Telecom Remodel-FINAL.pdf

PDF 733 KB Posted

Attached to
Telecommunication Wiring Upgrades
Solicitation number
AG-05G1-S-11-0021
Issued by

About this file

Project Drawings

View the file

Other files

File Type Posted
Amend 3.pdf PDF
Amend 2.pdf PDF
Amend 1.pdf PDF
270000ATelecommunicationsWiringSystem.pdf PDF
023180 - Excavation and Backfill.pdf PDF
telecommunications 0021.pdf PDF
260050_BasicMethodsAndMaterials-20110507.pdf PDF
WA100077 07012011.pdf PDF
260400-UindergroundControlCablePowerDist-20110512.pdf PDF
260010_General-Technical-Provisions-20110407.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEWPORT

WASHINGTON

JCCC

CURLEW

FALLS

FALLS

METALINE

REPUBLIC

COLVILLE

KETTLE

NORTHPORT

IONE

CHEWELAH

SPOKANE

COLVILLE NATIONAL FOREST

TO

N

EW

PO

R T

M

IL

ES

CANADA

SULLIVAN

LAKE

ID

A

H O

60 M

ILES

TO COLVILLE

G-1 TITLE SHEET

A-1 BUILDING #2212

A-2 BUILDING #2005

T-1 TELECOM DETAILS

T-2 TELECOM DETAILS

NEWPORT R.D. TELECOMMUNICATION WIRING UPGRADES OPTIONS

OPTION 1: Install Underground Fiber Optic Cable and Conduit between

Buildings #2005 and #2212. Including installing rack mount fiber optic patch panels in both buildings.

OPTION 2: Upgrading the telecommunication wiring in Building #2005.

Includes, demolition of Existing Telecommunication CAT3 wiring in Building #2005, installing new CAT6 wiring, wall outlets, and patch panels.

VICINITY MAP

NTS

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE - REGION SIX

COLVILLE NATIONAL FOREST

DRAWINGS FOR PROPOSED

J. Knutson 08/11

PROJECT

J. Knutson 08/11

PANEL "B"

PANEL "A"

MEN

WOMEN

L-1

L-1

BSMT.

D E F D E

A CB

C

H

A

B

C

B

C

B

A

I

G

H G

H

F

I

F

D

E

A

G

Room 71 Room 72

Room 73 Room 70

N

SCALE: 3/16" = 1'-0"

0 2 Ft. 4 Ft.1 Ft.

1 BLDG #2212 - MAIN FLOOR - PLAN VIEW

NOTES:

1. Remove all existing wall outlets, jacks & CAT3 wiring throughout the building. All removed items, not scheduled for reuse become property of the contractor and shall be disposed of off Government property.

2. Install one 24-port patch panel and one 48-port patch panel, and cable mangement on the equipment rack in the basement, as shown in the detail drawings.

3. Each jack location is to have 2 or 4 CAT6 Jacks and CAT6 homeruns to patch panel in equipment rack. 25 outlets will have 2 jacks, and 5 outlets will have 4 jacks.

4. OPTION ITEM 01 - Install new fiber optic patch panel on the equipment rack in the basement.

Room 09

Room 08

Room 10Room 11

Room 12

Room 07Room 06 Room 05

Room 14 Room 15

Room 16

Room 18

Room 01

A

E D

C

B

A

ABA

A

C

BB

A

BC

C

A

B

A

A B C

D C

C D

A B

E

D C

B A

G

H

F

E

D

C B

A

E

A B

C

EXIST. PANEL "D"

EXIST. PANEL "E"

Room 02

S

TA

IR

S

SHELVES

Basement Room

EXIST. ELEC. PANELC

ra w l S pa ce u nd er th e re st o f t he b as em en t.

B

B

A

C

D

D

1 N

SCALE: 3/32" = 1'-0"

0 4 Ft. 8 Ft.2 Ft.

NOTES:

1. All work in Buildng #2005 is Option Item 02

2. Remove all existing wall outlets & CAT3 wiring throughout the building.

3. All removed items, not scheduled for reuse become property of the contractor and shall be disposed of off Government property.

4. Each jack location is to have 2 or 4 CAT6 Jacks and CAT6 homeruns to patch panel in equipment rack. 40 outlets shall have 2 jacks, and 14 outlets shall have 4 jacks.

5. Install three 48-port patch panel on the equipment rack, as shown in the detail drawings.

6. Install raceways and J-hooks in the space between floor joists.

7. Demolish the ceiling in the basement room for wiring installation.

8. All new telecom equipment will be installed on the Governement installed four-post wall-mount rack in the basement room.

9. OPTION ITEM 01 - Install new fiber optic patch panel in the basement.

BLDG #2005 - MAIN FLOOR - PLAN VIEW

BLDG #2005 - BASEMENT - PLAN VIEW

SCALE: 3/32" = 1'-0"

0 4 Ft. 8 Ft.2 Ft.

Government Installed 24"x24" Four-post Equipment Rack

Lightning Protection System 25-pair

New Entrance for Fiber Optic Cable

SCALE: AS SHOWN2 EQUIPMENT RACK DETAILS - BLDG #2212

SCALE: NONE1 EQUIPMENT RACK DETAILS - BLDG #2005 - OPTION ITEM 02

NOTES:

1. EACH JACK LOCATION TO HAVE 2-CAT 6 JACKS AND CAT 6

HOMERUNS TO PATCH PANEL IN EQUIPMENT RACK, EXCEPT AS

SHOWN ON THE PLANS

STORM DRAIN

TANKERFILL STATION

CITY WATER METER

6"5' D E

E P

W

8" W

SIGN

4-foot long sweep elbow

New conduit for fiber and 25-pr

N

OPTION ITEM 01 - Inter-Building Connection

SCALE: 1" = 30'

MINMIN

FIBER OPTIC CONDUIT

3"

24" MAX

12" 3"3"

SCALE: AS SHOWN2 TRENCH DETAIL - CLASS A

MINMIN

FIBER OPTIC CONDUIT

3"

24" MAX

12" 3"3"

SCALE: AS SHOWN3 TRENCH DETAIL - CLASS D

File details come from the government source that posted it. Updated .