J-4_Drawings_M-C_Boat_Docks.pdf
PDF 2 MB Posted
- Solicitation number
- AG-03H6-S-15-0006
About this file
J-4 - Drawings M-C Boat Docks
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:SHEET INDEX
OPTIONAL BID ITEMS BREAKOUT PER HNF USFS REQUEST CP 6.12.15
DECEMBER 2014
1-13296
MERIWETHER-COULTER BOAT DOCK
RECONSTRUCTION
CONSTRUCTION PLANS FOR
SECTIONS 19 & 30, TOWNSHIP 13 NORTH, AND RANGE 2 WEST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION ONE
HELENA NATIONAL FOREST
HELENA RANGER DISTRICT
LEWIS & CLARK COUNTY, MONTANA
PROJECT LOCATION
MERIWETHER PICNIC AREA
- GABION ROCK SOURCE
- SEEDING
NOTE:
DRAWING SCALE IS ONLY ACCURATE
WHEN PLANS ARE PLOTTED ON 11" X 17"
(TABLOID)-SIZED PAPER.
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
Missoula
Miles City
Malta Kalispell
Helena
Hamilton
Great Falls
Glendive
Butte
Bozeman Billings
CANADA
WYOMING
N O
R
TH
D
AK
O
TA
IDAHO
HavreShelby
Wolf Point
- SITE ACCESS BY BOAT ONLY
- CONTRACTOR RESPONSIBLE FOR DAILY
MARINA LAUNCH/USE FEES FOR CONSTRUCTION
GENERAL PLAN SHEETS
SHEET 1 COVER
SHEET 2 GENERAL NOTES & TYPICAL FLOATING DOCK MODULE
SHEET 9 BULKHEAD & SIGNAGE DETAILS
MERIWETHER PICNIC AREA IMPROVEMENTS
SHEET 3 MERIWETHER SITE PLAN & ESTIMATED QUANTITIES
SHEET 4 MERIWETHER RECREATIONAL DOCK LAYOUT
SHEET 5 MERIWETHER TOUR BOAT DOCK LAYOUT
SHEET 6 MERIWETHER USFS BARGE MOORING
COULTER CAMPGROUND BOAT DOCKS
SHEET 7 COULTER SITE PLAN & ESTIMATED QUANTITIES
SHEET 8 COULTER DOCK LAYOUT
PLANS PREPARED BY:
COLE PEEBLES, P.E.
QA/QC BY:
KARL YAKAWICH, P.E.
DATE
DATE
DATE
APPROVED:
RECOMMENDED:
APPROVED:
DATE
APPROVED:
PROJECT LOCATION
(HOLTER LAKE)
PROJECT LOCATION
COULTER CAMPGROUND
CONSTRUCTION
ACCESS & EXIST.
DOCK STORAGE
GATES OF THE
MOUNTAINS MARINA
MERIWETHER-COULTER BOAT DOCK
RECONSTRUCTION
GENERAL NOTES & TYPICAL FLOATING DOCK MODULE
HELENA AND LEWIS & CLARK NATIONAL FORESTS
1-13296 DECEMBER 2014 SHEET NO.
2 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
SPECIFICATIONS:
SUPPLIER-DESIGNED DOCK SYSTEM:
STRUCTURAL PIPE/TUBE FOR STIFFARMS ͛:
STEEL CABLE FOR CROSS-LINKAGES ͛:
STEEL HARDWARE FOR CROSS-LINKAGES ͛:
CONCRETE FOR BULKHEADS :
REINFORCING STEEL:
GENERAL HARDWARE AND STRUCTURAL STEEL:
FABRICATION AND WELDING:
WORKMANSHIP AND GENERAL USE OF CARE:
SITE SAFETY AND SECURITY:
DEMOLITION, REMOVAL & DISPOSAL:
SUBMITTALS:
FIELD VERIFICATION:
SITE ACCESS AND IN-RIVER WORK:
EROSION CONTROL & WEED PREVENTION:
GABIONS AND GABION ROCK:
AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS:
CONTRACTOR SUPPLIED TOOLS AND REPLACEMENT HARDWARE:
PRECAST CONCRETE UNITS:
ALL-IN-ONE FLOATING DOCK MODULE DESIGN CHARACTERISTICS:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
MERIWETHER SITE PLAN & ESTIMATED QUANTITIES
HELENA NATIONAL FOREST
1-13296 DECEMBER 2014 SHEET NO.
3 OF 9CSP
CSP
KFY
WBL
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
POINT NORTHING EASTING ELEVATION DESCRIPTION
CP-1 5000.00 10000.00 1000.00 REBAR W/ CAP
CP-2 4928.45 10001.77 1000.28 REBAR W/ CAP
CP-3 5265.99 10004.55 1004.64 REBAR W/ CAP
CP-4 5391.78 9897.75 1001.09 REBAR W/ CAP
CP-5 5454.00 9889.49 1001.11 REBAR W/ CAP
CP-6 5177.78 10027.86 1001.22 MARK ON CRIB WALL
1. SURFACE CONTOURS DEPICT THE EXISTING TOPOGRAPHY & RIVER BOTTOM.
2. THE CONTRACTOR'S WORK PLAN WILL DETAIL EQUIPMENT AND MATERIAL
STAGING WITH SPECIAL EMPHASIS PLACED ON MINIMIZING CONSTRUCTION
DISTURBANCES, WHERE FEASIBLE.
3. CLEARING AND GRUBBING (AS REQUIRED) AT THE MERIWETHER SITE SHALL BE
INCIDENTAL TO THE PROJECT AND WILL NOT BE PAID AS A SEPARATE BID ITEM.
4. CONTRACTOR SHALL PRESERVE AND PROTECT ALL TREES (OR OTHER
VEGETATION) NOT INDICATED FOR CLEARING/REMOVAL.
