ConstructionRFQ_15-0009.pdf

PDF 352 KB Posted

Attached to
Plumbing Repairs - Tiller Ranger District
Solicitation number
AG-04N7-S-15-0009
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
Return_Packet_15-0009.docx DOCX document
SeparateDocuments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ X IS IS NOT A SMALL BUSINESS SET- ASIDE 1 60

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

AG-04N7-S-15-0009 1/20/2015 Req # 729661

AAP # 06SO151558664

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date) USDA Forest Service Rogue River-Siskiyou National Forest 3040 Biddle Road Medford, OR 97504-4119

See Schedule

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER X OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

Linda Harmon – Contracting Kayli Barber - Engineering

618-2021 957-3206

a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS @ 4:30 p.m.

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.

This request does not commit the Government to pay any costs incurred in the preparation of the

2/20/2015 This is not a public opening.

submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

(a) (b) (c) (d) (e) (f)

PLUMBING REPAIRS -TILLER

RANGER STATION RENOVATION

TILLER RANGER DISTRICT

UMPQUA NATIONAL FOREST

DOUGLAS COUNTY, OREGON

SEE SECTION B –

SCHEDULE OF ITEMS

Price Range: Between $25,000 and $100,000

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE

NOTE: Additional provisions and representations x are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AG-04N7-S-15-0009

Plumbing Repairs – Tiller Ranger District

Umpqua National Forest

TABLE OF CONTENTS

Request for Quotation – Standard Form 18 1

Table of Contents 2

Schedule of Items 3-4

Notes to Contractor 5

Section C – Description/Specification/Work Statement 6-9

Section D – Packaging and Marking 10

Section E – Inspection and Acceptance 11-13

Section F – Deliveries and Performance 14-15

Section G – Contract Administration Data 16-17

Section H – Special Contract Requirements 18-25

Section I – Contract Clauses 26-37

Section J – List of Attachments 38

Project Specifications - Separate Attachment

Project Drawings – Separate Attachment

Department of Labor Wage Determination 39-46

Section K – Representations, Certifications and Other Statements of Offerors 47-53

Section L – Instructions, Conditions, and Notices to Offerors 54-59

Section M – Evaluation Factors for Award 60-61

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

PLUMBING REPAIRS -TILLER RANGER DISTRICT

TILLER RANGER DISTRICT

Douglas County, Oregon

SCHEDULE OF ITEMS

All line items must be filled out. If there is no intent to charge for a Bid Item, a price of "0" or "No Cost" should be shown. If the price is left blank or shown as "No Bid" or “No Quote”, the entire bid/quote will be considered Non-Responsive.

ITEM NO DESCRIPTION

METHOD OF

MEASUREMENT PAY UNIT UNIT PRICE

QUOTE

AMOUNT

1 Mobilization LS ALL

Remove existing tees and supply and install new valves and valve boxes for the tee rehabilitation site and the new office water supply tie-in. LS ALL

Locate all utilities for excavation and potholing activities Complete potholing, excavation, and backfill activities to cap existing waterline and tie in to water pipeline on west side of building. LS ALL

Supply and install all plumbing and appurtenances to deliver water from the main tie-in to all interior fixtures. LS ALL

Supply and install point-of-use water heaters at the locations shown in the Drawings. LS ALL

BASE ITEM TOTAL $ _

Umpqua National Forest

OPTION

ITEM NO DESCRIPTION

METHOD OF

MEASUREMENT

PAY

UNIT UNIT PRICE

QUOTE

AMOUNT

1-O

Supply and install new gypsum board in areas that were removed to repair flood damage.

Prepare and paint gypsum board to match existing. LS ALL

2-O

Supply and install vinyl sheet flooring in the Tiller Ranger District Office breakroom. LS ALL

3-O

Install

GOVERNMENT

FURNISHED

cabinets, countertop, and backsplash in the breakroom as shown in the Drawings. LS ALL

OPTION ITEMS TOTAL $_____ _

TOTAL QUOTE (BASE AND OPTION ITEM) $____ _

Estimated Start Work: March 9, 2015

Contract Performance time: 120 Calendar days

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 45 calendar days of completion of specified project performance period. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

DUNS NUMBER: ______________________________________________________________

TAX IDENTIFICATION NUMBER (TIN): ________________________________________

EMAIL ADDRESS: ____________________________________________________________

NOTES:

1) Quoters are urged to inspect work site before submitting quote. See Section L-9 for organized Site Visit information.

