BEND PINE ADMINISTRATIVE SITE RFP SEPARATE ATTACHMENTS

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: BEND-PINE ADMINISTRATION SITE, newest first.
File Type Posted
C525.pdf PDF
Amendment 5_SF30.doc DOC document
SECTION 221353.pdf PDF
C528.pdf PDF
Amendment 4_SF30.doc DOC document
C527.pdf PDF
Additional Revisions.docx DOCX document
C601.pdf PDF
Revised A104.pdf PDF
Additional Revisions.pdf PDF
Amendment 3_SF30.pdf PDF
C526.pdf PDF
Revised A205.pdf PDF
0227-E401_RE1.pdf PDF
OR39 DOL Wage Determination.pdf PDF
RFI 73 attachment.pdf PDF
PBS report.pdf PDF
Amendment 2_SF30.pdf PDF
26 33 50 Static Uninterruptible Power Supply System —
26 21 01 Snow Melting cable.pdf PDF
26 32 10 Diesel Standby Power Generation System.pdf PDF
consolidated RFI.pdf PDF
Amendment 1_SF30.doc DOC document
Bend Pine Administrative Site RFP return packet.doc DOC document
Bend Pine Administrative Site RFP.doc DOC document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RFP

AG-0489-S-10-0326

EROC - NW

Bend – Pine Administrative Site

SEPARATE

-ATTACHMENTS -

Bend Pine Administrative Site

AG-0489-S-10-0326

General Decision Number: OR080039 01/08/2010 OR39

State: Oregon

Construction Type: Building

County: Deschutes County in Oregon.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 12/18/2009

1 01/01/2010

2 01/08/2010

BROR0001-017 06/01/2009

Rates Fringes

BRICK FINISHER...................$ 31.07 13.70

BRICKLAYER.......................$ 31.07 13.70

TILE FINISHER....................$ 21.11 9.50

TILE SETTER......................$ 27.80 12.90

CARP0001-026 06/01/2009

Rates Fringes

Carpenters:

Including metal stud installation and form work..$ 27.56 13.30

MILLWRIGHT.......................$ 28.04 13.30

CARP9001-004 06/20/2007

Rates Fringes

Acoustical Ceiling Installer

& Drywall Hanger.................$ 27.95 13.52

* ELEC0280-010 01/01/2010

Rates Fringes

ELECTRICIAN......................$ 34.05 3%+14.43

* ELEC0280-012 01/01/2010

Rates Fringes

ELECTRICIAN (Alarm

Installation, Computer

Installation and Low Voltage wiring for Alarms)...............$ 26.04 3%+$10.65

ENGI0701-023 01/01/2010

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.27 11.50

GROUP 1A....................$ 39.13 11.50

GROUP 1B....................$ 41.00 11.50

GROUP 2.....................$ 35.64 11.50

GROUP 3.....................$ 34.65 11.50

GROUP 4.....................$ 33.71 11.50

GROUP 5.....................$ 32.60 11.50

GROUP 6.....................$ 29.61 11.50

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM

CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM

CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through

199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley

Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade

Operator-Robotic; Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator;

Excavator over 130,000 lbs

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons

(and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Excavator over 80,000 through 130,000 lbs

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/EXCAVATOR-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments;

Excavator Operator over 20,000 lbs through 80,000 lbs.;

BLADE: Blade operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine

Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES:

Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments;

Asphalt Paver; Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled;

Trenching Machine, digging capacity over 3 ft Depth;

Excavator over 20,000 lbs through 80,000 lbs.

GROUP 5: TRACKHOE/EXCAVATOR-HYDRAULIC: up to and including

20,000 lbs.; Boom truck operator; DRILLING: Churm Drill and

Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; HYDRAULIC HOES: Hydraulic

Backhoe Operator, wheel type (Ford, John Deere, Case type);

Hydraulic Backhoe Operator track type up to and including

20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor

GROUP 6: LOADERS: (less than 1 cu yd.); Roller

(Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;