5. THE CONTRACTOR WILL IMPLEMENT PRUDENT EROSION CONTROL MEASURES
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
6. THE CONTRACTOR SHALL FIELD SORT AND/OR SCREEN THE EXISTING ROCK
SLIDE DEBRIS FOR ACCEPTABLY-SIZED ROCK TO FILL GABION BASKETS AND
REVET MATTRESSES IN ORDER TO CONSTRUCT THE BARGE MOORING.
FOLLOWING MOORING CONSTRUCTION, RE-GRADE GABION ROCK EXCAVATION
AND SCREENING AREA(S) TO APPROXIMATE THE SURROUNDING
TOPOGRAPHY. THE C.O. WILL DESIGNATE APPROVED ROCK EXCAVATION
LOCATION(S) BEGINNING NEAR THE PICNIC SHELTER. WORK IS INCIDENTAL TO
BID ITEMS 25302 & 25309.
7. THE EXISTING SURVEY CONTROL WILL SERVE AS THE CONSTRUCTION
BASELINE AND ELEVATION DATUM FOR THE PROJECT IMPROVEMENTS. THE
CONTRACTOR SHALL IMPLEMENT MEASURES TO PROTECT THE EXISTING
CONTROL POINTS SUCH THAT THEY ARE NOT DAMAGED, OR OTHERWISE
RENDERED UNUSABLE. ANY DAMAGES TO (OR LOSS OF) SITE CONTROL AS A
RESULT OF THE CONTRACTOR'S NEGLIGENCE WILL BE THE RESPONSIBILITY
OF CONTRACTOR. PROTECTION AND PROPER USE OF CONTROL POINTS IS
INCIDENTAL TO THE PROJECT.
BASE BID
ITEM NO. DESCRIPTION METHOD OF
MEASUREMENT UNIT QUANTITY
15101-A GENERAL MOBILIZATION LSQ LS 1
15713-A SOIL EROSION AND POLLUTION CONTROL LSQ LS 1
20806-A STRUCTURE EXCAVATION LSQ LS 1
25100-A PLACED WAVE ARMORING, CLASS 4 RIPRAP CQ CY 25
25302-A GABIONS, GALVANIZED CQ CY 32
25309-A REVET MATTRESS, GALVANIZED CQ CY 10
25406-A TREATED TIMBER CRIB RETAINING WALL REPAIRS AQ EA 5
30809-A CRUSHED AGGREGATE, COMPACTION METHOD 1 (COMMERCIAL SOURCE) CQ CY 9
55204-A STRUCTURAL CONCRETE FOR BULKHEADS, CLASS C(AE) CQ CY 20
553A04-A PRECAST CONCRETE MEMBER, MEDIAN BARRIER FOR BARGE ANCHORAGE AQ EA 2
62301-A GENERAL LABOR AQ HR 12
63301-A SIGN SYSTEM AQ EA 3
64501-A PREFABRICATED ALUMINUM GANGWAY, STANDARD - 4-FOOT WIDTH AQ EA 3
64604-A FLOATABLE DOCK SYSTEM - COMBINATION DECKING AND FLOATATION CQ SF 2155
64605-A FLOATABLE DOCK SYSTEM - MAINTENANCE TOOLS & EXTRA PARTS LSQ LS 1
64701-A PREFABRICATED STIFFARM AND CONNECTIONS AQ EA 7
64702-A ACCESSIBLE TOUR BOAT RAMP & ACCESS STAIRS ON MAIN HEADER DOCK LSQ LS 1
65203-A CROSS CABLE, TURNBUCKLES & HARDWARE, STAINLESS STEEL AQ EA 10
67513-A BUMPER, LAMINATED FABRIC-IMPREGNATED RUBBER PAD (4.5 X 24 X 11-INCH) AQ EA 6
OPTION 2 BID ITEM
ITEM NO. DESCRIPTION METHOD OF
MEASUREMENT UNIT QUANTITY
20304-A DEMOLISH, REMOVE & DISPOSE OF EXIST. MERIWETHER DOCKS (16 SLIPS) LSQ LS 1
*INFORMATION ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE
1. ALL TIMBER FOR CRIB RETAINING WALL MEMBER REPAIR/REPLACMENT SHALL BE OF COASTAL REGION DOUGLAS-FIR, NO. 2 GRADE OR BETTER, CONFORMING TO THE CURRENT WWPA GRADING RULES FOR WESTERN LUMBER OR CURRENT WCLIB STANDARD GRADING RULES FOR WESTERN COAST LUMBER. ALL TIMBER MEMBERS SHALL BE INCISED AND PRESSURE TREATED IN ACCORDANCE WITH AWPA U1 USING PENTACHLOROPHENOL OR COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT). TREAT TO USE CATEGORY UC4B. COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WWPI'S "BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS". REPAIR WORK WILL REQUIRE APPROXIMATELY 50 FEET OF 8"x8" TIMBER. SUPPLY TIMBER IN LENGTHS OF 8 FEET (OR LONGER).
2. SECURE WALL MEMBERS WITH 5
8-INCH Ø DRIFT PINS ANCHORED A MINIMUM OF 6 INCHES INTO THE UNDERLYING MEMBERS. PRE-BORE HOLES 1/16-INCH
SMALLER THAN THE DRIFT PIN DIAMETER.
3. PENTACHLOROPHENOL OR COPPER NAPHTHENATE MEETING AWPA P-8 WITH TYPE A SOLVENT MEETING AWPA P-9 SHALL BE FURNISHED FOR FIELD TREATING OF WOOD. ALL ABRASIONS, FIELD DRILLED HOLES, AND FIELD CUTS SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE
FIELD PRESERVATIVE TREATMENT SOLUTION.
4. THE FOLLOWING COMPLIANCE CERTIFICATES SHALL BE FURNISHED UPON DELIVERY:
4.1. CERTIFICATION OF PRESERVATIVE, PENETRATION IN INCHES, AND RETENTION IN POUNDS PER CUBIC FOOT (ASSAY METHOD) BY EITHER A QUALIFIED TESTING AND INSPECTION AGENCY OR SUPPLIER CERTIFICATION. SUPPLIER CERTIFICATION REQUIRES EACH SOLID PIECE TO BE STAMPED OR BRANDED WITH THE ALSC QUALITY MARK.
