Amendment 5_SF30.doc
DOC document 54 KB Posted
- Attached to
- RECOVERY: BEND-PINE ADMINISTRATION SITE Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0326
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C525.pdf | ||
| SECTION 221353.pdf | ||
| Additional Revisions.docx | DOCX document | |
| C601.pdf | ||
| C528.pdf | ||
| Amendment 4_SF30.doc | DOC document | |
| C527.pdf | ||
| C526.pdf | ||
| Revised A205.pdf | ||
| Additional Revisions.pdf | ||
| Amendment 3_SF30.pdf | ||
| Revised A104.pdf | ||
| 26 21 01 Snow Melting cable.pdf | ||
| 26 32 10 Diesel Standby Power Generation System.pdf | ||
| consolidated RFI.pdf | ||
| 0227-E401_RE1.pdf | ||
| Amendment 2_SF30.pdf | ||
| 26 33 50 Static Uninterruptible Power Supply System | — | |
| OR39 DOL Wage Determination.pdf | ||
| RFI 73 attachment.pdf | ||
| PBS report.pdf | ||
| Amendment 1_SF30.doc | DOC document | |
| Bend Pine Administrative Site RFP.doc | DOC document | |
| Bend Pine Administrative Site RFP return packet.doc | DOC document | |
| Bend Pine Administrative Site RFP separate ATTACHMENTS.doc | DOC document |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Approval 2700-0042
| 1. CONTRACT ID CODE |
| PAGE |
OF
PAGES
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 0489 |
| 1 |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Five (5) |
| 19 MAY, 2010 |
| 6. ISSUED BY |
| CODE |
7. ADMINISTERED BY (If other than Item 6)
| CODE |
| 0489 |
US Forest Service
EROC Northwest
16400 Champion Way
Sandy, OR 97055
| 8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) |
| (() |
| 9A. AMENDMENT OF SOLICITATION NO. |
AG-0489-S-10-0326
| X |
| 9B. DATED (SEE ITEM 11) |
March 25, 2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
FORMCHECKBOX
is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A.
THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C.
THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D.
OTHER Specify type of modification and authority)
E. IMPORTANT: Contractor
FORMCHECKBOX
is not, FORMCHECKBOX is required to sign this document and return __1__ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. Attached are further clarifications to the Drawings / Specifications – Section 221353, C525
2. The contractor shall track and provide to the Government an accounting of the LEED certification costs as follows:
Project administration and management associated with planning, scheduling, monitoring, controlling, and coordinating with the variety of entities needed to ensure the construction project achieves LEED certification by the USGBC. Activities include those that require administrative time and resources. Do not include labor or material costs for components that become a permanent part of the structure. Include costs for tests, inspections, verification of product certification or standards, record keeping, report writing, submittals of necessary documents and meeting with various officials, including ones from USGBC.
This accumulative accounting shall be attached to each Progress Payment request and will not be paid separately.
3. The offer due date remains May 26, 2010 @ 3:00 PM, local time, Siuslaw National Forest, Corvallis OR.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
MONTY BELL – CONTRACTING OFFICER
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
BY ____Monty Bell______ (Signature of Contracting Officer) May 18, 2010
NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE
Computer Generated Prescribed by GSA
FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .