RFP_S150022_RdDecomIDIQ.pdf

PDF 1018 KB Posted

Attached to
Road Decommissioning IDIQ
Solicitation number
AG-03R6-S-15-0022
Issued by

About this file

RFP Solicitation No. AG-03R6-S-15-0022

View the file

Other files

File Type Posted
S150022_Q A_2015_0623.pdf PDF
S150022_Amend_02.pdf PDF
S150022_Q A_2015_0617.pdf PDF
S150022_Amend_01.pdf PDF
Fishtrap_Sample.pdf PDF
ExperienceQuestionnaire.pdf PDF
MT150080_2015_0109.pdf PDF
S150022_Specifications.pdf PDF
Drawings.pdf PDF
Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFEROR'S COPY

NOTE: Attached forms must be completed and submitted intact.

Solicitation No. RFP AG-03R6-S-15-0022 HELP PREVENT FOREST FIRES

IMPORTANT - NOTICE TO OFFEROR

1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.

2. Note: An offer guarantee (Bid Bond) IS NOT REQUIRED for the IDIQ parent contract. Performance, Payment Bonds and/or Alternative Payment Protection will be required within 10 days of Task Order issuance IF it is identified as a Construction task order as opposed to a Services task order. (See Section

I, FAR Clause 52.228-15.)

3. Note: Compliance with all solicitation requirements is mandatory. Prospective offerors should read the following provisions:

L- 3 -- Inquiries

L-14 – Standards of Conduct

FS-6300-45 (11/79)

Issuing Office:

U.S. Department of Agriculture

Forest Service

Western Montana Acquisition Zone

24 Fort Missoula Road

Missoula, Montana 59804

Offers Are Solicited For:

PROJECT

Road Decommissioning IDIQ

Bitterroot and Lolo National Forests

Western Montana

CONSTRUCTION RFP thru FAC 2005-81 – 10 Apr 2015 AG-03R6-S-15-0022

Bitterroot and Lolo NFs

TABLE OF CONTENTS

Page(s)

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM 1 - 2

SECTION B - SUPPLIES OR SERVICES AND PRICES 4 - 10

B- 1 - Schedule of Items

SECTION C - DESCRIPTION/SPECIFICATIONS 11 - 13

C- 1 - Scope of Contract

C- 2 – Location of the Work

C- 3 – Magnitude

C- 4 – Biobased Product Utilization

C- 5 - Government-Furnished Property

C- 6 - Standard Specifications

C- 7 - Drawings

C- 8 – Start Work

C- 9 – Period of Performance

SECTION E - INSPECTION AND ACCEPTANCE 14

E- 1 - Clauses Incorporated by Reference

SECTION F - DELIVERIES OR PERFORMANCE 15

F- 1 - Clauses Incorporated by Reference

F- 2 – Contract Period

F- 3 – Contract Time and Required Rate of Progress

SECTION G – CONTRACT ADMINISTRATION DATA 16 - 17

G- 1 – Contract Authorities

G- 2 – Ordering Procedures

G- 3 – Payments and Invoices

SECTION H - SPECIAL CONTRACT REQUIREMENTS 18 - 23

H- 1 - Clauses Incorporated by Reference

H- 2 - Fire Control

H- 3 - Incidental Payment Items

H- 4 - Conformity with Drawings and Specifications

H- 5 - Local Material Sources

H- 6 - Samples, Tests, Cited Specifications

H- 7 - Barricades, Warning Signs, and Other Devices

H- 8 – Weed-Free Equipment

H- 9 – Pollution and Erosion Control

H-10 – Landscape Preservation

Bitterroot and Lolo NFs

H-11 – Post-Award Conference

H-12 - Invoice Processing Platform

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES 24 - 45

I- 1 - Clauses Incorporated by Reference

I- 2 – Reporting Executive Compensation and First-Tier Subcontract Awards

I- 3 – System for Award Management Maintenance

I- 4 – Service Contract Reporting Requirements

I- 5 - Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants

I- 6 - Post-Award Small Business Program Rerepresentation

I- 7 – Minimum Wages Under Executive Order 13658

I- 8 – Affirmative Procurement of Biobased Products Under Service and Construction Contracts

I- 9 – Buy American – Construction Materials

I-10 – Ordering

I-11 – Minimum and Maximum Contract Amounts

I-12 – Order Limitations

I-13 – Indefinite Quantity

I-14 – Alternative Payment Protections

I-15 – Performance and Payment Bonds - Construction

I-16 – Alternative forms of Security

I-17 – Insurance Coverage

I-18 – Federal, State, and Local Taxes

I-19 – Reimbursement for Bond Premiums – Fixed-Price Construction Contracts

I-20 – Providing Accelerated Payments to Small Business Subcontractors

I-21 – Permits and Responsibilities

I-22 – Authorized Deviations in Clauses

I-23 – Order of Precedence – Construction

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 46

J- 1 - Wage Determination

J- 2 – Specifications

J- 3 – Vicinity Maps

J- 4 – Attachments

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER 47 - 51

STATEMENTS OF OFFERORS AND RESPONDENTS

K- 1 - Annual Representations and Certifications

K- 2 – Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony

Conviction

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 52 - 59

AND RESPONDENTS

Bitterroot and Lolo NFs

L- 1 - Solicitation Provisions Incorporated by Reference

L- 2 – System for Award Management

L- 3 – Inquiries

L- 4 – Facsimile Proposals and E-Mail Proposals

L- 5 – Instructions for the Preparation of Technical and Business Proposals

L- 7 – Amendments to Proposals

L- 8 – Type of Contract

L- 9 – Construction Wage Rates Requirements – Secondary Site of the Work

L-10 – Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

L-11 – Notice of Buy American requirement – Construction Materials

L-12 – Service of Protest

L-13 – Preparation of Proposals – Construction

L-14 – Standards of Conduct

L-15 – Pre-Proposal Conference

SECTION M - EVALUATION FACTORS FOR AWARD 60 - 61

M- 1 – Basis for Contract Award

M- 2 – Rejection of Unrealistic Offers

M- 3 - Source Selection Decision

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

RFP AG-03R6-S-15-0022

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

22 May 2015

PAGE OF PAGES

1 61

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

736882

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

USDA, Forest Service Western Montana Acquisition Zone 24 Fort Missoula Road Missoula, MT 59804

USDA, Forest Service Western Montana Acquisition Zone 24 Fort Missoula Road Missoula, MT 59804

9. FOR INFORMATION

EMAIL:

a. NAME

Greg Treible

b. Email Address gtreible@fs.fed.us

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Bitterroot and Lolo National Forests

Western Montana

Magnitude

IAW FAR 36.204 Disclosure of the magnitude of construction projects is:

Between $250,000 and $500,000*

*but not in excess of $500,000 total for the total contract period. (See AGAR 452.216-73)

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12b.)

YES NO

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original form to perform the work required are due at the place specified in Item 8 by 14:00 hrs local time 23 June 2015 . If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required. (If “is required” see AGAR Clause 452.228-70)

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

Email Address:__________________________________ Duns No. _______________________________________

TIN: ___________________________________________

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

USDA – Forest Service

Western Montana Acquisition Zone

24 Fort Missoula Road

Missoula, MT 59804

All invoices will be processed using the Department of Treasury’s

Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE

30c. DATE

31b. UNITED STATES OF AMERICA

BY

31c. DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85) http://www.ipp.gov/

SECTION B - SUPPLIES OR SERVICES AND PRICES

ROAD DECOMMISSIONING IDIQ

BITTERROOT AND LOLO NATIONAL FORESTS

WESTERN MONTANA

***See next page for Schedule of Items. Offerors shall submit cost proposals for both the Lolo and

Bitterroot National Forests. Proposals that do not include prices for both the Lolo and Bitterroot

National Forests shall not be considered for award.***

B- 1 Schedule of Items

Base Item Year (Lolo National Forest) – (Award of Contract through 30 Apr 2016)

Item No. Description Pay

Unit Estimated

Quantity**

Unit

Price

(Zone 1)

Total

Price

(Zone 1)

Unit

Price

(Zone 2)

Total

Price

(Zone 2)

Unit

Price

(Zone 3)

Total

Price

(Zone 3)

151(01) Mobilization LS 1 $_______ $_______ $_______ $_______ $_______ $_______

203(01)G Removal of Gate Each 2 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MN

Removal of Minor

Culvert Each 7 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MJ

Removal of Major

Culvert Each 5 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D<

Treatment of

Existing

Roadway,method

3D NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D>

Treatment of

Existing

Roadway,method

3D NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(03)S<

Treatment of

Existing

Roadway,method 3S

NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)S>

Treatment of

Existing

Roadway,method 3S

NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(05)<

Treatment of

Existing Roadway, method 5 NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(05)>

Treatment of

Existing Roadway, method 5 NRV > 5

Mile 4 $_______ $_______ $_______ $_______ $_______ $_______

211(11) Stream Channel

Restoration Each 5 $_______ $_______ $_______ $_______ $_______ $_______

622(01)E Equipment Rental, Excavator Hour 20 $_______ $_______ $_______ $_______ $_______ $_______

622(01)D Equipment Rental, Dump Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

622(01)T Equipment Rental, Transport Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

625(01)

Seeding and

Fertilizer, Dry

Method without

Mulch

Acre 20 $_______ $_______ $_______ $_______ $_______ $_______

625(02)

Seeding and

Fertilizer, Dry

Method with Mulch

Acre 10 $_______ $_______ $_______ $_______ $_______ $_______

TOTALS $_______ $_______ $_______ $_______ $_______ $_______

Option Year 1 (Lolo National Forest) – (1 May 2016 through 30 Apr 2017)

Unit Estimated

Quantity**

Unit

Price

(Zone 1)

Total

Price

(Zone 1)

Unit

Price

(Zone 2)

Total

Price

(Zone 2)

Unit

Price

(Zone 3)

Total

Price

(Zone 3)

151(01) Mobilization LS 1 $_______ $_______ $_______ $_______ $_______ $_______

203(01)G Removal of Gate Each 2 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MN

Removal of Minor

Culvert Each 7 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MJ

Removal of Major

Culvert Each 5 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D<

Treatment of

Existing

Roadway,method

3D NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D>

Treatment of

Existing

Roadway,method

3D NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(03)S<

Treatment of

Existing

Roadway,method 3S

NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)S>

Treatment of

Existing

Roadway,method 3S

NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(05)<

Treatment of

Existing Roadway, method 5 NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(05)>

Treatment of

Existing Roadway, method 5 NRV > 5

Mile 4 $_______ $_______ $_______ $_______ $_______ $_______

211(11) Stream Channel

Restoration Each 5 $_______ $_______ $_______ $_______ $_______ $_______

622(01)E Equipment Rental, Excavator Hour 20 $_______ $_______ $_______ $_______ $_______ $_______

622(01)D Equipment Rental, Dump Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

622(01)T Equipment Rental, Transport Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

625(01)

Seeding and

Fertilizer, Dry

Method without

Mulch

Acre 20 $_______ $_______ $_______ $_______ $_______ $_______

625(02)

Seeding and

Fertilizer, Dry

Method with Mulch

Option Year 2 (Lolo National Forest) – (1 May 2017 through 30 Apr 2018)

Unit Estimated

Quantity**

Unit

Price

(Zone 1)

Total

Price

(Zone 1)

Unit

Price

(Zone 2)

Total

Price

(Zone 2)

Unit

Price

(Zone 3)

Total

Price

(Zone 3)

151(01) Mobilization LS 1 $_______ $_______ $_______ $_______ $_______ $_______

203(01)G Removal of Gate Each 2 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MN

Removal of Minor

Culvert Each 7 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MJ

Removal of Major

Culvert Each 5 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D<

Treatment of

Existing

Roadway,method

3D NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D>

Treatment of

Existing

Roadway,method

3D NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(03)S<

Treatment of

Existing

Roadway,method 3S

NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)S>

Treatment of

Existing

Roadway,method 3S

NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(05)<

Treatment of

Existing Roadway, method 5 NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(05)>

Treatment of

Existing Roadway, method 5 NRV > 5

Mile 4 $_______ $_______ $_______ $_______ $_______ $_______

211(11) Stream Channel

Restoration Each 5 $_______ $_______ $_______ $_______ $_______ $_______

622(01)E Equipment Rental, Excavator Hour 20 $_______ $_______ $_______ $_______ $_______ $_______

622(01)D Equipment Rental, Dump Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

622(01)T Equipment Rental, Transport Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

625(01)

Seeding and

Fertilizer, Dry

Method without

Mulch

Acre 20 $_______ $_______ $_______ $_______ $_______ $_______

625(02)

Seeding and

Fertilizer, Dry

Method with Mulch

Base Item Year (Bitterroot National Forest) – (Award of Contract through 30 Apr 2016)

Unit Estimated

Quantity**

Unit

Price

(Zone 1)

Total

Price

(Zone 1)

Unit

Price

(Zone 2)

Total

Price

(Zone 2)

Unit

Price

(Zone 3)

Total

Price

(Zone 3)

151(01) Mobilization LS 1 $_______ $_______ $_______ $_______ $_______ $_______

203(01)G Removal of Gate Each 2 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MN

Removal of Minor

Culvert Each 7 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MJ

Removal of Major

Culvert Each 5 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D<

Treatment of

Existing

Roadway,method

3D NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D>

Treatment of

Existing

Roadway,method

3D NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(04)<

Treatment of

Existing

Roadway,method 4

NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(04)>

Treatment of

Existing

Roadway,method 4

NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(05)<

Treatment of

Existing Roadway, method 5 NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(05)>

Treatment of

Existing Roadway, method 5 NRV > 5

Mile 4 $_______ $_______ $_______ $_______ $_______ $_______

211(11) Stream Channel

Restoration Each 5 $_______ $_______ $_______ $_______ $_______ $_______

622(01)E Equipment Rental, Excavator Hour 20 $_______ $_______ $_______ $_______ $_______ $_______

622(01)D Equipment Rental, Dump Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

622(01)T Equipment Rental, Transport Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

625(01)

Seeding and

Fertilizer, Dry

Method without

Mulch

Acre 20 $_______ $_______ $_______ $_______ $_______ $_______

625(02)

Seeding and

Fertilizer, Dry

Method with Mulch

Option Year 1 (Bitterroot National Forest) – (1 May 2016 through 30 Apr 2017)

Unit Estimated

Quantity**

Unit

Price

(Zone 1)

Total

Price

(Zone 1)

Unit

Price

(Zone 2)

Total

Price

(Zone 2)

Unit

Price

(Zone 3)

Total

Price

(Zone 3)

151(01) Mobilization LS 1 $_______ $_______ $_______ $_______ $_______ $_______

203(01)G Removal of Gate Each 2 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MN

Removal of Minor

Culvert Each 7 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MJ

Removal of Major

Culvert Each 5 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D<

Treatment of

Existing

Roadway,method

3D NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D>

Treatment of

Existing

Roadway,method

3D NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(04)<

Treatment of

Existing

Roadway,method 4

NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(04)S>

Treatment of

Existing

Roadway,method 4

NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(05)<

Treatment of

Existing Roadway, method 5 NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(05)>

Treatment of

Existing Roadway, method 5 NRV > 5

Mile 4 $_______ $_______ $_______ $_______ $_______ $_______

211(11) Stream Channel

Restoration Each 5 $_______ $_______ $_______ $_______ $_______ $_______

622(01)E Equipment Rental, Excavator Hour 20 $_______ $_______ $_______ $_______ $_______ $_______

622(01)D Equipment Rental, Dump Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

622(01)T Equipment Rental, Transport Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

625(01)

Seeding and

Fertilizer, Dry

Method without

Mulch

Acre 20 $_______ $_______ $_______ $_______ $_______ $_______

625(02)

Seeding and

Fertilizer, Dry

Method with Mulch

Option Year 2 (Bitterroot National Forest) – (1 May 2017 through 30 Apr 2018)

Unit Estimated

Quantity**

Unit

Price

(Zone 1)

Total

Price

(Zone 1)

Unit

Price

(Zone 2)

Total

Price

(Zone 2)

Unit

Price

(Zone 3)

Total

Price

(Zone 3)