4.2. SUPPLIER CERTIFICATION THAT ALL TREATED WOOD MATERIALS WERE TREATED IN ACCORDANCE WITH AND MEET THE REQUIREMENTS OF WWPI'S "BEST MANAGEMENT
PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS".
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
MERIWETHER RECREATIONAL DOCK LAYOUT
LEWIS & CLARK COUNTY, MONTANA
1-13296 DECEMBER 2014 SHEET NO.
4 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
1. CONTRACTOR SHALL BACKFILL AND GRADE DISTURBED EARTHWORK SURFACES ADJACENT TO NEW BULKHEADS TO ELIMINATE TRIPPING HAZARDS AND TO BLEND THE IMPROVEMENTS TO TIE INTO THE EXISTING TOPOGRAPHY. FINISHED CUT AND FILL SLOPES SHALL BE CONSTRUCTED EVENLY WITHOUT UNDRAINED DEPRESSIONS AND AT GRADES OF 10H:1V (OR LESS STEEP). BACKFILL PLACEMENT SHALL BE PERFORMED IN UNIFORM LIFTS UTILIZING SUITABLE EXCESS EXCAVATED SOILS. COMPACT BACKFILL MATERIALS TO AN UNYIELDING CONDITION. PRIOR TO EXCAVATION, SALVAGE TRAIL SURFACING AND REPLACE DURING FINISH GRADING. ALL FINISH GRADE WORK IS INCIDENTAL TO BID ITEM NO. 20806.
2. STIFFARMS SHALL BE AFFIXED TO DOCK MODULES VIA HEAVY-DUTY, 4-POCKET STIFFARM BRACKETS. FOR THE PURPOSES OF THIS PROJECT, ONE COUPLER POCKET CONNECTION SHALL CONSIST OF SECURE FIXMENT OF THE UPPER & LOWER DOCK POCKETS UTILIZING RUBBERIZED, TAPERED POCKET-SHAPED
CONNECTORS.
3. STIFFARM CROSS-LINKAGES SHALL CONSIST OF WIRE ROPE CABLES WITH INTEGRAL TURNBUCKLES.
TURNBUCKLES SHALL BE POSITIONED ADJACENT TO THE CONCRETE BULKHEADS TO ALLOW FOR
ADJUSTMENT FROM THE SHORELINE. AT FINAL INSTALLATION, CROSS-LINKAGE CABLES AND STAY CABLES SHALL BE POST-TENSIONED BY THE CONTRACTOR. POST TENSION CABLES TO LOAD(S) APPROPRIATE FOR THE DOCK STRUCTURE AND INTENDED APPLICATION (BUT NO MORE THAN 200 POUNDS). TURNBUCKLES SHALL HAVE BETWEEN 3" AND 4" OF TENSILE ADJUSTMENT REMAINING AFTER FINAL INSTALL. THE DOCK SUPPLIER SHALL DESIGN THE SYSTEM & BULKHEAD CONNECTIONS ACCORDING TO THE GENERALIZED REQUIREMENTS OUTLINED HEREIN AND ON SHEET 9. THE INDIVIDUAL STIFFARMS SHALL BE DESIGNED TO INTENTIONALLY FAIL VIA A SHEARING PIN (OR OTHER REPLACEABLE/SACRIFICIAL PART) IN THE EVENT THAT TENSILE FORCES IN THAT MEMBER SHOULD EXCEED THE DESIGNATED LOAD. THE CROSS-LINKAGES WILL BE INTEGRAL TO STIFFARM AND DOCK STABILITY DURING NORMAL OPERATION. HOWEVER, IN THE EVENT THAT THE DESIGNATED TENSILE FORCE IS EXCEEDED IN THE MAIN STIFFARM MEMBER, THE CROSS-LINKAGE ATTACHMENTS/LOCATIONS SHOULD BE DESIGNED IN SUCH A WAY THAT THE CABLES DO NOT PREVENT THE DESIGNED TENSILE FAILURE MODE OR ABSORB THE TENSILE LOADING IMMEDIATELY FOLLOWING STIFFARM MEMBER FAILURE. THE INTENT OF THIS STIPULATION IS TO LIMIT THE POTENTIAL FOR BULKHEAD PULL-OUT IN
THE UNLIKELY EVENT OF A DIRECT BOAT IMPACT TO THE DOCK SYSTEM.
4. FOLLOWING INSTALLATION OF DOCK, ANCHORAGE COMPONENTS, CONNECTIONS, AND ALL ACCESSORIES, THE CONTRACTOR SHALL SUPPLY AND INSTALL NEAT FITTING POCKET FILLERS IN ALL EMPTY TOP POCKETS.
5. INSTALL 8-INCH LONG (BLACK) NYLON TIE-UP CLEATS AT 6.5 FEET O.C. (OR CLOSER). CONNECT CLEATS VIA T-TYPE NUTS THAT ARE MOLDED INTO THE DOCK MODULES/SECTIONS. BEGINNING AT THE RIVERSIDE ENDS OF THE DOCK FINGERS INSTALL A MINIMUM OF 3 CLEATS (PER SIDE) FOR EACH FINGER. INSTALL ONE CLEAT ALONG THE BOW FACE OF THE MAIN/HEADER DOCK TO BE LOCATED MIDWIDTH OF EACH DOUBLE SLIP AND
NEAR THE HEADER DOCK END FOR SINGLE SLIPS.