Crane oiler; Drill Assistant

IRON0029-011 07/01/2009

Rates Fringes

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.12 17.40

LABO0001-030 06/01/2008

Rates Fringes

Laborers: (Mason

Tender-Cement/Concrete)..........$ 25.75 11.25

LABO0001-031 06/01/2008

Rates Fringes

Laborers: (Mason Tender-Brick)...$ 25.75 11.25

LABO0001-032 06/01/2008

Rates Fringes

Laborers: (Mason Tender-Stone)...$ 25.75 11.25

LABO0003-008 06/01/2008

Rates Fringes

Laborers:

GROUP 1.....................$ 24.66 11.25

GROUP 2.....................$ 25.29 11.25

GROUP 3.....................$ 25.75 11.25

GROUP 4.....................$ 26.15 11.25

LABORER CLASSIFICATIONS

GROUP 1: Form-Stripping

GROUP 2: Power Tool Operator

GROUP 3: Vibrating Plate

GROUP 4: Grade Checker, Pipelayer

PAIN0055-024 07/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 26.31 10.63

PLAS0082-003 06/01/2008

Rates Fringes

PLASTERER........................$ 28.46 11.61

PLAS0555-006 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.87 15.59

PLUM0290-008 04/01/2009

Rates Fringes

Plumbers and Pipefitters.........$ 35.69 18.59

SUOR2009-023 11/09/2009

Rates Fringes

ELECTRICIAN (Electrical Low

Voltage Wiring Installer)........$ 20.75 9.30

GLAZIER..........................$ 22.25 11.21

LABORER: Common or General......$ 18.71 7.27

LABORER: Landscape..............$ 14.02 2.63

OPERATOR: Forklift..............$ 19.09 7.89

PAINTER: Brush Only.............$ 13.70 3.16

PAINTER: Roller Only............$ 13.70 3.16

PAINTER: Spray Only.............$ 12.00 2.36

ROOFER, excluding Metal Roof.....$ 16.31 5.38

SHEETMETAL WORKER, Including

HVAC Duct Installation...........$ 30.92 8.61

TRUCK DRIVER: Dump Truck........$ 15.50 9.05

TRUCK DRIVER: Water Truck.......$ 18.40 5.33

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction

Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR

Part 7).

Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board

(formerly the

Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

USDA FOREST SERVICE

PACIFIC NORTHWEST REGION

FIRE PROTECTION AND SUPPRESSION

1. Fire Period and Closed Season

Specific fire prevention measures are listed below and shall be effective for the period April 1 to October 31 of each year. The Forest Service may change the dates of said period by advance written notice if justified byunusual weather or other conditions. Required tools and equipment shall be kept currently in serviceable condition and immediately available for initial attack on fires.

2. Fire Plan

Before starting any operations on the project, the Contractor, Permittee, Licensee, or Purchaser, hereinafter referred to as the "Contractor," shall prepare a fire plan in cooperation with the Contracting Officer providing for the prevention and control of fires in the project area.

The Contractor shall certify compliance with fire protection and suppression requirements before beginning operations during the fire period and closed season, and shall update such certification when operations change.

3. Substitute Measures

The Contracting Officer may by written notice authorize substitute measures or equipment or may waive specific requirements during periods of low fire danger.

4. Emergency Measures

The Forest Service may require emergency measures, including the necessary shutting down of equipment or portions of operations in the project area during periods of fire emergency created by hazardous climatic conditions.

5. Fire Control

The Contractor shall, independently and in cooperation with the Forest Service, take all reasonable action to prevent and suppress fires in the project area. Independent initial action shall be prompt and shall include the use of all personnel and equipment available in the project area.

For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor's operations, the Contractor shall place employees and equipment temporarily at the disposal of the Forest Service. Any individual hired by the Forest Service will be employed in accordance with the Interagency Pay Plan for Emergency Firefighters. The Forest Service will compensate the Contractor for equipment rented at fire fighting equipment rates common in the area, or at prior agreed to rates.

R6-FS-6300-52

(Rev. 5/97)

6. Compliance with State Forest Laws Listing of specific fire precautionary measures herein is not intended to relieve the Contractor in any way from compliance with the State Fire Laws covering fire prevention and suppression equipment, applicable to operations under this contract, permit or license.

7. Fire Precautions

Specific fire precautionary measures are as follows:

a. Smoking and Open Fires Smoking and fires shall be permitted only at the option of the Contractor. The Contractor shall not allow open fires on the project area without advance permission in writing from Forest Service.

Unless restricted by State Law or Federal Regulation, smoking shall be permitted only in such portions of the project area that are free of flammable material. Smokers shall sit down to smoke in such a position that any burning material will fall within a cleared area, and shall extinguish and press out in mineral soil all burning material before leaving the cleared area.

b. Fire Extinguishers and Equipment on Trucks, Tractors, etc.

All power-driven equipment operated by the Contractor on National Forest land, except portable fire pumps, shall be equipped with one fire extinguisher having a UL rating of at least 5 BC, and one "D" handled or long handled round point shovel, size "0" or larger. In addition, each motor patrol, truck and passenger-carrying vehicle shall be equipped with a double-bit axe or Pulaski, 3-1/2 pounds or larger.

Equipment shall be kept in a serviceable condition and shall be readily available.

c. Power Saws Each gasoline power saw operator shall be equipped with a pressurized chemical fire extinguisher of not less than 8-ounce capacity by weight, and one long-handled round point shovel, size "0" or larger. The extinguisher shall be kept in possession of the saw operator at all times. The shovel shall be accessible to the operator within 1 minute.

d. Extinguishers One refill for each type or one extra extinguisher sufficient to replace each size extinguisher required on equipment shall be safely stored in the fire tool box or other agreed upon place on the project area that is protected and readily available.

R6-FS-6300-52

(Rev. 5/97)

e. Spark Arresters and Mufflers Each internal combustion engine shall be equipped with a spark arrester meeting either (1) USDA Forest Service Standard 5100-1a, or (2) appropriate Society of Automotive Engineers (SAE) recommended practice J335(b) and J350(a) as now or hereafter amended unless it is:

(1) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

(2) A passenger-carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory-designedmuffler complete with baffles and an exhaust system in good working condition.

(3) A heavy duty truck, such as a dump or log truck, or other vehicleused for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Exhaust equipment described in this subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.

f. Emergency Fire Precautions

The Contractor shall restrict operations in accordance with the Industrial Fire Precaution Levels listed below. The Forest Service may change the Industrial Fire Precaution Levels to other values upon revision of the National Fire Danger Rating System and may change the specific Industrial Fire Precaution Levels when such changes are necessary for the protection of the National Forest. When sent to the Contractor, the revised Industrial Fire Precaution Levels will supersede the attached levels.

INDUSTRIAL FIRE PRECAUTIONS SCHEDULE

LEVEL INDUSTRIAL FIRE PRECAUTION (IFPL)

I. Closed season - Fire precaution requirements are in effect. A fire watch/security is required at this and all higher levels unless otherwise waived.

II. Partial hootowl - The following may operate only between the hours of 8 p.m. and 1 p.m., local time:

a. power saws, except at loading sites;

b. cable yarding;

c. blasting;

d. welding or cutting of metal.

R6-FS-6300-52

(Rev. 5/97) III. Partial shutdown - The following shall be prohibited except as indicated:

Cable yarding - except that gravity operated logging systems employing non-motorized carriages may be operated between the hours of 8 p.m. and 1 p.m., local time, when all block and moving lines, except the line between the carriage and the chokers, are suspended 10 feet above the ground;

Power saws - except power saws may be used at loading sites and on tractor/skidder operations between the hours of 8 p.m. and 1 p.m., local time.

In addition, the following are permitted between the hours of 8 p.m. and 1 p.m., local time:

a. tractor/skidder operations;

b. mechanized loading and hauling of any product or material;

c. blasting;

d. welding or cutting of metal;

e. any other spark-emitting operation not specifically mentioned.

IV. General shutdown - All operations are prohibited.

The following definitions shall apply to these Industrial Fire Precaution Levels:

Cable yarding systems: A yarding system employing cables and winches in a fixed position.

Closed season (Fire Precautionary Period): That season of the year when a fire hazard exists as declared by the responsible agency official.

Contracting Officer: The person executing the contract, permit or license on behalf of the Government and includes that person's designated representative, acting within the limits of their authority or the duly appointed successor to the individuals.

Loading sites/woods site/project area: A place where any product or material (including but not limited to logs, firewood, slash, soil, rock, poles, posts, etc.) is placed in or upon a truck or other vehicle.

Low hazard area: Means any area where the responsible agency representative (WDNR, ORF, BIA, BLM) determines the combination of elements reduces the probability of fire starting and/or spreading.

R6-FS-6300-52

(Rev. 5/97) Tractor/skidder operations: include a harvesting operation, or portion of a harvesting operation, where tractors, skidders, or other harvesting equipment capable of constructing fireline, are actively yarding forest products and can quickly reach and effectively attack a fire start.

Waivers, written in advance, may be used for any and all activities. Activities for which waivers may be issued include, but are not limited to:

a. mechanized loading and hauling;

b. road maintenance such as sprinkling, graveling, grading and paving;

c. cable yarding using gravity systems or suspended lines and blocks, or other yarding systems where extra prevention measures will significantly reduce the risk of fire;

d. powers saws at loading sites or in felling and bucking where extra prevention measures will significantly reduce the risk of fire;

e. maintenance of equipment (other than metal cutting and welding) or improvements such as structures, fences and powerlines.

Such waiver, or substitute precautions will prescribe measures to be taken by the Contractor to reduce the risk of ignition, and/or the spread of fire. The Contracting Officer shall consider site specific weather factors, fuel conditions, and specific operations that result in less risk of fire ignition and/or spread than contemplated when precaution level was predicted. Consideration shall also be given to measures that reduce the precaution levels above. The Contractor shall assure that all conditions of such waivers or substitute precautions are met.

The Contractor shall obtain the predicted Industrial Fire Precaution Level daily, prior to the start of work, from the appropriate Ranger District headquarters. If predictions made after 6:00 p.m., local time, are significantly different than the original prediction, the Forest Service will inform the Contractor when changes in restrictions or industrial precautions are made.

NOTE: The IFPL system does not apply on lands protected by ODF east of the summit of the Cascades.

Where hauling involves transit through more than one shutdown/regulated use area, the precaution level at the woods loading site shall govern the level of haul restriction, unless otherwise prohibited by other than industrial precaution level system.

R6-FS-6300-52

(Rev. 5/97)

8. Fire Tools The Contractor shall furnish serviceable fire fighting tools in a readily accessible fire tool box or compartment of sound construction with a hinged lid and hasp so arranged that the box can be secured or sealed. The box shall be red and marked "Fire Tools" in letters one inch high. It shall contain a minimum of:

a. 2 axes or Pulaskis with a 32-inch handle;

b. 3 adze eye hoes. One Pulaski may be substituted for 1 adze eye hoe;

c. 3 long-handled, round point shovels, size "0" or larger.

9. Fire Security When the Industrial Fire Precautions Level is "I" or higher, unless a waiver is granted, the Contractor shall designate a person who shall perform fire security services listed below on the project area and vicinity. The designated person shall be capable of operating the Contractor's communications and fire fighting equipment specified in the contract, excluding helicopters, and of directing the activities of the Contractor's personnel on forest fires. In lieu of having the designated person perform the required supervisory duties, the Contractor may provide another person meeting the qualifications stated above to direct the activities of Contractor's personnel and equipment during all fire fighting activities.

Services described shall be for at least 1 hour from the time the Contractor's operations are shut down. For the purposes of this provision, personnel servicing equipment, and their vehicles, who are not engaged in cutting or welding metal are excluded.

Fire security services shall consist of moving throughout the operation area or areas constantly looking, reporting, and taking suppression action on any fires detected. Where possible, the designated person shall observe inaccessible portions of helicopter operating areas from vantage points within or adjacent to project area.

10. Blasting Whenever the Industrial Fire Precaution Level is "II" or greater, a fire security person equipped with a long-handled, round point, No. "0" or larger, shovel, and a five-gallon backpack pump can filled with water will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service in writing, in an area of high rate of spread and resistance to control.

Fuses shall not be used for blasting. Explosive cords shall not be used without written permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

R6-FS-6300-52

(Rev.

R6-FS-6300-53 (5/89)

USDA Forest Service - Pacific Northwest Region Fire Protection and Suppression Additional Fire Precautionary Measure 2 - Communications

12. The contractor shall provide adequate two-way communication facilities to report a fire to Forest Service within 15 minutes of detection. FCC Regulations prohibit commercial use of Citizen Band (CB) radios. (CB's are not considered adequate two-way communications).

Such communications shall be operable during periods of operation of power-driven equipment, including the time fire security is required.

R6-FS-6300-53 (5/89)

ADDENDUM TO BEND PINE ADMINISTRATIVE SITE PHASE I

(changes to technical requirements as recorded on the compact disc (CD)

1) BASE ITEM B16 “ADDITIONAL FENCING” – DESCRIPTION OF WORK

a) Supply and install an additional 3,786 feet of 8 ft. tall chain link fence around the perimeter of the Bend Pine Administrative Site, two personnel gates, and one vehicle gate as shown in the attached drawing. This is in addition to the same work and materials as described in 323113-CHAIN LINK FENCES AND GATES. Provide a Shop Drawing of the vehicle gate four weeks in advance of construction for approval by the C.O.R.

b) Remove and dispose of 2,900 ft. of existing wire fence as shown on the drawing and described in 024116-STRUCTURAL DEMOLITION. Maintain security at the site by scheduling this work within 7 days after the completing the installation of the new fence.

c) Unless noted otherwise, all work and materials shall comply with the specifications and requirements as described in the attached “Bend Pine Administrative Site Phase I” Project Manuals.

2) BASE ITEM B17 “DESCHUTES MARKET ROAD UPGRADE” – DESCRIPTION OF WORK

a) Unless noted otherwise, all work and materials shall comply with the specifications and requirements as described in the attached “Bend Pine Administrative Site Phase I” Project Manuals.

3) OPTIONAL ITEM A11 “ADDITIONAL TECHNOLOGY SITE WORK”

a) Unless noted otherwise, all work and materials shall comply with the specifications and requirements as described in the attached “Bend Pine Administrative Site Phase I” Project Manuals.

b) Supply and install additional conduits and associated materials as shown on attached drawings and exhibits.

4) OPTIONAL ITEM 01 “ON-SITE DISPOSAL SYSTEM” – DESCRIPTION OF WORK

a) The on-site sewage disposal system will consist of four parts:

i) Septic tank as shown on drawings and as specified in permit.

ii) Orenco commercial AdvanTex AX100 Treatment system, rated for up to 5000 gpd for Treatment Standard 1. Only one pod shall be required. The treatment pod dimensions to be approximately 8 ft by 16 ft. The system to be a premanufactured package, including textile medium, for quality control.

iii) Approximately 750 lineal feet of subsurface absorption trenches.

iv) Installation and connection to piping and all associated earthwork and appurtenances resulting in a fully compliant and operating system.

b) Unless noted otherwise, all work and materials shall comply with the specifications and requirements as described in the attached “Bend Pine Administrative Site Phase I” Project Manuals.

5) ELECTRIC POWER UTILITY

a) Revise sheet E101 notes for the power utility contact. The Power Company for this site is served by MidState Electric Cooperative. Their website is: http://www.midstateelectric.coop/

6) REVISE SPECIFICATION “ 012300 - ALTERNATES”

a) Delete Alternate “A5”

b) Revise Alternate “A4” to “A5”

c) Delete “Deductive Alternate items”

TECHNICAL EVALUATION QUESTIONNAIRE

CONTRACTOR’S PAST PERFORMANCE HISTORY

Provide a listing of your projects for the past three-year period which most closely relate to this type of work. Include the dates of performance, the agency or company name, the name and phone number of the contact person, the dollar value of the contract, the contract number, and the type of work performed. These firms may be contacted for references.

If you have failed to complete any project in the last three-year period, provide any information regarding the cause or remedy of that particular situation.

Note: Other forms and/or formats may be used which provide the required information.

Agency/Company

Contact Name

Phone No.

Dates of performance

Contract Number

Dollar Value

Type of work performed

Agency/Company

Contact Name

Phone No.

Dates of performance

Contract Number

Dollar Value

Type of work performed

Agency/Company

Contact Name

Phone No.

Dates of performance

Contract Number

Dollar Value

Type of work performed

Agency/Company

Contact Name

Phone No.

Dates of performance

Contract Number

Dollar Value

Type of work performed