP – 03 Supplemental Specifications Thunderhole Road Repairs 20
Thickness and Width requirements:
The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.
The maximum variation from the specified width will not exceed +12 inches at any point.
The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.
301.08(b) Plasticity Index.
Add the following to the first sentence: “and under 703.05(c)(1)”.
301.08 Acceptance
Delete the second paragraph and add the following:
Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04. Other aggregate quality properties will be evaluated under 106.02 and 106.04.
301.09 Measurement.
Delete the second and third paragraphs and add the following:
FP – 03 Supplemental Specifications Thunderhole Road Repairs 21
Table 301-1 Field Density Requirements.
Table 301-1: Delete laboratory and field density requirements for base, subbase, and surfacing and replace with the following:
Material or Product
Type of Acceptance (Subsection)
Characteristi c
Category Test Methods Specification s
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
NC ABC Measured and tested conformance (Subsection 106.04)
Moisture Density
Method C-1 --- R-1 Marshall “ “ “ Before using in work
Method D --- AASHTO T 180 “ “ “ “
Method D-1 --- R-1 Marshall “ “ “ “
Compaction
Method C, C-1, D, D-1
--- AASHTO T 310 or other approved procedures
1 per 500 t In-place --- Before placing the next layer
FP – 03 Supplemental Specifications Thunderhole Road Repairs 22
Table 301-1: Add the following:
Table 301-1—Acceptance Sampling and Testing Requirements.
Material or Product
Type of Acceptance (Subsection)
Characteristi c
Category Test Methods Specification s
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
NC ABC Measured and tested conformance
(Subsection 106.04)
Plastic Limit - AASHTO T 90 1 per each 1,000 T
From the windrow or roadbed after processing
Yes 4 Hours
Table 301-1—Acceptance Sampling and Testing Requirements.
Material or Product
Type of Acceptance (Subsection)
Characteristi c
Category Test Methods Specification s
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Aggregate Width Measured and tested conformance
(Subsection 106.04)
Width - - 4 per each 0.5 mi
Roadbed after processing
- 4 Hours
Aggregate Thickness Measured and tested conformance
(Subsection 106.04)
Thickness - - 4 per each 0.5 mi
Roadbed after processing
- 4 Hours
Additive Measured and tested conformance
(Subsection 106.04)
Amount of Additive - 1 per each 1,000 T
From the windrow or roadbed after processing
No 4 Hours
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 23 -
303 - Road Reconditioning
303.04_0811_us_06_08_2005
303.04 Shoulder Reconditioning
Delete the subsection and replace it with the following:
Repair soft and unstable areas by subexcavating material the greater of 6 inches or to the bottom of the irregularity. Prevent unsuitable material from becoming mixed with the backfill. Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with suitable material. Compact the material, reshape shoulders, and dispose of waste according to Subsection 204.11.
303.05 Roadbed Reconditioning
Delete the subsection and replace it with the following:
Repair soft and unstable areas by subexcavating material the greater of 6 inches or to the bottom of the irregularity. Prevent unsuitable material from becoming mixed with the backfill. Backfill the subexcavation with topping or other suitable material. Remove all organic, deleterious, or oversize material larger than 6 inches from the top 6 inches of the subgrade. Dispose of waste according to Subsection 204.14. To remove surface irregularities that cannot be graded out to their full depth, scarify to a 6-inch depth and remove surface irregularities. Shape to provide a uniform surface. Finish earth surfaces to within 0.05 feet and rock surfaces to within 0.10 feet of the required line, cross section, and grade. Compact according to Subsection 204.11.
303.06 Aggregate Surface Reconditioning
Delete the subsection and replace it with the following:
Repair soft and unstable areas to the full depth of the aggregate surface by subexcavating material to the greater of 6 inches or to the bottom of the irregularity. Prevent unsuitable material from becoming mixed with the backfill. Backfill the subexcavation with topping or other suitable material. To remove surface irregularities that cannot be graded out to their full depth, scarify them to the depth of the aggregate surface or to a depth of 8 inches, whichever is less, and remove surface irregularities. Reshape, finish, and compact according to Subsection 204.11.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 24 -
635 - Temporary Traffic Control
635.03_nat_us_05_13_2004
635.03 General.
Add the following:
Install temporary traffic control signs to temporary posts or approved temporary sign mounts.
703 - Aggregate
703.00_0811_us_12_17_2004
703.05 Subbase, Base, & Surface Course Aggregate.
Add the following gradations for railroad ballast:
Railroad ballast stone:
Percent mass passing sieve
AASHTO
M-43 Size
4-in. 3 ½ in 3 in 2 ½ in 2 in 1 ½ in 1 in ¾ in
1 100 90 to
-------- 25 to
--------- 0 to 15 --------- 0 to 5
2 -------- -------- 100 90 to
35 to 70 0 to 15 ------- 0 to 5
Add the following table:
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 25 -
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 26 -
705 - Rock
705.02_0811_12_17_2004
705.02 Riprap Rock
Replace table 705-1 with the following:
TABLE 705-1
REQUIRED STONE SIZES - INCHES
CLASS MINIMUM MIDRANGE MAXIMUM
A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 3 14 18 28
No more than 5.0% of the material furnished can be less than the minimum size specified nor no more than 10.0% of the material can exceed the maximum size specified.
713 - Roadside Improvement Material
713.04_0811_us_05_04_2007
713.04 Seed
Add the following:
Furnish a product certification for each kind or type of seed, certifying that the seed was tested by a recognized laboratory within 6 months of the date of delivery. Include the following:
(1) Name and address of testing laboratory
(2) Date of test
(3) Seed identification
(4) Test results showing the percentages of purity, germination, and weed content
(5) Certified weed-free seed.
713.05_nat_us_03_02_2005
713.05 Mulch.
Assure that mulch used on the project is certified noxious weed free by the appropriate authority in the jurisdiction of use.
FP – 03 Supplemental Specifications Thunderhole Road Repairs - 27 -
718 - Traffic Signing and Marking Material
718.05_nat_us_02_25_2008
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.