6. PRIOR TO COMPLETION OF THE DOCK SYSTEM INSTALLATION, THE CONTRACTOR SHALL STAMP, ENGRAVE, OR OTHERWISE PERMANENTLY MARK (WITHOUT COMPROMISING STRUCTURAL INTEGRITY AND FLOTATION) EACH STIFFARM, GANGWAY, DOCK MODULE/SECTION, CROSS-LINKAGE, OR OTHER COMPONENT RELATIVE TO ADJACENT CONNECTION/ATTACHMENT POINTS. FLOTATION MODULES SHOULD BE MARKED ON THE VERTICAL SURFACES OF BUTT JOINTS SUCH THAT MARKS CANNOT BE SEEN WHEN THE SYSTEM IS FULLY ASSEMBLED. THE PURPOSE OF THESE IDENTIFYING MARKS IS TO ALLOW FOR EASE OF REASSEMBLY BY FOREST PERSONNEL FOR DOCK SYSTEMS THAT MAY BE TAKEN APART ON A SEASONAL BASIS. PLACE
IDENTIFIER MARKS IN THE LEAST CONSPICUOUS LOCATIONS POSSIBLE.
7. COMPONENT MARKING, TIE UP CLEATS, POCKET FILLERS, MODULE COUPLERS, BUMPERS, SAY CABLES, AND
ALL CONNECTIONS, HARDWARE, & APPURTENANCES ARE INCIDENTAL TO BID ITEM NO. 64604.
8. GANGWAY FRAMES & RAILINGS SHALL BE CONSTRUCTED OF EXTRUDED AND/OR ROLLED ALUMINUM SHAPES.
EACH GANGWAY SHALL WEIGH LESS THAN 340 LBS (INCLUDING DECKING AND RAILING). MAXIMUM GANGWAY THICKNESS FROM TOP OF DECKING TO BOTTOM OF STRUCTURAL SUPPORTS SHALL BE 6 INCHES.
9. ͛ DENOTES THAT DOCK SYSTEM/COMPONENT DESIGN IS TO BE PERFORMED BY DOCK SUPPLIER .
FINISH GRADE/IMPROVEMENT ELEVATION
EXISTING GROUND (RIVER BTM) ELEVATION
CONSTRUCTION BASELINE STATIONING
RIGHT OFFSET FROM BASELINE
ASTERISK INDICATES MATCH EXISTING ELEVATION
(CONTRACTOR TO FIELD VERIFY)
FINISH GRADE/IMPROVEMENT ELEVATION
CONSTRUCTION BASELINE STATIONING
LEFT OFFSET FROM BASELINE
POINT NORTHING EASTING ELEVATION STATION
CP-3 5265.99 10004.55 -- 1+00.00
CP-4 5391.78 9897.75 1001.09 1+65.01
CP-5 5454.00 9889.49 -- 2+27.78
MERIWETHER TOUR BOAT DOCK LAYOUT
LEWIS & CLARK COUNTY, MONTANA
1-13296 DECEMBER 2014 SHEET NO.
5 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
1. SIGNAGE POSTS SHALL CONSIST OF 2 OR 2 1
2 -INCH DIAMETER HOT-DIPPED GALVANIZED STEEL (SHC. 40 MIN).
INSTALL PLACARD BOTTOMS 60 INCHES (+/- 1-INCH) ABOVE DECK SURFACE. SECURELY AFFIX TO POSTS TO DOCK UTILIZING TAMPER RESISTANT HARDWARE, WHICH DOES NOT COMPROMISE FLOATATION/INTEGRITY (INCIDENTAL TO 66301). REFER TO DETAIL 4 ON SHEET 9 FOR HANDICAP SIGN PLACARD LETTERING, LAYOUT & DIMENSIONING REQUIREMENTS. PRIOR TO MATERIALS ORDER, THE CONTRACTOR SHALL SUBMIT TO THE C.O.
FOR APPROVAL AN APPROPRIATE "NO PARKING - SLIP RESERVED" (OR SIMILAR) SIGN TYPE FOR THE TOUR BOAT SLIP. TOUR BOAT "RESERVED" SIGN PLACARDS SHALL BE OF THE SAME DIMENSIONS AND MATERIALS AS THOSE LISTED FOR THE HANDICAP SIGN IN DETAIL 4 ON SHEET 9 (INCIDENTAL TO BID ITEM 63301).
2. CONTRACTOR SHALL BACKFILL AND GRADE DISTURBED EARTHWORK SURFACES ADJACENT TO NEW BULKHEADS TO ELIMINATE TRIPPING HAZARDS AND TO BLEND THE IMPROVEMENTS TO TIE INTO THE EXISTING TOPOGRAPHY. FINISHED CUT AND FILL SLOPES SHALL BE CONSTRUCTED EVENLY WITHOUT UNDRAINED DEPRESSIONS AND AT GRADES OF 10H:1V (OR LESS STEEP). BACKFILL PLACEMENT SHALL BE PERFORMED IN UNIFORM LIFTS UTILIZING SUITABLE EXCESS EXCAVATED SOILS. COMPACT BACKFILL MATERIALS TO AN UNYIELDING CONDITION. PRIOR TO EXCAVATION, SALVAGE TRAIL SURFACING AND REPLACE DURING FINISH GRADING. ALL FINISH GRADE WORK IS INCIDENTAL TO BID ITEM NO. 55204.
3. STIFFARMS SHALL BE AFFIXED TO DOCK MODULES VIA HEAVY-DUTY, 4-POCKET STIFFARM BRACKETS. FOR THE PURPOSES OF THIS PROJECT, ONE COUPLER POCKET CONNECTION SHALL CONSIST OF SECURE FIXMENT OF THE UPPER & LOWER DOCK POCKETS UTILIZING RUBBERIZED, TAPERED POCKET-SHAPED CONNECTORS.STIFFARM CROSS-LINKAGES SHALL CONSIST OF WIRE ROPE CABLES WITH INTEGRAL TURNBUCKLES. TURNBUCKLES SHALL BE POSITIONED ADJACENT TO THE CONCRETE BULKHEADS TO ALLOW FOR ADJUSTMENT FROM THE SHORELINE. AT FINAL INSTALLATION, CROSS-LINKAGE CABLES AND STAY
CABLES SHALL BE POST-TENSIONED BY THE CONTRACTOR. POST TENSION CABLES TO LOAD(S)
APPROPRIATE FOR THE DOCK STRUCTURE AND INTENDED APPLICATION (BUT NO MORE THAN 200 POUNDS).
TURNBUCKLES SHALL HAVE BETWEEN 3" AND 4" OF TENSILE ADJUSTMENT REMAINING AFTER FINAL INSTALL.
THE DOCK SUPPLIER SHALL DESIGN THE SYSTEM & BULKHEAD CONNECTIONS ACCORDING TO THE GENERALIZED REQUIREMENTS OUTLINED HEREIN AND ON SHEET 9. THE INDIVIDUAL STIFFARMS SHALL BE DESIGNED TO INTENTIONALLY FAIL VIA A SHEARING PIN (OR OTHER REPLACEABLE/SACRIFICIAL PART) IN THE
EVENT THAT TENSILE FORCES IN THAT MEMBER SHOULD EXCEED THE DESIGNATED LOAD. THE
CROSS-LINKAGES WILL BE INTEGRAL TO STIFFARM AND DOCK STABILITY DURING NORMAL OPERATION.
HOWEVER, IN THE EVENT THAT THE DESIGNATED TENSILE FORCE IS EXCEEDED IN THE MAIN STIFFARM MEMBER, THE CROSS-LINKAGE ATTACHMENTS/LOCATIONS SHOULD BE DESIGNED IN SUCH A WAY THAT THE CABLES DO NOT PREVENT THE DESIGNED TENSILE FAILURE MODE OR ABSORB THE TENSILE LOADING IMMEDIATELY FOLLOWING STIFFARM MEMBER FAILURE. THE INTENT OF THIS STIPULATION IS TO LIMIT THE POTENTIAL FOR BULKHEAD PULL-OUT IN THE UNLIKELY EVENT OF A DIRECT BOAT IMPACT TO THE SYSTEM.
4. SUPPLY AND INSTALL 10-INCH LONG ALUMINUM TIE-UP CLEATS AND DOCK BUMPERS AS SHOWN. CONNECT
CLEATS AND BUMPERS VIA DOCK MODULE POCKET PAIRS. FOLLOWING INSTALLATION OF DOCK,
ANCHORAGE COMPONENTS, CONNECTIONS, AND ALL ACCESSORIES, THE CONTRACTOR SHALL SUPPLY AND
INSTALL NEAT FITTING POCKET FILLERS IN ALL EMPTY TOP POCKETS.
5. PRIOR TO COMPLETION OF THE DOCK SYSTEM INSTALLATION, THE CONTRACTOR SHALL STAMP, ENGRAVE, OR OTHERWISE PERMANENTLY MARK (WITHOUT COMPROMISING STRUCTURAL INTEGRITY AND FLOTATION) EACH STIFFARM, GANGWAY, DOCK MODULE/SECTION, CROSS-LINKAGE, OR OTHER COMPONENT RELATIVE TO ADJACENT CONNECTION/ATTACHMENT POINTS. FLOTATION MODULES SHOULD BE MARKED ON THE VERTICAL SURFACES OF BUTT JOINTS SUCH THAT MARKS CANNOT BE SEEN WHEN THE SYSTEM IS FULLY ASSEMBLED. THE PURPOSE OF THESE IDENTIFYING MARKS IS TO ALLOW FOR EASE OF REASSEMBLY BY FOREST PERSONNEL FOR DOCK SYSTEMS THAT MAY BE TAKEN APART ON A SEASONAL BASIS. PLACE
IDENTIFIER MARKS IN THE LEAST CONSPICUOUS LOCATIONS POSSIBLE.
6. COMPONENT MARKING, TIE UP CLEATS, POCKET FILLERS, MODULE COUPLERS, BUMPERS, SAY CABLES, AND
ALL CONNECTIONS, HARDWARE, & APPURTENANCES ARE INCIDENTAL TO BID ITEM NO. 64604.
7. ͛ DENOTES THAT DOCK SYSTEM/COMPONENT DESIGN IS TO BE PERFORMED BY DOCK SUPPLIER .
FINISH GRADE/IMPROVEMENT ELEVATION
EXISTING GROUND (RIVER BTM) ELEVATION
CONSTRUCTION BASELINE STATIONING
RIGHT OFFSET FROM BASELINE
ASTERISK INDICATES MATCH EXISTING ELEVATION
(CONTRACTOR TO FIELD VERIFY)
FINISH GRADE/IMPROVEMENT ELEVATION
CONSTRUCTION BASELINE STATIONING
LEFT OFFSET FROM BASELINE
POINT NORTHING EASTING ELEVATION STATION
CP-3 5265.99 10004.55 -- 1+00.00
CP-4 5391.78 9897.75 1001.09 1+65.01
CP-5 5454.00 9889.49 -- 2+27.78 ͛
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
MERIWETHER-COULTER BOAT DOCK
RECONSTRUCTION
MERIWETHER USFS BARGE MOORING
LEWIS & CLARK COUNTY, MONTANA
1-13296 DECEMBER 2014 SHEET NO.
6 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
POINT NORTHING EASTING ELEVATION STATION
CP-1 5000.00 10000.00 1000.00 10+00.00
CP-2 4928.45 10001.77 -- 10+71.58
1. CONTRACTOR SHALL SUPPLY STANDARD GABION BASKETS (3"x3" APERTURE SIZE) AND MATTRESSES (3"x1" APERTURE SIZE) IN ORDER TO CONSTRUCT THE BARGE MOORING.
BECAUSE MUCH OF THE ONSITE ROCK (EVEN AFTER SORTING) WILL BE SMALLER THAN 3 INCHES IN DIAMETER, THE CONTRACTOR SHALL PROVIDE AND INSTALL INTERIOR FLUSH-FITTING, WELDED WIRE OFFSET PANELS SECURED TO THE VERTICAL FACES OF THE BASKETS IN IN ORDER TO REDUCE THE EFFECTIVE BASKET MESH SIZE TO 1.5"x1.5".
