AMENDMENT NO. 1 TO SOLICITATION SF-30
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
PAGE OF PAGES
1 | 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
07/08/2008
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable) NFHR Paving
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
CODE
USDA, Natural Resources Conservation Service 75 High Street, Room 301 Morgantown, WV 26505
Same as block 6.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.
X
AG-3D47-S-08-0005
9B. DATED (SEE ITEM 11)
06/13/2008
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 11)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ___1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE - MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
North Fork Hughes River, Paving Project Ritchie County, West Virginia
SEE CONTINUATION SHEET FOR DETAILS
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)
AMY D. BOLYARD
15B. CONTRACTOR/OFFEROR
_ (Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
07/08/2008
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No.1 Continuation Sheet
North Fork Hughes River
Paving
Solicitation No. AG3D47S080005
This amendment transmits the Changes to the Construction Specifications and Contract Provisions.
1. Changes to Construction Specifications
The following is a list of the specifications revised by this amendment. Please replace the following Construction Specifications in your Solicitation Package. All other specifications not indicated below remain the same.
Change to Construction Specifications
Specification No. Title
5 POLLUTION CONTROL
6 SEEDING, SPRIGGING, MULCHING
7 CONSTRUCTION SURVEYS
8 MOBILIZATION AND DEMOBILIZATION
9 TRAFFIC CONTROL
10 WATER FOR CONSTRUCTION
94 CONTRACTOR QUALITY CONTROL
Change to Constructi e on Specifications Single Us Specification No. Title
407 WVDOH HOT‐MIX ASPHALT
450 AGGREGATE BASE COURSE
CONTINUATION SHEET FOR SF‐30
NORTH FORK HUGHES RIVER‐PAVING PROJECT
AMENDMENT NO. 1
AG‐3D47‐S‐08‐0005
2. Changes to Solicitation Package/Contract Provisions
The items listed below have changed in the solicitation package. Please replace the following Original Section A thru M document in the Solicitation with the Revised Section A thru M document in this Amendment.
Change to Solicitation Package Section B Supplies or Services/Prices B.1, Bid Schedule
Change in Bid Schedule Items Addition of Alternate Bid Items Found on page 3 of 46
Section F Deliveries Or Performance Addition of F.4, Exception to Variation in
Quantity Clause for Bid Items related to Construction Specification 450 Found on page 7 of 46
Section H Special Contract Requirements Items renumbered due to addition of clauses (pages 9 thru 18 of 46) Addition of AGAR 452.21573 Post Award
Conference (Nov 1996) Clause (see H.1) Found on page 9 of 46 Section H Special Contract Requirements
Addition of Work Performance on Holidays (see H.8) Found on page 11 of 46
Section M Evaluation Factors for Award Addition of M.1, AGAR clause 452 .23670
Additive or Deductive Items Clause (APR 2005) Found on page 46 of 46
| NFHR Paving |
| X |
| AG-3D47-S-08-0005 |
| AG 3D47 S 08 0005.ContinuationSheet.Amend 1.pdf |
| Amendment No.1 |
File details come from the government source that posted it. Updated .