AG-3D47-S-08-0005
NFHR Paving Solicitation
North Fork Hughes River Recreation Facilities 005-1 Harrisville, West Virginia Construction Package 11
Construction Specification 5—Pollution Control
1. Scope The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2. Material All material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
(210-VI-NEH, May 2001)
POLLUTION CONTROL
North Fork Hughes River Recreation Facilities 005-2
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to dispose of chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. At the completion of the construction work, sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
North Fork Hughes River Recreation Facilities 005-3
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
North Fork Hughes River Recreation Facilities 005-4
8. Items of work and construction details
Items of work to be performed in conformance with this specification and construction details therefore are:
a. Subsidiary Item, Pollution Control
(1) This item shall include all materials, equipment, and labor required to perform the necessary pollution control measures.
(2) The contractor shall exercise precaution throughout the duration of the Contract to prevent the pollution of rivers, streams, and other bodies of water. Chemicals, fuels, lubricants, raw sewage, and other harmful wastes shall not be discharged into or alongside any river, stream, or natural or man-made waterway leading thereto. The Contractor shall not locate sanitary facilities refueling, fuel storage, chemical storage or equipment maintenance areas within 200 feet of any body of water. Materials identified as chemical pollutants in Section 4 of this Specification shall be removed from the site and disposed of in compliance with applicable state and federal regulations. Any chemical pollutant spills shall be reported to the State Center for Pollution, Toxic Chemical and Oil Spills hotline at 1-(800)-642-3074.
(3) The Contractor shall not be required to submit a written pollution control plan.
(4) The Contractor shall schedule any clearing and grubbing operations in a manner which will minimize the amount of erodible surface soil exposed at any time. Areas shall not be cleared and grubbed until immediately prior to actual need or use of the area, unless pollution control measures have been installed below the area or provisions have been made to provide protective cover to the exposed area immediately thereafter.
(5) Pollution control measures shall be installed in a timely manner to protect against erosion from areas to be exposed by excavation, borrow, and fill operations.
(6) Equipment shall not be operated in live streams except as may be required to construct channel changes and temporary or permanent structures located in live streams. Frequent fording of live streams with construction equipment will not be permitted.
Temporary bridges, culverts, or other structures shall be installed wherever an appreciable number of stream crossings are necessary.
7/8/2008
North Fork Hughes River Recreation Facilities 005-5
(7) Protective cover shall be applied to disturbed areas as soon as work has been completed in the area, and/or whenever work in the disturbed area will be delayed or stopped more than five (5) continuous days. Areas to be provided with protective cover will be staked and/or flagged in the field by the Contracting Officer's Technical Representative (COTR). Protective cover shall be applied to disturbed areas by mulching with straw, or by seeding and mulching with straw. Materials and workmanship for providing protective cover shall be in accordance with Construction Specification 6, Seeding, Sprigging and Mulching.
In areas that are excessively rough or steep, as determined by the COTR, seedbed preparation will consist of applying fertilizer then tracking up and down the slope with crawler equipment. In areas too wet for crawler equipment to operate, as determined by the COTR, no seedbed preparation will be required.
Straw mulch shall be applied uniformly to disturbed areas which have been seeded at the rate of 2 tons per acre and to disturbed areas which are not seeded at the rate of 3 tons per acre.
Straw mulch shall be anchored by applying a non-asphaltic tackifier consisting of free flowing silicate powders with hydrophyllic polymer additives. The tackifier shall be mixed in water and applied to the straw mulch cover according to the manufacturer's recommendations.
The contractor shall submit in writing to the Contracting Officer a request for approval of the selected non-asphaltic type tackifier. The request shall include sufficient descriptive information (manufacturer's specifications) to allow a determination of acceptability and suitability to be made.
Asphalt emulsion tackifier may be substituted at the rate of 100 gallons per acre.
(8) Section 7 shall not apply. No separate payment shall be made for Pollution Control.
Compensation for this item will be included in the payment for Bid Items 5 and 6, Hot-Mix Asphalt Paving.
7/8/2008