F. Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| i.ReturnThisCopy.rtf | RTF text file | |
| c.ConstLog.docx | DOCX document | |
| a.AG-04M3-S-14-0050.rtf | RTF text file | |
| g.WA87dvb_Heavy.mht | MHT file | |
| b.Specs.docx | DOCX document | |
| h.FireProtection.doc | DOC document | |
| d.Vicinity_Map.pdf | ||
| e.Project_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stump Position Side Slope Uphill
Downhill
Stumps between the trailway and clearing limits.
Side slope less than or=to 10%
Side slope over 10%
Side slope less than or=to 10%
Side slope over 10%
Stumps outside the clearing limits
Location Uphill Downhill
Vertical
*All heights measured on uphill side of stumps.
Trim branches trunk rather than remove
Trailbed
Trailway
Cut
Clearing Limit
Clearing Limit
Downhill
Cut All Logs
Downhill
Cut
C
L
Cut
Inches Inches
Remove all trees inches or less in diameter if they are within feet of centerline (both sides).
Do not remove trees over inches diameter if they are over feet from the centerline (both sides).
tree.
Uphill flush with
U S
All
All
3.5'
3.0'
10.0'
10 10
10 12
12 14
Middle Point Trail Restoration
Note: Log out includes recut of all previous cut logs not cut to spec within the clearing limits.
Amount of bench varies with % of sideslope. Outslope trailbed 3%
Trailbed
Balanced
Section
0% to 10%
Sideslope
10% to 30%
Sideslope
30% to 50%
Sideslope
Above 50%
Sideslope
Width (inches)
Trailbed
Location
Fill slope
Fill slope
Slope rounding in commom material
Slope rounding in commom material
Slope rounding in commom material
U S
All
24"
Middle Point Trail Restoration
Backslope Ratio-Vertical:Horizontal
Rock :
Common :
Ditch
Section
Minimum Clearance
Requirements inches inches inches inches
Common :
Rock :
Fill Slope Ratio-Vertical:Horizontal
U S
.75
1 1
1.5 1
1.5
P re v a il in g G ra d e
Skew top and bottom of dip
Outslope range 6%-10%.
If spill point of dip is not to daylight, construct lead-off ditch to daylight.
inches minimum inches minimum
U S
Grade break a minimum of inches above the high-water mark on both banks.
Backslope
Stream Bank
Downgrade feet
Embed rock dam into each bank a minimum distance of 12 inches.
Downgrade feet
Construct tread of gravel and small rock less than
High Water Level
S t r e a m
F l o w
Construct top of dam level.
Hand-Placed
Rock Dam.
Typical
Streambed
D o w n s tr e a m
Install stepping rocks
130 lb minimum.
3 inches in size.
Install stepping rocks on upstream
12 inches typical spacing
Embed 1/3 of rock depth.
edge of tread.
High Water Level
Embed 12 inches minimum
Hand-placed rocks, 130 lb minimum, across full width.
Key in smaller rocks.
U S
O u ts lo p e
Rock Barrier
Ditch
In slo pe
Radius point is staked at each individual site.
m a xim u m g ra d e
U p g ra d e
Approach, 5% maximum grade
Upgrade
Turn Section maximum
B a rrie r
Grade
Drain Ditch
Spill Point
Through cuts are permitted on upper sides of switchbacks
In s lo p e to o u ts lo p e tra n s itio n fe e t m in im u m
E nd
25 feet
S ta rt
Daylight
Section inches inches
Backslope, refer to trail excavation details.
Log or
U S
3-5
3-5
Compacted
Suitable Material.
inch Crown
Berm
Slough
Existing Ground
U S Middle Point Trail Restoration
| mp911_1-8x11 |
| mp912_1-8x11 |
| mp912_2-8x11 |
| mp912_5-8x11 |
| mp912_7-8x11 |
| mp914_1-8x11 |
| mp915_1-Layout2-8x11 |
File details come from the government source that posted it. Updated .