c.ConstLog.docx

DOCX document 15 KB Posted

Attached to
Middle Point Motorcycle Trail Restoration
Solicitation number
AG-04M3-S-14-0050
Issued by

About this file

C. Construction Log

View the file

Other files

File Type Posted
i.ReturnThisCopy.rtf RTF text file
a.AG-04M3-S-14-0050.rtf RTF text file
g.WA87dvb_Heavy.mht MHT file
f.Drawings.pdf PDF
b.Specs.docx DOCX document
h.FireProtection.doc DOC document
d.Vicinity_Map.pdf PDF
e.Project_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Station

Quantity
Unit
Description of Work
Comments
Pay Item
0+00
20,460
LF
Existing trail restoration
BOP, trail side of bridge
915(01)

45+51

Switchback

52+12
1
EA
Construct rolling dip

912(12)

59+77

Climbing turn

60+87

Climbing turn

61+05
1
EA
Construct rolling dip

912(12)

62+90

Climbing turn

63+82

Climbing turn

65+10
1
EA
Construct rolling dip

912(12)

67+07

Switchback

69+33

Switchback

69+86

Climbing turn

72+34
1
EA
Construct rolling dip

912(12)

74+78

Switchback

79+13

Rolling dip

80+14

Switchback

82+00

Climbing turn

84+20
1
EA
Construct rolling dip

912(12)

88+16

Switchback

91+31

Switchback

91+52
1
EA
Construct rolling dip

912(12)

91+80

Climbing turn

94+52
1
EA
Construct rolling dip

912(12)

98+90

Switchback

101+77

Climbing turn

102+75
1
EA
Construct rolling dip

912(12)

117+18

Rolling dip

123+93

Rolling dip

140+22
1
EA
Construct rolling dip

912(12)

176+76

Rolling dip

178+92

Rolling dip

181+33
1
EA
Construct rolling dip

912(12)

183+60

Climbing turn

184+05
1
EA
Construct rolling dip

912(12)

184+15

Climbing turn

204+35
1
EA
Construct rolling dip

912(12)

204+60

EOP, pipe barricade

File details come from the government source that posted it. Updated .