2. THE LOWERMOST GABIONS AND MATTRESSES SHALL BE PLACED ON 2 TO 3 INCHES OF 3
4-INCH CRUSHED WASHED ROCK. THE WASHED ROCK WILL ACT AS LEVELING COURSE
AND ALLOW FOR FOUNDATION PREPARATION BELOW THE WATER SURFACE (AS REQUIRED). COMPACT LEVELING ROCK (LOCATED ABOVE THE WATER SURFACE) WITH A VIBRATORY COMPACTOR OVER THE FULL WIDTH OF THE FOUNDATIONS UNTIL VISIBLE DEFORMATIONS CEASES. DEWATERING IS NOT REQUIRED, HOWEVER, THE CONTRACTOR SHALL EXERCISE CARE DURING PLACEMENT IN THE WET IN ORDER TO MINIMIZE TURBIDITY. THE SUPPLY AND INSTALLATION OF LEVELING ROCK IS INCIDENTAL
TO BID ITEMS 25302, 25309 & 25100.
3. GABION/MATTRESS ROCK MAY BE PLACED MECHANICALLY PROVIDED CARE IS TAKEN TO ENSURE THAT IT IS TIGHTLY PACKED WITH A MINIMUM OF VOIDS. FOR EXPOSED FACES, HAND LABOR SHALL BE USED TO PREVENT BULGING AND PRODUCE ATTRACTIVE VERTICAL FACES. EXCAVATION & PLACEMENT IN THE WET IS ACCEPTABLE.
4. BACKFILL BEHIND GABIONS CONCURRENTLY WITH THE CELL FILLING OPERATION. BACKFILL THE AREA BEHIND GABIONS WITH SUITABLE GRANULAR MATERIAL SALVAGED FROM STRUCTURE EXCAVATION WORK. COMPACT BACKFILL MATERIAL AT AN OPTIMUM MOISTURE CONTENT WITH A VIBRATORY COMPACTOR. OPERATE COMPACTION EQUIPMENT OVER THE FULL WIDTH OF THE IN-FILL AREA UNTIL VISIBLE DEFORMATION OF THE BACKFILL CEASES.
5. BARGE BUMPERS SHALL BE LOADING DOCK -TYPE WITH LAMINATED, FABRIC-IMPREGNATED RUBBER PADS SANDWICHED BETWEEN POWDER COATED OR GALVANIZED STEEL MOUNTS. ALL MOUNTING HARDWARE SHALL BE STAINLESS OR GALVANIZED STEEL. MOORING POSTS SHALL CONSIST OF 3-INCH DIAMETER BY 4 FEET TALL, HOT-DIPPED GALVANIZED STEEL (SHC. 40 MIN). EMBED/BACKFILL MOORING POSTS BEHIND SECOND ROW GABION FACE MESH. ALL MATERIALS, LABOR AND EQUIPMENT TO INSTALL/SECURE BUMPERS TO THE RIVER FACE OF THE GABIONS AND TO EMBED MOORING POSTS (AS SHOWN) IS INCIDENTAL TO BID ITEM 67513.
6. BURY MEDIANS SUCH THAT THE VERTICAL STEMS PROTRUDE FROM THE SURROUNDING TOPOGRAPHY BY ROUGHLY 2 INCHES. THE CONTRACTOR SHALL SUPPLY AND INSTALL ONE 12"-LONG GALVANIZED TIE-UP CLEAT IN THE CENTER OF EACH MEDIAN BARRIER. AFFIX CLEATS TO MEDIAN TOP SURFACES VIA THREADED RODS (ASTM A325) WHICH ARE SECURELY BONDED IN THE MEDIAN CONCRETE BY HIGH-STRENGTH EPOXY. ALL WORK TO EXCAVATE, BURY & BACKFILL PRECAST CONCRETE MEDIAN BARRIERS AND TO
ATTACH CLEATS (FOR BARGE ANCHORAGE) IS INCIDENTAL TO BID ITEM 553A04.
7. FOLLOWING COMPLETION OF BARGE MOORING STRUCTURE, THE CONTRACTOR SHALL SUPPLY AND VIBRATORY COMPACT A 3-INCH THICKNESS OF CRUSHED AGGREGATE SURFACING OVER THE REVET MATTRESSES (AS SHOWN HEREIN). DO NOT DRIVE/TRACK EQUIPMENT ON MATTRESS SURFACES UNTIL SURFACING COURSE IS APPLIED.
B B
FINISH GRADE/IMPROVEMENT ELEVATION
EXISTING GROUND (RIVER BTM) ELEVATION
CONSTRUCTION BASELINE STATIONING
RIGHT OFFSET FROM BASELINE
ASTERISK INDICATES MATCH EXISTING ELEVATION
(CONTRACTOR TO FIELD VERIFY)
FINISH GRADE/IMPROVEMENT ELEVATION
CONSTRUCTION BASELINE STATIONING
LEFT OFFSET FROM BASELINE
OPTION 1 BID ITEMS
ITEM NO. DESCRIPTION METHOD OF
MEASUREMENT UNIT QUANTITY
15101-B GENERAL MOBILIZATION LSQ LS 1
15713-B SOIL EROSION AND POLLUTION CONTROL LSQ LS 1
20201-B CLEARING AND GRUBBING LSQ LS 1
20806-B STRUCTURE EXCAVATION LSQ LS 1
30809-B CRUSHED AGGREGATE, COMPACTION METHOD 1 (COMMERCIAL SOURCE) CQ CY 1
55204-B STRUCTURAL CONCRETE FOR BULKHEADS, CLASS C(AE) CQ CY 7
62301-B GENERAL LABOR AQ HR 4
63301-B SIGN SYSTEM AQ EA 1
64501-B PREFABRICATED ALUMINUM GANGWAY, STANDARD - 4-FOOT WIDTH AQ EA 1
64604-B FLOATABLE DOCK SYSTEM - COMBINATION DECKING AND FLOATATION CQ SF 905
64701-B PREFABRICATED STIFFARM AND CONNECTIONS AQ EA 2
65203-B CROSS CABLE, TURNBUCKLES & HARDWARE, STAINLESS STEEL AQ EA 2
OPTION 2 BID ITEM
ITEM NO. DESCRIPTION METHOD OF
MEASUREMENT UNIT QUANTITY
20304-B DEMOLISH, REMOVE & DISPOSE OF EXIST. COULTER DOCKS (8 SLIPS) LSQ LS 1
MERIWETHER-COULTER BOAT DOCK
RECONSTRUCTION
COULTER SITE PLAN & ESTIMATED QUANTITIES
HELENA NATIONAL FOREST
1-13296 DECEMBER 2014 SHEET NO.
7 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
POINT NORTHING EASTING ELEVATION DESCRIPTION
CP-1 5000.00 10000.00 1000.00 REBAR W/ CAP
CP-2 5098.75 9932.64 991.81 REBAR W/ CAP
CP-3 4942.48 9980.35 998.23 REBAR W/ CAP
CP-4 5108.10 10078.66 1003.69 REBAR W/ CAP
*INFORMATION ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE
1. SURFACE CONTOURS DEPICT THE EXISTING TOPOGRAPHY AND RIVER BOTTOM.
2. THE CONTRACTOR'S WORK PLAN WILL DETAIL EQUIPMENT AND MATERIAL STAGING
WITH SPECIAL EMPHASIS PLACED ON MINIMIZING CONSTRUCTION DISTURBANCES,
WHERE FEASIBLE.
3. CLEARING AND GRUBBING (INCLUDING SHRUB & TREE REMOVAL) SHALL BE PAID
ACCORDING TO BID ITEM NO. 20201.
4. CONTRACTOR SHALL PRESERVE AND PROTECT ALL TREES (OR OTHER VEGETATION)
NOT INDICATED FOR CLEARING/REMOVAL.
5. THE CONTRACTOR WILL IMPLEMENT PRUDENT EROSION CONTROL MEASURES PRIOR
TO THE START OF CONSTRUCTION ACTIVITIES.
6. FOLLOWING COMPLETION OF SITE WORK, REMOVE ALL DEBRIS AND EQUIPMENT AND
BROADCAST SEED CONSTRUCTION DISTURBANCES. REFER TO THE FSSS.
INCIDENTAL TO BID ITEM 62503.
7. THE EXISTING SURVEY CONTROL WILL SERVE AS THE CONSTRUCTION BASELINE AND
ELEVATION DATUM FOR THE PROJECT IMPROVEMENTS. THE CONTRACTOR SHALL
IMPLEMENT MEASURES TO PROTECT THE EXISTING CONTROL POINTS SUCH THAT
THEY ARE NOT DAMAGED, OR OTHERWISE RENDERED UNUSABLE. ANY DAMAGES TO
(OR LOSS OF) SITE CONTROL AS A RESULT OF THE CONTRACTOR'S NEGLIGENCE
WILL BE THE RESPONSIBILITY OF CONTRACTOR. PROTECTION AND PROPER USE OF
CONTROL POINTS IS INCIDENTAL TO THE PROJECT.
COULTER DOCK LAYOUT
HELENA NATIONAL FOREST
1-13296 DECEMBER 2014 SHEET NO.
8 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
1. SIGN POST SHALL FOR HANDICAP DOCKING SLIP SHALL CONSIST OF 2 OR 2 1
2 -INCH DIAMETER HOT-DIPPED
GALVANIZED STEEL (SHC. 40 MIN). INSTALL PLACARD BOTTOM 60 INCHES (+/- 1-INCH) ABOVE DECK SURFACE.
SECURELY AFFIX TO POST TO DOCK UTILIZING TAMPER RESISTANT HARDWARE, WHICH DOES NOT COMPROMISE FLOATATION/INTEGRITY (INCIDENTAL TO 66301). REFER TO DETAIL 4 ON SHEET 9 FOR SIGN
PLACARD LETTERING LAYOUT AND DIMENSIONING INFORMATION.
2. CONTRACTOR SHALL BACKFILL AND GRADE DISTURBED EARTHWORK SURFACES ADJACENT TO NEW BULKHEADS TO ELIMINATE TRIPPING HAZARDS AND TO BLEND THE IMPROVEMENTS TO TIE INTO AND APPROXIMATE THE EXISTING TOPOGRAPHY. FINISHED CUT SLOPES SHALL BE 3H:1V OR LESS STEEP. FILL SLOPES SHALL BE CONSTRUCTED EVENLY AND WITHOUT UNDRAINED DEPRESSIONS. FILL SLOPES MUST BE CONSTRUCTED AT 5H:1V OR LESS STEEP. BACKFILL PLACEMENT SHALL BE PERFORMED IN UNIFORM LIFTS UTILIZING SUITABLE EXCESS EXCAVATED SOILS. COMPACT BACKFILL MATERIALS TO AN UNYIELDING
CONDITION. ALL FINISH GRADE WORK IS INCIDENTAL TO BID ITEM NO. 55204.
3. STIFFARMS SHALL BE AFFIXED TO DOCK MODULES VIA HEAVY-DUTY, 4-POCKET STIFFARM BRACKETS. FOR THE PURPOSES OF THIS PROJECT, ONE COUPLER POCKET CONNECTION SHALL CONSIST OF SECURE FIXMENT OF THE UPPER & LOWER DOCK POCKETS UTILIZING RUBBERIZED, TAPERED POCKET-SHAPED
CONNECTORS.
4. STIFFARM CROSS-LINKAGES SHALL CONSIST OF WIRE ROPE CABLES WITH INTEGRAL TURNBUCKLES.
TURNBUCKLES SHALL BE POSITIONED ADJACENT TO THE CONCRETE BULKHEADS TO ALLOW FOR
ADJUSTMENT FROM THE SHORELINE. AT FINAL INSTALLATION, CROSS-LINKAGE CABLES AND STAY CABLES SHALL BE POST-TENSIONED BY THE CONTRACTOR. POST TENSION CABLES TO LOAD(S) APPROPRIATE FOR THE DOCK STRUCTURE AND INTENDED APPLICATION (BUT NO MORE THAN 200 POUNDS). TURNBUCKLES SHALL HAVE BETWEEN 3" AND 4" OF TENSILE ADJUSTMENT REMAINING AFTER FINAL INSTALL. THE DOCK SUPPLIER SHALL DESIGN THE SYSTEM & BULKHEAD CONNECTIONS ACCORDING TO THE GENERALIZED REQUIREMENTS OUTLINED HEREIN AND ON SHEET 9. THE INDIVIDUAL STIFFARMS SHALL BE DESIGNED TO INTENTIONALLY FAIL VIA A SHEARING PIN (OR OTHER REPLACEABLE/SACRIFICIAL PART) IN THE EVENT THAT TENSILE FORCES IN THAT MEMBER SHOULD EXCEED THE DESIGNATED LOAD. THE CROSS-LINKAGES WILL BE INTEGRAL TO STIFFARM AND DOCK STABILITY DURING NORMAL OPERATION. HOWEVER, IN THE EVENT THAT THE DESIGNATED TENSILE FORCE IS EXCEEDED IN THE MAIN STIFFARM MEMBER, THE CROSS-LINKAGE ATTACHMENTS/LOCATIONS SHOULD BE DESIGNED IN SUCH A WAY THAT THE CABLES DO NOT PREVENT THE DESIGNED TENSILE FAILURE MODE OR ABSORB THE TENSILE LOADING IMMEDIATELY FOLLOWING STIFFARM MEMBER FAILURE. THE INTENT OF THIS STIPULATION IS TO LIMIT THE POTENTIAL FOR BULKHEAD PULL-OUT IN
THE UNLIKELY EVENT OF A DIRECT BOAT IMPACT TO THE DOCK SYSTEM.
5. FOLLOWING INSTALLATION OF DOCK, ANCHORAGE COMPONENTS, CONNECTIONS, AND ALL ACCESSORIES, THE CONTRACTOR SHALL SUPPLY AND INSTALL NEAT FITTING POCKET FILLERS IN ALL EMPTY TOP POCKETS.
6. INSTALL 8-INCH LONG (BLACK) NYLON TIE-UP CLEATS AT 6.5 FEET O.C. (OR CLOSER). CONNECT CLEATS VIA T-TYPE NUTS THAT ARE MOLDED INTO THE DOCK MODULES/SECTIONS. BEGINNING AT THE RIVERSIDE ENDS OF THE DOCK FINGERS INSTALL A MINIMUM OF 3 CLEATS (PER SIDE) FOR EACH FINGER. INSTALL ONE CLEAT ALONG THE BOW FACE OF THE MAIN/HEADER DOCK TO BE LOCATED MIDWIDTH OF EACH DOUBLE SLIP AND
NEAR THE HEADER DOCK END FOR SINGLE SLIPS.
7. PRIOR TO COMPLETION OF THE DOCK SYSTEM INSTALLATION, THE CONTRACTOR SHALL STAMP, ENGRAVE, OR OTHERWISE PERMANENTLY MARK (WITHOUT COMPROMISING STRUCTURAL INTEGRITY AND FLOTATION) EACH STIFFARM, GANGWAY, DOCK MODULE/SECTION, CROSS-LINKAGE, OR OTHER COMPONENT RELATIVE TO ADJACENT CONNECTION/ATTACHMENT POINTS. FLOTATION MODULES SHOULD BE MARKED ON THE VERTICAL SURFACES OF BUTT JOINTS SUCH THAT MARKS CANNOT BE SEEN WHEN THE SYSTEM IS FULLY ASSEMBLED. THE PURPOSE OF THESE IDENTIFYING MARKS IS TO ALLOW FOR EASE OF REASSEMBLY BY FOREST PERSONNEL FOR DOCK SYSTEMS THAT MAY BE TAKEN APART ON A SEASONAL BASIS. PLACE
IDENTIFIER MARKS IN THE LEAST CONSPICUOUS LOCATIONS POSSIBLE.
8. COMPONENT MARKING, TIE UP CLEATS, POCKET FILLERS, MODULE COUPLERS, BUMPERS, SAY CABLES, AND
ALL CONNECTIONS, HARDWARE, & APPURTENANCES ARE INCIDENTAL TO BID ITEM NO. 64604.
9. GANGWAY FRAMES & RAILINGS SHALL BE CONSTRUCTED OF EXTRUDED AND/OR ROLLED ALUMINUM SHAPES.
EACH GANGWAY SHALL WEIGH LESS THAN 340 LBS (INCLUDING DECKING AND RAILING). MAXIMUM GANGWAY THICKNESS FROM TOP OF DECKING TO BOTTOM OF STRUCTURAL SUPPORTS SHALL BE 6 INCHES.
10. ͛ DENOTES THAT DOCK SYSTEM/COMPONENT DESIGN IS TO BE PERFORMED BY DOCK SUPPLIER .
FINISH GRADE/IMPROVEMENT ELEVATION
EXISTING GROUND (RIVER BTM) ELEVATION
CONSTRUCTION BASELINE STATIONING
RIGHT OFFSET FROM BASELINE
ASTERISK INDICATES MATCH EXISTING ELEVATION
(CONTRACTOR TO FIELD VERIFY)
FINISH GRADE/IMPROVEMENT ELEVATION
CONSTRUCTION BASELINE STATIONING
LEFT OFFSET FROM BASELINE
POINT NORTHING EASTING ELEVATION STATION
CP-2 5098.75 9932.64 -- 0+00.00
CP-3 4942.48 9980.35 998.23 1+63.39
BULKHEAD & SIGNAGE DETAILS
LEWIS & CLARK COUNTY, MONTANA
1-13296 DECEMBER 2014 SHEET NO.
9 OF 9CSP
CSP
KFY
WBL
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
R
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
1 OPT. BID ITEMS BREAKOUT CP 6.12.15
File details come from the government source that posted it. Updated .