J- 2 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S150022_Q A_2015_0623.pdf | ||
| S150022_Amend_02.pdf | ||
| S150022_Q A_2015_0617.pdf | ||
| S150022_Amend_01.pdf | ||
| Fishtrap_Sample.pdf | ||
| RFP_S150022_RdDecomIDIQ.pdf | ||
| ExperienceQuestionnaire.pdf | ||
| MT150080_2015_0109.pdf | ||
| Drawings.pdf | ||
| Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Table of Contents
Supplemental Specifications
Table of Contents 151 - Mobilization 203 - Removal of Structures and Obstructions 211 – Closing, Obliteration, or Treatment of Existing Roads 622 - Rental Equipment
151 - Mobilization
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.
Construction Requirements
151.02 Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.
Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Use methods of cleaning and locations for cleaning approved by the CO.
For work at a commercial washing facility, use an approved facility.
New infestations of noxious weeds of concern to Forest Service and identified by either
Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
151.03 Clean all track equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.
Measurement
151.03 Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS and the following as applicable.
Measurement (Lump Sum). Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "All." Estimated quantities of lump sum work shown in the contract are approximate.
Payment
151.04 The accepted quantity will be paid at the contract price per unit of measurement for the
Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5
Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for
Mobilization. Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.
Section 157. — SOIL EROSION CONTROL
Description
157.01 This work consists of furnishing, constructing, and maintaining permanent and temporary erosion and sediment control measures.
157.02 General. Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.
Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:
(a) The construction activities and sequence of implementation relating to specific erosion control measures.
(b) The location and type of permanent controls to be implemented during construction.
(c) The location and type of temporary controls to be implemented during construction.
(d) For work in stream channels with running water a detailed dewatering plan.
When erosion control measures are not functioning as intended, immediately take corrective action.
Measurement and Payment
157.03 Do not measure Soil Erosion Control for payment as it will be considered incidental to other items.
203 - Removal of Structures and Obstructions
203.01 Work. This work consists of salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions. The work shall also include construction slash and debris, unless specified to use for windrows, site scatter, or other final site preparation or erosion controls.
203.02 Salvaging Material. Unless shown on the plans or listed on the worklist, remove all designated material from the project area and National Forest land. Material designated for salvage shall be hauled to a location designated by the CO using hourly equipment rental.
203.03 Removing Material. Material designated for removal shall be removed entirely from the roadbed.
203.05 Disposing of Material. All material designated for removal becomes the property of the
Contractor unless otherwise shown on the plans or designated by the CO. Dispose of all items not designated to be salvaged for the Government in any legal manner.
203.06 Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS and the following as applicable.
Measurement (By-the-Each). One entire unit. The quantity is the actual number of units completed and accepted.
203.07 Basis. The quantities will be paid for at the contract unit price for each PAY ITEM
DESIGNATED IN THE SCHEDULE OF ITEMS. Payment will be full compensation for the work prescribed in this section.
No separate payment will be made for clearing and grubbing, this work will be incidental to the item listed below.
211 – Closing, Obliteration, or Treatment of Existing Roads
211.01 Work Treat roadways by removing rigid material, including culverts and cross drains, constructing water bars, recontouring or scarifying the roadbed, restoring stream crossings and drainage facilities to their original hydrologic function, installing gradient control structures in stream channels; removing selected fill; scattering slash material; and re-vegetating. This work also includes all mobilization of road decommissioning equipment from site to site when road systems are connected.
211.02 Performance Begin work at the road end or designated start location and progress out towards the permanent road closure.
211.03 Clearing and Slash Treatment. When necessary to access the project, clearing will occur concurrently with corresponding closure level treatments. Material generated during clearing shall be shall be placed along the edge where it can be used to scattered along the ripped roadbed or re-contoured surface. Material generated does not need to be limbed and lopped. Do not place slash on the constructed waterbars.
211.04 Treatment of Roadway. Treat the roadway using one of the following methods, as specified in the SCHEDULE OF ITEMS:
(a) Closure Method 3D. Shape the roadway as SHOWN ON THE DRAWINGS to drain water.
Loosen the roadbed by ripping or scarifying along the entire width to provide a seedbed, and promote establishment of vegetation. Rip the roadbed to a minimum depth of 18 inches and a maximum depth of 24 inches. Do not rip the roadway at waterbar locations. Complete at least one pass using a non linear pattern during the ripping procedure. To prevent re-compacting the surface, rip the roadbed in a sequence that will ensure that equipment will not be driven back over the areas. Construct waterbars AS SHOWN ON THE DRAWINGS. Remove culverts when SHOWN ON THE PLANS and treat as specified in Section 203.05. Remove all other structures, such as metal or wooden open top cross drains, rubber belt water diverters and other plastic or metal materials. Scatter slash evenly along the ripped roadbed. Fully re-contour 150’ at the entrance of the roadway.
(b) Closure Method 3S. Shape the roadway as SHOWN ON THE DRAWINGS to drain water.
Loosen the roadbed by ripping or scarifying along the entire width to provide a seedbed, and promote establishment of vegetation. Rip the roadbed to a minimum depth of 6 inches and a maximum depth of 12 inches. Do not rip the roadway at waterbar locations. Complete at least one pass using a non linear pattern during the ripping procedure. To prevent re-compacting the surface, rip the roadbed in a sequence that will ensure that equipment will not be driven back over the areas. Construct waterbars AS SHOWN ON THE DRAWINGS. Remove culverts and gates when SHOWN ON THE PLANS and treat as specified in Section 203.05. Remove all other structures, such as metal or wooden open top cross drains, rubber belt water diverters and other plastic or metal materials. Scatter slash evenly along the ripped roadbed. Fully re-contour
150’ at the entrance of the roadway.
(c) Partial Road Recontour, Closure Method 4. Pull 1/3 – 1/2 of the existing fill slope of outer road prism and deposit this material on the inside portion of the ripped road prism as SHOWN
ON THE DRAWINGS. Leave in an un-compacted condition. Scatter large and small woody debris on the newly recontoured surface. Remove all culverts and treat as specified in
Subsection 211.05 or 203.05. Partial recontour will not achieve original contour, but will restore hydrologic function and eliminate potential road fill failures.
(d) Full Road Recontour, Closure Method 5. Pull all major embankments and deposit this material on the ripped roadbed and contour it to the adjacent side slopes as SHOWN ON THE
DRAWINGS. Leave in an un-compacted condition. Do not place material outside the original roadway limits. Scatter large and small woody debris on the newly recontoured surface.
Remove all culverts and treat as specified in Subsection 211.05 or 203.05.
211.05 Stream Channel Restoration. Treat all drainages with defined channels in accordance with the following:
(a) Treatment of restored channel
Work identified will be AS SHOWN ON THE DRAWINGS and will include proper disposal of all associated culverts as per Subsection 203.05.
Construction and maintenance of permanent and temporary erosion and sediment control measures as per Section 157 (Note: This work shall be considered incidental).
(b) Channel Restoration Performance.
Excavate the roadway fill in the existing draw to the width of the natural channel.
Excavate to the elevation of the original channel or the gradient of the pipe channel, whichever is lower. Slope the stream banks to match the original stream bank contours.
Place excavated material on the road prism against the back slopes along the roadbed.
Ensure that this material is free from slash and/or concentrations of woody debris, frozen soil, ice and snow. Contour the excavated material to match the adjacent slopes as
SHOWN ON THE DRAWINGS. Leave the recontoured slopes in an un-compacted condition.
Scatter slash and woody debris over the newly recontoured area.
Install gradient control structures perpendicular to the stream flow as SHOWN ON THE
DRAWINGS and as directed by the CO. Logs or rocks to be used for this purpose will be designated at or near the stream channel to be restored (the logs may require felling or bucking into the proper lengths). If an insufficient number of logs or rocks are available at a particular site, the CO can designate additional logs or rocks outside the riparian area to meet the contract requirements. Additional work may be performed under Section 622.
211.06 Removing Minor Culverts. Minor culverts and road fills where drainage has not been provided are to be removed as per Section 203. Minor culverts are defined as having less than
10 fit of road fill at centerline of road and diameter less than or equal to 48 inches. After removing the existing culvert and road fill, re-shape the roadbed as SHOWN ON THE
DRAWINGS. Removal and disposal of minor culverts will be a separate PAY ITEM under
Section 203.
211.07 Removing Major Culverts. Major culverts are to be removed as per Section 203.
Minor culverts are defined as having greater than 10 fit of road fill at centerline of road and diameter greater than 48 inches. After removing the existing culvert, re-shape the roadbed as
SHOWN ON THE DRAWINGS. Removal and disposal of major culverts will be a separate
PAY ITEM under Section 203.
211.08 Removing Gates. Gates are to be removed as per Section 203. After removing the existing gate, re-shape the roadbed as SHOWN ON THE DRAWINGS. Removal and disposal of gates will be a separate PAY ITEM under Section 203.
211.09 Establishing Vegetative Cover. Seed all disturbed areas as specified in Section 625 or as SHOWN ON THE DRAWINGS.
211.10 Waterbars. Construct waterbars as SHOWN ON THE DRAWINGS to divert surface water.
211.11 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE
OF ITEMS and the following as applicable.
Measurement (By-the-Each). One entire unit. The quantity is the actual number of units completed and accepted.
Measurement (By-the-Mile). Road decommissioning will be measured in miles and the nearest tenths of miles (5,280 linear feet) along the road centerline of the entire roadway cross-section regardless of the number of passes required for a given length, and shall include only those sections of the roads which are included in the contract and included in accordance with the specifications. Measurement will be by the GPS/GIS of a Forest Service instrament. The instrament will be checked for accuracy and calibrated as necessary. Parking areas, turnouts, and approach road connections are considered as adjuncts to the main roads and shall not be measured separately.
No separate measurement will be made for clearing and grubbing.
211.12 Basis. The quantities will be paid for at the contract unit price for each PAY ITEM
No separate payment will be made for clearing and grubbing, this work will be incidental to the item listed below.
622 - Rental Equipment
Description
622.01 This work consists of furnishing and operating equipment for construction work ordered by the CO and not otherwise provided for under the contract.
Construction Requirements
622.02 Rental Equipment. The CO will order in writing rental equipment for use on the project.
Provide equipment of the type listed in the Schedule of Items. Submit the model number of the equipment to the CO for approval before delivery to the project site. Make equipment available for inspection and approval before use. Provide a capable operator or driver.
Unless approved otherwise by the C.O. equipment shall meet the following requirements:
Excavator. Provide a track mounted hydraulic excavator, less than 20 years old, with at least 84
HP. Bucket must be equipped with a hydraulic "thumb".
Dozer. Provide a crawler tractor (Dozer) with minimum horse power of 100 HP with front blade
1990 model year or newer.
End Dump Truck. Provide an end dump truck with a minimum capacity of 12 cubic yards, less than 15 years old.
Motor Grader. Provide a motor grader with minimum horse power of 150 HP, 14’ moldboard
1990 model or new.
Furnish and operate equipment with such auxiliary attachments, oilers, etc., as are usually needed for efficient operation of the equipment. Keep the equipment in good repair and capable of operating 90 percent of the working time.
Measurement
622.03 Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS and the following as applicable.
Measurement (By-the-Hour). An hour consists of 60 minutes of actual operation of equipment on authorized Government work. Moving of equipment under its own power, when so ordered by the Contracting Officer will constitute authorized work. Nonproductive time, such as lack of operating supplies or qualified operator, service time, time lost by reason of a breakdown or being stuck, or loading time of specified accessories shall not constitute “actual operation”. The equipment shall be operated at its design speed or the maximum speed feasible under the prevailing conditions.
(1) Time Recording. The Government will maintain hours of actual operation. The daily record will constitute the basis for calculating the sum due the Contractor.
(2) The Government will maintain a daily record for each piece of equipment showing:
(i) Contract number and quote item number applicable to the equipment.
(ii) Name of Contractor.
(iii) Hours of operation authorized to nearest quarter hour.
(iv) Hours of actual operation on regular work.
(v) Authorized hours of operation lost and reason.
Round portions of an hour up to the next half hour. Measure time in excess of 40 hours per week at the same rate as the first 40 hours.
Measure time for moving equipment between project work sites. Do not measure nonoperable equipment or equipment dependent upon another piece of nonoperable equipment.