2) A payment bond (100%) is required for all quotes that exceed $30,000.00. The Alternative Payment Protections authorized for this project are 1) Payment Bond – SF 25A, or 2) Irrevocable Letter of Credit.

3) Offerors MUST register in the SYSTEM FOR AWARD MANAGEMENT (SAM) data base –

See FAR 52.204-7 and Annual Representations and Certifications Applications – See FAR clause 52.204-8. These are now consolidated at the following site: https://www.sam.gov/portal/public/SAM/

4) ELECTRONIC OFFERS WILL NOT BE ACCEPTED. An offer that is emailed to government account will be rejected.

5) Facsimile quotes will be accepted at 541.618.2148.

6) This is not a public bid opening. All offers submitted are considered confidential. The name of the contractor and the amount of the contract will be disclosed only after an award has been made.

7) RETURN PACKAGE: See Section L – Instructions, Conditions, and Notices to Offerors or Respondents for requirements for the return package.

https://www.sam.gov/portal/public/SAM/

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1 STATEMENT OF WORK/SPECIFICATIONS - AGAR 452.211-72 (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

The Tiller Ranger District Office (Building No. 2008) recently experienced a flood resulting from failure of the existing galvanized water supply pipe embedded in concrete under the office. The pipeline failure and resulting intermediate repair (capping off the line and restoring water in part of the office) resulted in damage to walls, vinyl floor removal and cabinet removal. Work for this project will fully restore the water supply in the office and repair the damage caused by the floor and intermediate repairs as summarized below:

• Removal of existing valve, tee, and fittings shown in the tee rehabilitation (demo) detail of the Drawings.

• Supply and installation of new valve, tees, and fittings shown in the tee rehabilitation (proposed) detail of the Drawings.

• Exterior capping of existing waterline entering the Tiller Ranger District Office to bypass all of the existing galvanized lines.

• Exterior tie-in to water supply line located on the west side of the Tiller Ranger District Office. Route tie-in to enter the Tiller Ranger District Office

• Interior plumbing from new water line to tie-in to plumbing fixtures

• Supply and installation of individual on-demand water heaters at sinks

• Repair wall damaged by flood.

• Supply and install new interior vinyl flooring and rubber wall base where vinyl tiles were removed in the breakroom

• Install GOVERNMENT FURNISHED cabinetry in the breakroom.

See drawings, pictures, and descriptions for more information. Field verification of all work is required prior to bid.

C-2 PROJECT LOCATION

The Tiller Ranger District is located at 27812 Tiller Trail Hwy in Tiller, OR.

C-3 SPECIFICATIONS

AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR

PART 101-29 (FAR 52.211-1) (AUG 1998)

(a) The GSA Index of Federal Specifications, Standards and Commercial Item Description, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--

GSA Federal Supply Service Specifications Section, Suite 8100

Umpqua National Forest 470 East L'Enfant Plaza SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978.

(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.

AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF

FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM

DESCRIPTIONS (FAR 52.211-3) (JUN 1988)

The specifications cited in this solicitation may be obtained from:

Specification Address

Forest Service Specifications for Superintendent of Documents Construction of Roads and Bridges U.S. Government Printing Office, (EM-7720-100) Washington, D.C. 20402

Standard Specifications for Superintendent of Documents Construction of Roads and Bridges U.S. Government Printing Office, on Federal Highway Projects (FP-03) Washington, D.C. 20402

Superintendent of Documents Standard Specifications for U. S. Government Printing Office, Construction and Maintenance Washington, D.C. 20402 of Trails (EM-7720-103)

ASTM Standards American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103

(215) 199-5462

AASHTO Standards American Association of State Highway and

Transportation Officials 341 National Press Building Washington, D.C. 20024

The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.

(End of clause)

Umpqua National Forest

C-4 SUBMITTALS

Submittals shall include the following unless otherwise required in the specification:

1. Date and revision dates.

2. Project name and contract number.

3. Names of Contractor, subcontractor, supplier, and manufacturer.

4. Specifications section number.

5. Field dimensions and relation to adjacent structures.

6. Applicable standards such as ASTM or Federal Specifications.

7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.

(End of clause)

C-5 PRODUCT SAMPLES AND/OR SUBMITTALS

The following product samples and/or submittals are required for this project:

Title Referenced by

Specification No Time of Government Approval After Submittal

Product Data 02081 7 days Excavation plan 02318 7 days Excavation Written Notice

02318 7 days

Product Data 09640 7 days Samples 09640 7 days Maintenance Instructions

09640 7 days

Cutting plan 01245 7 days Cutting Written Notice 01245 7 days Technical Product Data 15050/15400 7 days Maintenance Data and Operating Instructions

15050 7 days

Technical Product Data 16010 7 days

C-6 SHOP DRAWINGS

The following shop drawings shall be submitted on this project:

Title Referenced by

Specification No Time of Government Approval After Submittal

Pipe Routing Drawings 15050 14 days Proposed Wiring Plan 16010 14 days

Umpqua National Forest

C-7 MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Title Referenced by

Specification No Time of Government Approval After Submittal

Imported Material Data 02318 7 days Cleaning and Testing Certificates

15050/15400 7 days

C-8 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS - AGAR

452.211-73 (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C-9 PERIOD OF CONTRACT

Item Estimated Beginning Date Contract Time (Calendar Days)

ALL March 2, 2015 120 Days

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

E-2 FAR 52.246-12 Inspection of Construction (Aug 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

http://www.arnet.gov/far/

Umpqua National Forest

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price.

The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.

Umpqua National Forest Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

E-3 Conformity with Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

SECTION F--DELIVERIES OR PERFORMANCE

F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

F-2 52.242-14 Suspension of Work (APR 1984)

F-3 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR

1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

Item Performance Period All Items 120 Calendar Days

Option Item may be exercised at any time up to and including the last day of the specified performance period of the Base Item. If the Option Item is exercised at a point when there are 25 or more calendar days left on the Base Item performance period, performance will run concurrently with the Base Item.

F-4 Project Coordination/Other Work in the Area

Contractor shall facilitate working relationships with any FS employees and contractors working at the job site area. Unless otherwise agreed to in writing by the COR, on-site work is restricted to business hours which are 8:00 AM – 4:30 PM, Monday – Friday. No work is allowed on weekends and federal holidays.

F-5 Suspensions Of Work For Other Than Government's Convenience

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to

Umpqua National Forest comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.

SECTION G--CONTRACT ADMINISTRATION DATA

G-1 Designation of Contracting Officers Representative

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G-2 AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held at an agreed upon date, time and location after contract award.

Umpqua National Forest G-3 Government-Furnished Property (Materials) (USDA 452.245-70)(FEB 1988)

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This shall be used and maintained by the Contractor in accordance with provisions of the "Government Property" FAR clause contained elsewhere in the contract.

Reference Kitchen Classics Attachment in Section J Item No. Description Delivery Date 140873 W1230 Wall Cabinet March 2, 2015 140880 W3030 Wall Cabinet March 2, 2015 275024 W3012 Wall Cabinet March 2, 2015 140882 FILLER 3” x 30” March 2, 2015 138569 B12 Base Cabinet March 2, 2015 138648 B30 Base Cabinet March 2, 2015 140866 SB36 Sink Base March 2, 2015 140883 TKC Toe Kick March 2, 2015

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H-1 Availability and use of Utility Services (Far 52.236-14) (Apr 1984)

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

Utilities Available Rate to be Charged Restrictions on Use

WATER NONE REASONABLE USE

SEWER NONE REASONABLE USE

ELECTRICITY NONE REASONABLE USE

H-2 Potential Safety Hazards

(a) Data and information furnished or referred to below is for the Contractor's information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[ ] Confined space entry.

[X ] Temporary excavation/deep trenching/slope stability.

[ ] Tree falling.

[ ] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[ ] Heavy equipment operation.

[ ] Tree climbing and/or tower climbing.

[ ] Fire hazards.

[ ] Hazardous materials handling.

[ X] Electrical hazard.

[ ] Hydraulic and/or pneumatic and/or other high pressure hazards.

[ X] Mechanical hazards such as pulleys, springs, etc.

Umpqua National Forest [ ] Other __________________________________

H-3 Special Equipment Cleaning Requirements

All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands.

Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.

Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. The Contractor shall advise of a proposed date for mobilization.

Inspections will take place at mutually agreeable en-route locations in advance of entry onto National Forest lands.

Special care shall be taken to assure removal of the following noxious weeds and their seeds:

spotted knapweed (Centaurea maculosa) diffuse knapweed (C. diffusa) yellow starthistle (C. solstitialis) gorse (Ulex europaeus) rush skeletonweed (Chondrilla juncea) tansy ragwort (Senecio jecobaea) purple loosestrife (Lythrum salicaria) distaff thistle (Carthamus lanatus) scotch broom (Cytisus scoparius)

The Contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.

H- 4 Landscape Preservation

(a) Prior to excavation, the Contractor shall remove the organic surface layer of soil, including grass and small plants within the clearing limits, stockpile separately and redistribute these materials over the finished slopes on the project as directed by the Contracting Officer. The conserved organic soil layer will be approximately 6” in thickness in all locations where practical and shall be removed with a smooth-edged excavator bucket or other similar tool that is capable of separating the upper organic layer of soil from the lower soil. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawn, or natural features not designated for treatment. The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Engineer and the Oregon

Umpqua National Forest Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.

Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating.

The spill kit shall be sufficient to absorb 34 gallons of oil, designed to float on the surface, while absorbing oil and repelling water. The KIT shall meet or exceed the physical properties of “New Pig Products Spill Kit #408”.

Oil absorbing mats are required under all stationary equipment, or equipment being serviced within the Forest Boundary to prevent leaking or spilled petroleum base products from contaminating soil and water resources. Such material will be furnished by Contactor and approved by Contracting Officer.

Servicing of all equipment shall be done only in the areas approved by the Contracting Officer.

If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR

112) including certification by a registered professional engineer.

Equipment shall be furnished on a fully operational basis, of modern design and in good operating condition with no fuel or oil leaks. Repairs and move-in/move-out are the Contractor’s responsibility. All equipment shall be power washed and shall be clean prior to entering Forest Service Land.

(c) No objectionable material shall be allowed to enter any stream, river, lake, or other body of water. Material which falls in these areas shall be retrieved and disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the project limits shall be repaired as directed by the Contracting Officer.

(d) The Contractor shall not operate equipment or otherwise disturb the natural vegetation and soil beyond the areas flagged on the ground or beyond two feet from edge of walkways, top of cuts, or toe of fills.

(e) The Contractor will make every reasonable attempt to preserve the scenic and natural environment along this construction project.

(f) Prior to the start of construction the Contractor shall submit to the Engineer for approval a schedule and plan for temporary pollution control measures for the following phases of work:

H-5 Product Substitution, Shop Drawings and Material Certification

(a) Product Substitution. Any modification of other items, designs, materials, products or equipment (including Government Furnished Property or Government Furnished Material), made necessary because of a substitution, shall be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be

Umpqua National Forest requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

(b) Shop Drawings and Submittals. The following submittals shall be submitted for approval within 10 calendar days after Notice to Proceed as required by the clause or specification unless noted elsewhere:

Basic Detailed Number Government

Reference Requirements of Copies Approval for Brief Title Section Section ToSubmit Submittal

Statement and Acknowledgement SF 1413 1 EA

Certified Payroll Record I FAR 52.222-8 1 WH-347 (submit weekly)

Schedule I FAR 52.236-15 1

Safety Plan H-4 Hazardous Conditions 1 Certification

Shop Drawing Details 061626, Part 1.04, A 1

Government has 7 calendar days to review packet of submittals unless noted elsewhere such as in the specifications.

H-5 Prosecution Of Work

(a) Construction activity shall be limited to the hours between 8:00 a.m. and 5:00 p.m., Monday through Friday, unless other hours are approved in writing by the Engineer. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum. The project site shall be open to public access and free of hazards on weekends. Any activities requiring closure to the public shall be scheduled with the COR at least 7 days in advance.

(b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.

Umpqua National Forest H-6 Final Cleanup

Contractor shall remove and dispose all of its own trash and refuse from the contract area. .

This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed off National Forest Land and in accordance with State and Local disposal requirements.

H-7 Protection Of Cultural Resources

Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (PL 96-95 and 36 CFR 261.9(e)) shall be identified on the ground by Forest Service.

Forest Service may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object which is or may be entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas or objects by either party shall be promptly reported to the other party.

Contractor shall protect <> all known and identified historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture against destruction, obliteration, removal or damage during Contractor's Operations. In accordance with 36 CFR 296.14(c), Contractor shall bear costs of restoration, provided that such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

Wheeled or track-laying equipment shall not be operated within such areas except on roads.