151(01) Mobilization LS 1 $_______ $_______ $_______ $_______ $_______ $_______

203(01)G Removal of Gate Each 2 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MN

Removal of Minor

Culvert Each 7 $_______ $_______ $_______ $_______ $_______ $_______

203(01)MJ

Removal of Major

Culvert Each 5 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D<

Treatment of

Existing

Roadway,method

3D NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(03)D>

Treatment of

Existing

Roadway,method

3D NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(04)<

Treatment of

Existing

Roadway,method 4

NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(04)>

Treatment of

Existing

Roadway,method 4

NRV > 5

Mile 6 $_______ $_______ $_______ $_______ $_______ $_______

211(05)<

Treatment of

Existing Roadway, method 5 NRV < 4

Mile 2 $_______ $_______ $_______ $_______ $_______ $_______

211(05)>

Treatment of

Existing Roadway, method 5 NRV > 5

Mile 4 $_______ $_______ $_______ $_______ $_______ $_______

211(11) Stream Channel

Restoration Each 5 $_______ $_______ $_______ $_______ $_______ $_______

622(01)E Equipment Rental, Excavator Hour 20 $_______ $_______ $_______ $_______ $_______ $_______

622(01)D Equipment Rental, Dump Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

622(01)T Equipment Rental, Transport Truck Hour 10 $_______ $_______ $_______ $_______ $_______ $_______

625(01)

Seeding and

Fertilizer, Dry

Method without

Mulch

Acre 20 $_______ $_______ $_______ $_______ $_______ $_______

625(02)

Seeding and

Fertilizer, Dry

Method with Mulch

** Estimated Quantities are for the purpose of evaluating prices. Quantities are not guaranteed except as noted in AGAR 452.216-73 and the Ordering clauses.

NOTE 01: Costs for mobilization shall include all expenses associated with mobilizing all equipment necessary to complete the work. The contractor will be expected to complete work anywhere on the Lolo or Bitterroot National Forests (See Attached Vicinity Maps), however, a point of hire will be designated for each task order. All moves between job locations will be paid with hourly equipment rental by either equipment rates or transport rates indicated on the bid schedule.

NOTE 02: Zone is defined by Department of Labor Wage Determination. (See Paragraph J- 1)

NOTE 03: Award of this solicitation will result in one or two Indefinite-Delivery/Indefinite Quantity contract(s) with Option Years.

SECTION C - DESCRIPTION/SPECIFICATIONS

C- 1 Scope of Contract

The Contractor shall furnish everything necessary, including but not limited to all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road decommissioning on the Lolo National Forest and Bitterroot National Forest. This work includes various forms of road decommissioning that is necessary to complete the project in accordance with the plans and specifications including road ripping and re-contouring, gate and culvert removals, stream crossing rehabilitation, applying seed/mulch/fertilizer, and mobilizing equipment to the designated point of hire. The existing condition of these roads ranges from drivable by a truck to completely overgrown.

Task Orders will be issued by the Government for work ordered under this contract. Task Orders will include specific descriptions and maps for the work to be accomplished.

C- 2 Location of Work

The work is located throughout the Ranger Districts of the Lolo and Bitterroot National Forests.

Information regarding the work will be provided with the Task Orders. Task Orders will include specific lists of roads and appropriate maps for that Task Order. The roads shall be staked using painted wood lath with road number printed. Stakes shall be placed at the beginning of each road.

C- 3 Magnitude

Disclosure of Magnitude of Construction Projects, per FAR 36.204, is between $250,000 and $500,000.

C- 4 Biobased Product Utilization

The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of

2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C.

8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in

Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening

Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and

Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.

The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s

Representative (COR).

The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Grease Removers Insulating Foam Concrete and Asphalt Release Fluids

Fluid-filled Transformers Wood and Concrete Sealers Composite Panels

Adhesive and Mastic Removers Carpets Roof Coatings

Hydraulic Fluid Water Tank Coatings

Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.

In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred

Program, the Contractor is encouraged to use other commercially available biobased products.

The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract (see Section L, Clause L- * - Instructions for the

Preparation of Technical and Business Proposals).

Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).