Payment
622.04 The quantities will be paid for at the contract unit price for each PAY ITEM
625 - Turf Establishment
625.01 This work consists of soil preparation, watering, fertilizing, seeding, and mulching.
Seeding and mulching methods are designated as dry or hydraulic.
625.02 General. Apply temporary turf establishment to disturbed areas immediately after each
2000 foot section of road has been treated, unless otherwise agreed by the CO. See section
157.04 for exceptions.
Fertilizer, seed, and mulch applications shall be completed concurrently. All applications must be completed within 24 hours from the start of the revegetation process.
Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise not friable.
625.03 Seeding. Apply the seed with approved power driven seeders, drills, or other mechanical equipment (hand-operated seeding methods are satisfactory).
(a) Dry Method
Furnish the kinds of seed and the amounts to be applied in terms of pure live seed as follows:
NATIVE DRY/HIGHLY DISTURBED ROADSIDE SITE MIX – This mix is appropriate for sites at low to middle elevation (generally < 6000 feet), droughty sites with high potential for noxious weeds, open sites, and areas with longer growing seasons.
Typically these sites can be described as south facing Ponderosa Pine or Douglas-Fir habitat types with less than 20” to 25”of precipitation. It was also developed for areas with a high degree of soil disturbance such as roadside work in dry areas. CERTIFIED
WEED FREE.
RECOMMENDED LBS/ACRE: 12.0
TOTAL SEEDS/FT
: 50
Grass, Forb, and Shrub Species %
Composition
Desired Seeds
/Ft
Seeds/ Lb.
GRASSES:
Mountain brome (Bromus Marginatus) 15 7.5 66,401.00
Idaho fescue (Festuca idahoensis) 30 15 455,193.00
Bluebunch wheatgrass (Pseudoroegneria spicata)
18 9 129,090.00
Slender wheatgrass (Elymus trachycaulus) 10 5 137,383.00
Sandberg bluegrass (Poa secunda) 27 13.5 963,975.00
ACCEPTIBLE SUBSTITUTIONS: If there are issues finding species or pricing contact the Botanist/Native Plant Coordinator for the Forest before any changes are made
625.04 Fertilizer. The fertilizer shall be a slow release organic fertilizer applied at the manufacturer’s recommended rate with an N-P-K formulation within the ranges of:
6-8 % Nitrogen;
2-4 % Phosphorous;
3-4 % Potassium.
The application rates for organic fertilizer are typically much higher than chemical fertilizer due to the low formulation; however, the slow release of the organic fertilizer can persist for 2 – 3 years. This eliminates the need for a follow up fertilization maintenance program.
Approved sources of organic fertilizer include, but are not limited to:
Hendrikus Organics Complete 6-4-4 or 8-2-4
- Application rate used on Bitterroot NF has been 250 lbs/ac.
Available from:
Enhanced Forest Management, Inc.
380 Joseph Drive
Corvallis, MT 59828 1-406-961-8324
Hendrikus Schraven Organics
PO Box 1289
Issaquah, WA 98027 1-425-392-1200
The following links lists the wholesale distributors:
http://www.hendrikusorganics.com/wholesale-distribs.php
Biosol Forte 7-2-1
- Application rate used on Bitterroot NF has been 500 lbs/ac.
Available from:
Rocky Mtn. Bioproducts
10801 E. 54th Avenue
Denver, CO 80239 1-888-696-8960
625.05 Mulching. Mulch material shall be certified weed free straw and shall be applied at a uniform rate to adequately cover the seed. The certified weed free straw shall be a native species or from a grain crop such as barley straw, wheat straw or oat straw. Mulch will be applied at the rate of 1 Ton per Acre.
203.06 Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF
ITEMS and the following as applicable.
Acre (per Acre). 43,560 square feet. Make longitudinal and transverse measurements for area computations horizontally unless specified on the ground surface. Do not make deductions from the area computation for individual fixtures having an area of 500 square feet or less.ne entire unit.
203.07 Basis. The quantities will be paid for at the contract unit price for each PAY
ITEM DESIGNATED IN THE SCHEDULE OF ITEMS. Payment will be full compensation for the work prescribed in this section.