Unless agreed otherwise, trees will not be felled into such areas.

H-8 Methods Of Measurement

One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

(a) Designed Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

(1) As a result of changes in the work authorized by the Contracting Officer.

(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

Umpqua National Forest

(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurement of completed work.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

H-6 Permits and Responsibilities

All permits (unless noted elsewhere-see H-7 below) are not required to be obtained by the Contractor due to this being a Federal project. The lack of permits will not have negative impacts to the Contractor’s license and ability to work within the city in the future. Contractor is responsible, as noted above, to comply with all codes, laws and regulations applicable to this work.

H-7 State Electrical Inspection and County Building Permits

The Contractor shall arrange for and provide the State Electrical inspection. When requesting the inspection inform the Building Permit Department of the federal limitation described below.

The Contractor shall not obtain any building permits or inspections other than the State Electrical inspection.

Federal law [validated by the State Attorney General, Oregon Department of Justice] verify that the Federal Government and its Contractors may be exempted from State/Local Building Permits and Fees for projects located on Federal Installations [including all federal lands]. Contractor State Licenses will not be jeopardized by following this requirement to avoid the State/County permit system. This applies to the prime Contractor and all subcontractors.

H- 8 Agar 452.228-71 Insurance Coverage (Nov 1996)

Pursuant to FAR clause 52.228-5, Insurance - Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If

Umpqua National Forest occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury, and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

H-9 Payments for Incidental Items

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with plans, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items.

All other work and materials will be considered indirect to and included in the payment for items shown.

H-10 Local Disposal Sites

Debris encountered in the contract and other waste materials generated in the work (cartons, scrap, etc.) shall be removed and disposed of off of National Forest Service Land, and as required in the specifications.

H-11 Project Site Maintenance and Cleanup

Throughout the construction period, Contractor shall maintain the construction site in a neat, clean and orderly manner. Retain all stored items in an orderly arrangement allowing maximum access, not impeding drainage or traffic, and providing the required protection of materials. Do not allow the accumulation of scrap, debris, waste material, and other items not required for construction of this work. Provide adequate storage for all items, awaiting removal from the job site, observing all requirements for fire prevention and protection of the environment.

H-12 Traffic Control, Barricades, Warning Signs and Other Devices

Contractor shall provide, erect and maintain all necessary barricades, construction area fencing, suitable and sufficient lights, danger signals, signs, flaggers, and other traffic devices, and shall take all necessary precautions for the protection of the work and safety of the public, and government employees working or residing in the project area. Barricades and other obstructions shall be illuminated during the hours of darkness, unless otherwise approved by the COR. Suitable warning signs shall be provided to properly control and direct foot and vehicular traffic. All operations shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).

Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of walkways, roads, parking areas or trails by foot or vehicular traffic, and at all intermediate points, where the new work crosses or coincides with an existing transportation and parking areas.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.usda.gov/procurement/policy/agar.html

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013) (Applicable if over $25,000 unless award is to an individual)

52.204-13 System for Award Management Maintenance (JUL 2013) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (AUG 2013) (Applicable if contract exceeds $30,000)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Dec 2014) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.217-7 Option for Increased Quantity – Separately Priced Line Item (MAR 1989) 5 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) 52.219-28 Post-Award Small Business Program Representation (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Act

Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds

$10,000) 52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

(Applicable if FAR52.222-26 is included) 52.222-36 Equal Opportunity for Workers With Disabilities (Jul 2014) (Applicable if contract exceeds $15,000) 52.222-50 Combating Trafficking in Persons (FEB 2009) http://www.usda.gov/procurement/policy/agar.html http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm%23P1580_273011

Umpqua National Forest 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction

Contracts (SEPT 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011)

52.224-1 Privacy Act Notification (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-13 Alternative Payment Protections (JUL 2000)

(a) Payment Bond or Irrevocable Letter of Credit 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL

2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (MAY 2014) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

Umpqua National Forest

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988

I-2 52.204-13 System For Award Management Maintenance (JUL 2013)

(a) Definitions. As used in this clause— “Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by

Dun and Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for Federal contractors.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at subpart 32.11) for the same concern.

“Registered in the System for Award Management (SAM) database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see Subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record “Active”.

“System for Award Management (SAM)” means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .