Attch1WageRateHidalgoTX.doc
DOC document 44 KB Posted
- Attached to
- Construct Water Treatment Plant
- Solicitation number
- AG-32KW-S-09-0231
About this file
Revised Wage Rates Hidalgo TX
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attchmnt 1 WTP Amndmnt 5.doc | DOC document | |
| CvrPg Amendment5 WaterTrmtPlnt.pdf | ||
| CvrPg Amendment4 WaterTrmtPlnt.pdf | ||
| CvrPg Amendment3 WaterTrmtPlnt.pdf | ||
| Plan Holders List | — | |
| Attachment 2 .doc | DOC document | |
| Attachment 3.pdf | ||
| Attachment 1.pdf | ||
| Atch2-BidBondMAB-WTP.pdf | ||
| Solicitation Cover Pages1-3S-09-02314Water Trmt.pdf | ||
| Attch1WageRateHidalgoTX.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-32KW-S-09-0231
Attachment 1
GENERAL DECISION: TX20080006 07/24/2009 TX6
Date: July 24, 2009
General Decision Number: TX20080006 07/24/2009
Superseded General Decision Number: TX20070006
State: Texas
Construction Types: Building and Residential
Counties: Cameron and Hidalgo Counties in Texas.
BUILDING AND RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and garden apartments up to and including 4 stories).
Modification Number Publication Date
0 02/08/2008
1 07/25/2008
2 07/24/2009
* SUTX1990-013 05/01/1990
Rates Fringes
BOILERMAKER
RESIDENTIAL CONSTRUCTION
ONLY........................$ 16.35 2.315
BRICKLAYER
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
CARPENTER (Including Drywall
Hanging and Acoustical
Ceiling Installation)
BUILDING CONSTRUCTION ONLY
Excluding Batt Insulation..$ 7.25
CARPENTER
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
CEMENT MASON/CONCRETE
FINISHER (Excluding Form
Setting)
BUILDING CONSTRUCTION ONLY..$ 7.25
CEMENT MASON/CONCRETE FINISHER
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
ELECTRICIAN
BUILDING CONSTRUCTION ONLY..$ 8.30
Electricians: (Residential)
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
FLOOR LAYER: CARPET (SOFT)
FLOOR
BUILDING CONSTRUCTION ONLY..$ 7.25
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
Insulation Installer
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
IRONWORKER, REINFORCING
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
Laborer, common
BUILDING CONSTRUCTION ONLY..$ 7.25
LABORER
RESIDENTIAL CONSTRUCTION
ONLY
Pipelayer..................$ 7.25
Unskilled..................$ 7.25
PAINTER (Including Drywall
Finishing, Taping, and
Bedding)
BUILDING CONSTRUCTION ONLY..$ 7.25
PAINTER
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
PIPEFITTER (Including HVAC
Work)
BUILDING CONSTRUCTION ONLY..$ 7.28 .12
Plasterer tender
BUILDING CONSTRUCTION ONLY..$ 7.25
PLASTERER
BUILDING CONSTRUCTION ONLY..$ 8.41
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
PLUMBER (Excluding HVAC Work)
BUILDING CONSTRUCTION ONLY..$ 7.50 .48
Plumbers and Pipefitters
RESIDENTIAL CONSTRUCTION
ONLY........................$ 8.20
Power equipment operators:
BUILDING CONSTRUCTION ONLY
Backhoe....................$ 7.25 .48
RESIDENTIAL CONSTRUCTION
ONLY
Backhoe....................$ 7.25
Grader.....................$ 7.25
Loader.....................$ 7.25
ROOFER, Including Built Up, Composition and Single Ply
Roofs
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
Sheet metal worker
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
Sheet Rock Installer
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
SHEETMETAL WORKER (Including
HVAC duct Work)
BUILDING CONSTRUCTION ONLY..$ 7.25
TILE SETTER
BUILDING CONSTRUCTION ONLY..$ 7.25
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
TRUCK DRIVER
BUILDING CONSTRUCTION ONLY..$ 7.25
RESIDENTIAL CONSTRUCTION
ONLY........................$ 7.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .