Attchmnt 1 WTP Amndmnt 5.doc
DOC document 31 KB Posted
- Attached to
- Construct Water Treatment Plant
- Solicitation number
- AG-32KW-S-09-0231
About this file
Attachment 1 Q A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CvrPg Amendment5 WaterTrmtPlnt.pdf | ||
| CvrPg Amendment4 WaterTrmtPlnt.pdf | ||
| Attch1WageRateHidalgoTX.doc | DOC document | |
| CvrPg Amendment3 WaterTrmtPlnt.pdf | ||
| Plan Holders List | — | |
| Attachment 3.pdf | ||
| Attachment 1.pdf | ||
| Attachment 2 .doc | DOC document | |
| Solicitation Cover Pages1-3S-09-02314Water Trmt.pdf | ||
| Attch1WageRateHidalgoTX.doc | DOC document | |
| Atch2-BidBondMAB-WTP.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: AG-32KW-S-09-0231
Amendment #05 Attachment #1
QUESTIONS AND ANSWERS
PROJECT: USDA, MOORE AIR BASE WATER TREATMENT PLANT
Moore Air Base, Edinburg, TX
General
This is a tax exempt project. Contractors will not be required to pay sales tax on this project.
The Government will make a determination of the successful Bidder based on Best Value. Proposers may submit suggestions on cost effective alternatives to the bid documents.
Sheet 23 of the Drawings shows Alternate No. 1 for a larger (Minimum 44,000 gallon) Storage Tank. Proposers shall submit additional cost information for this Alternate.
Specifications Page 17100-2 1.4 Requires Project wide loop drawing submittal. Since the equipment specified is Siemens, the standard Siemens submittal acceptable.
Page 17520-5 Item 3.3 C. implies a factory witnessed test. A factory witnessed test is not required; however, a certificate of testing is required.
Plans Sheet 7: the scale should be 1”= 20’ not 1” = 40’
Sheet 7: the high service discharge line should read 6” not 4”
Sheet 14: the drainwell with cover is 21” not 20”
Sheet 15: the 6” PVC sanitary sewer line should read 4”
Sheet 17: in Mech. Room 106, “A/C” should be “W/H”
Sheet 17: Acoustical ceiling is to be place in the office as shown. All other ceiling areas are to be 5/8” CDX plywood.
Sheet 22: the transfer line feeding the ground storage tank should be 4” not 6”