Within thirty (30) days of contract award, the Contractor shall submit an Operation Plan. This submittal will be approved by the COR in writing. The Contractor shall not commence work until this submittal is approved by the COR in writing. The Plan must be reviewed and updated annually, and as required by the COR. The Plan must contain and define the following elements:

The Contractor’s written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.

Detail on how the Contractor intends to keep abreast of the development and increasing availability of designated and non-designated biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.

Proposed biobased construction products which must be selected in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.

NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.

The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.

http://www.biopreferred.gov/

The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract. The data shall be submitted to the COR quarterly.

A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.

C- 5 Government-furnished Property/Material

None

C- 6 Specifications

See Section J for the list of attachments including the Specifications that are incorporated into this solicitation and any resultant contract.

C- 7 Drawings

See Section J for the listing of Drawings that are incorporated into this solicitation and any resultant contract.

C- 8 Start Work

See Section F.

C- 9 Period of Performance

See Section F.

SECTION E - INSPECTION AND ACCEPTANCE

E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition

Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996) http://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html

SECTION F - DELIVERIES OR PERFORMANCE

F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition

52.242-14 Suspension of Work (APR 1984)

52.242-15 Stop Work Order (AUG 1989)

F- 2 Contract Period

The contract period of this contract is from the date of contract award through the last option period exercised by the Government as defined here:

Contract Year Start of Contract/Option Date Last Day a Task Order May Be Issued

Base Year

Award Date of Contract

April 30, 2016

Option 1

May 1, 2016

April 30, 2017

Option 2

May 1, 2017

April 30, 2018

Task Orders may be issued by the Government at any time during the contract period.

F- 3 Contract Time and Required Rate of Progress

The contract time and estimated start work date for each Task Order will be identified by the Contracting

Officer on the Task Order at the time the Task Order is issued to the Contractor and will be measured by a number of calendar days. If the Contractor is issued multiple Task Orders with overlapping performance periods, additional contract time may be allowed to complete the necessary work. Contract time for individual Task Orders may extend past the last day of the total contract period. (Also see FAR Clause

52.216-22 Indefinite Quantity).

The count of contract time for each Task Order will start on the date specified on the Notice to Proceed.

The Contractor shall maintain progress at a rate which will assure completion of work within the contract time specified. The estimated start work date for each Task Order will be identified by the CO in each Task

Order at the time it is issued by the CO.

SECTION G – CONTRACTING ADMINISTRATIVE DATA

G- 1 – Contract Authorities

G- 1.1 Contracting Officer

(a) Procuring (Parent IDIQ) Contracting Officer. The Procuring (Parent IDIQ) Contracting

Officer for this contract is:

Gregory L. Treible

Contracting Officer

USDA Forest Service

Region 1 Acquisition Management

24 Fort Missoula Rd.

Missoula, MT 59804

Email: gtreible@fs.fed.us

Phone: 406/329.3889

FAX: 406/329.3876

(b) Task Order Contracting Officer: Contracting Officer – Ordering Authorization. Any

USDA Forest Service Contracting Officer with warrant authority up to the dollar limit of their respective warrant is hereby authorized to issue Task Orders under this contract in accordance with this contract. See Paragraph C- 2, Location and Description, for authorized project locations.

G- 1.2 Contracting Officer’s Representative (COR)

(a) Contract COR. The COR for this (parent) contract is:

To be determined after contract award.

(b) Task Order COR’s. The Contracting Officer who issues the Task Order will designate

COR’s for each Task Order at the time the Task Order is issued. All COR’s designated on

Task Orders issued under this task order shall provide the Parent Contract Contracting

Officer’s Representative with a written monthly status report containing any information required by the Parent Contract COR.

G- 2 – Ordering Procedures

(a) New Project Identification and Approval. Projects will be identified on an as-needed basis.

Projects may be inititated by the Bitterroot and Lolo National Forests (See Paragraph C- 2). The aforementioned USDA Forest Service units will obtain approval of all proposed projects from the

Contract Contracting Officer’s Representative (See Paragraph G- 1.2(a)) prior to submitting the proposed project to their unit’s servicing Contracting Officer for processing.

mailto:gtreible@fs.fed.us

(b) Initiation of Task Orders. Once project approval is obtained from the Contract COR, Task

Orders shall be intitiated by submitting the following to the unit’s servicing Contracting Office:

IAS Requisition

Task Order Cover Sheet including:

i. location and description of the work ordered by the Task Order

ii. contract time in terms of a number of calendar days and estimated Notice to

Proceed date.

Project Maps

Evidence of the project’s approval by the Contract COR (eg: an email).

(c) Task Order Preparation and Negotiation. The unit issuing Contracting Officer will prepare a

Task Order using rates on the schedule of items competed under the parent contract and determined to be fair and reasonable; and based on location.

(d) Task Order Issuance. The unit issuing Contracting Officer will award the Task Order and provide a copy to the Parent Contract Contracting Officer (eg: a task order file under the parent contract file on the o.drive) for maintenance of the contract and monitoring contract totals. Order may be issued by email, hard copy, facsimile or by other electronic means.

(e) Evaluation of Task Order Effort Completed by Contractor. The Task Order COR, with input from the inspectors, shall complete an evaluation of the Contractor’s performance on an interim basis (eg: one per year). The Contract Contracting Officer shall include CPARS reports in the parent IDIQ.

Any USDA Forest Service Contracting Officer may issue Task Orders to the Contractor within the limits of their warrant authority. Order(s) may be issued by mail, facsimile, E-mail, or orally and confirmed in writing. Task Orders will be considered “issued” at the time they are mailed, faxed, E-mailed or verbally issued by the Contracting Officer. If more than one method is used to place the order, the date of the earliest provable method will be the date of issue.

G- 3 – Payments and Invoices

All invoices shall be submitted via the Department of Treasury’s Invoice Processing Platform (IPP). The contractor must follow the instructions found at the websites listed below on how to register and submit invoices via IPP. Paper copies of invoices will no longer be accepted. This is a mandatory requirement initiated by the U.S. Department of Agriculture. Failure to comply with this direction may result in late or delayed payments without interest.

You can find more information at https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm. To establish your account.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-72 Use of Premises (NOV 1996)

H- 2 Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the

Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting

Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by

State law, the Contractor shall comply with each of the following provisions to the extent applicable to the

Contractor’s operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard

5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive

Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or

1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a

Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer. The Contractor shall provide at a location satisfactory to the Contracting

Officer, a serviceable truck or trailer, equipped with a fire fighting tanker unit to be kept ready for instant use for suppressing forest fires. The unit shall consist of a tank of not less than 100-gallon capacity upon which shall be mounted a live hose reel or live hose basket with 250 feet of at least ¾-inch I.D. heavy-duty rubber hose; a portable or power takeoff pump with discharge capacity of at least 10 gallons per minute at

150 P.S.I. pressure. Gear type pumps shall be provided with a bypass or pressure relief valve so that the hose nozzle may be shut while the pump is operating. Each tanker unit shall have a hose nozzle of the shut-off type, adjustable for straight stream, spray or fog, at least 12 feet of 1-inch suction hose with an intake screen, and additional 250 feet of 3/4 –inch heavy-duty rubber hose or 1-inch cotton jacket rubber-lined or linen hose to be carried on the unit for use as needed. Tools, adapters, accessories and fuel necessary to operate the pump and truck or trailer shall be provided. If a trailer is used, a serviceable vehicle with proper trailer tow hitch shall be located at a point satisfactory to the Contracting Officer. Where water is available, a supply sufficient for rapidly filling the water tank shall be provided at one or more accessible points along or adjacent to the main truck roads.

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Obtain a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H- 3 Incidental Payment Items

The intent of the contract is to provide for the complete construction of the project described in the Task

Orders issued under this IDIQ parent contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete

Task Orders in accordance with drawings, specifications, and provisions of the contract. Payment for Task

Order work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

H- 4 Conformity With Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

H- 5 Local Material Sources

(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.

The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.

When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.

Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.

(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the

Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.

H- 6 Samples, Tests, Cited Specifications

Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.

H- 7 Barricades, Warning Signs, and Other Devices

The Contractor shall exercise due caution and care when operating to prevent undue conflict with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .