AG2B46S170010_Mod_4.pdf
PDF 88 KB Posted
- Attached to
- Concorde Restoration Service in MO
- Solicitation number
- AG-2B46-S-17-0010
About this file
Amendment 4: Edit specification 6, item 7
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Concorde Land, LLC WRP Restoration NRCS-Missouri 6-5 3/27/2017 necessity to meet the requirements of the plantings listed above. Seed shall be furnished in amounts that equal or exceed the following rates per acre:
Pure Live Seed Species Variety Rate (lbs. per ac.)
Big Bluestem Kaw 8.4 Indiangrass Cheyenne 2.3 Eastern Gamagrass PMK-24 4.8 Switchgrass Kanlow 1.4 Alfalfa 2.3 Native Forb Mix 2.3
Seeding Dates:
March 16 through June 30 November 16 through March 15
(8) Broadcast seed uniformly and cover ⅛ to ¼ inch deep with a cultipacker. Seeding operation shall be performed immediately after seedbed preparation, if seeding dates permit.
(9) At all other times, all operations including mulching and companion crop will be performed except sowing the seed. Seeding will be done with No-till drill at a depth of ⅛ to ¼ inch during the next seeding period as seeding dates permit. No-till drilled rates remain standard. Vegetation shall be killed with a chemical burn down consisting of glyphosate, 2,4-Dichlorophenoxyacetic acid (2,4-D) and surfactant according to manufacture’s label.
(10) Mulch shall be small grain straw relatively free of weed seed. The mulch shall be applied uniformly over the designated area at a rate of 1.5 tons per acre. Anchor mulch with: (1) mulch tacker into the top one [1] inch of soil, or (2) wood cellulose fibertack or a water dispersible mulch tacker following manufacturer's recommendations, or (3) commercial mulch nets or excelsior blankets. Only Option (2) or (3) shall be permitted in areas that are hydro-seeded. Wood cellulose fibertack or excelsior blankets may be used in lieu of grain straw following manufacturer's recommended rates and are permitted in areas that are hydro-seeded.
(11) Insofar as practical, all operations shall be performed on the contour.
(12) Payment shall be made by Method 1. This payment will constitute full compensation for the completion of the work.
| CS006_IOWCD_Seeding_pg6-5_Concorde_amendment 4.pdf |
| CS006_IOWCD_Seeding_Concorde.pdf |
| Dikes, floodways and disturbed areas as determined by Engineer |
| Pure Live Seed |
| Big Bluestem Kaw 8.4 |
| Seeding Dates: |
| CS252.pdf |
| CS252.pdf |
| CS 252 Sec 7 |
| Where such over-excavation is directed by the Engineer to remove unsuitable material |
| Where the unsuitable condition is not a result of the Contractor's improper construction operations as determined by the Engineer. |
File details come from the government source that posted it. Updated .