CACHE EXTERIOR IMPROVEMENTS
AG-04GG-S-17-0005
Redmond Air Center
SITE VISIT/
PRE-PROPOSAL CONFERENCE
February 2, 2017
* These charts summarize, but do not change any of the requirements in AG-04GG-S-17-0005
AGENDA
Contract Requirements Overview Proposal Preparation Instructions Evaluation Criteria Building Walk-through Final Q&A
Contract Requirement Overview* Disclaimer: Funds are NOT presently available for this effort. The Government reserves the right to cancel, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.
We are still under a Continuing Resolution Authority (federal budget not yet approved by Congress)
DESCRIPTION OF WORK
This project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the ‘Cache’ building exterior improvements located at the Redmond Air Center. Work includes, but is not limited to complete replacement of roofing materials, siding, and indicated windows and doors. Work also includes removal of some windows, followed by patching the opening to match existing interior, and new exterior.
The project location can be only accessed for construction November 1, 2017 through May 15, 2018. The time stated for completion shall include final cleanup of the premises. (Clause F-2, page 7)
* These charts summarize, but do not change any of the requirements in AG-04GG-S-17-0005
Proposal Preparation Instructions
TECHNICAL, PAST PERFORMANCE, and PRICE
Technical Proposal – Page 40 A description of how the work will be accomplished and equipment used.
A description of impacts to the project site and if/how the work might affect building employees and the area around the building.
A detailed project schedule, showing the length of time to complete work for each section of the project.
Past Performance – Page 40 Complete a Past and Current Contract Information Sheet (Attachment 6) for each related project completed in the last 3 years.
Proposal Preparation Instructions (cont’d) Price/Business Proposal – Page 40 Standard Form 1442 with Blocks 14-20 completed. Include DUNS number.
Complete prices for all items in Schedule of Items (RFP page 3) Mark the appropriate box in clause K-32 para (b) Annual Representations and Certifications (page 24). Since SAM registration is required for award, block (i) should be marked and if there are any updates to your SAM, they should be reflected in paragraph (d) or preferably, your SAM registration is updated.
Ensure your SAM registration includes NAICS 238190.
Bid Guarantee as required by FAR 52.228-1, RFP paragraph I-5.
*Make sure you comply with Wage Decision, Atch 4 Minimum hourly wages Minimum Fringes** ** Examples of Fringe Benefits are Health insurance, Pension, Vacation, Holidays, and Sick leave
Evaluation Criteria (pg 35) The award of any contract as a result of this solicitation will be based on a best value assessment of each offeror’s proposal using the following evaluation factors: Technical Capability, Past Performance and Price.
The non-price factors (Technical Capability and Past Performance) when combined are approximately equal in importance to price.
Evaluation factores:
(a) Technical Capability
(b) Past Performance
(c) Price
Evaluation Criteria (cont’d)
TECHNICAL CAPABILITY EVALUATION
Technical capability will be evaluated to determine whether the offeror demonstrates an understanding and sound approach to meeting the solicitation requirements.
Technical Capability will receive a rating of Does Not Meet, Meets, or Exceeds as defined below.
Does Not Meet: Offeror does not demonstrate an understanding and sound approach to meeting the requirements.
Meets: Offeror demonstrates an understanding and sound approach to meeting the contract requirements.
Exceeds: Offeror demonstrates an understanding and sound approach to meeting the contract requirements AND exceeds the requirements of the solicitation
Evaluation Criteria (cont’d)
PAST PERFORMANCE EVALUATION
Past Performance information will consider recency (within last 3 years), relevancy (similar work to this project) and quality of past performance (based on contacting referenced provided in Past Performance Data Sheet). Past performance will receive one of the following ratings:
Past Performance will receive one of the following ratings:
Exceptional Very Good Satisfactory Neutral (no past performance) Marginal Unsatisfactory
PRICE EVALUATION
Price will also be evaluated for Reasonableness in accordance with FAR 15.305
PROPOSALS DUE:
FEBRUARY 23, 2017
2:00 PM
Emails accepted: barbaradarling@fs.fed.us
Building Walk-through
QUESTIONS?
1/30/2017
All questions MUST be directed through the Contract Specialist:
Barbara Darling barbaradarling@fs.fed.us
(541) 383-5552 image1.jpg image7.png image2.png image3.png image4.png image5.png image6.png