SOLICITATION_AG-0261-S-17-0001_PORCUPINE_WATER_SYSTEM_PROJECT_2017.pdf
PDF 3 MB Posted
- Solicitation number
- AG-0261-S-17-0001
About this file
SOLICITATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_6.pdf | ||
| AMENDMENT_5.pdf | ||
| AMENDMENT_4.pdf | ||
| AMENDMENT_3.pdf | ||
| AMENDMENT_2.pdf | ||
| AMENDMENT_1_PORCUPINE_WATER_SYSTEM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
814699
SW IDAHO-NEVADA ACQUISITION CENTER
ATTN KAREN MORTHLAND
1249 S VINNELL WAY STE 200
BOISE ID 83709-1663
KAREN MORTHLAND 208-373-4115
1x 07/17/2017
AG-0261-S-17-0001
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
IGF::CL::IGF PORCUPINE WATER SYSTEM PROJECT 2017
NOTE: THERE WILL BE A SECOND PREBID SITE VISIT FOR THIS PROJECT:
JULY 20, 2017
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
08/18/2017
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
SW IDAHO-NEVADA ACQUISITION CENTER
ATTN KAREN MORTHLAND
1249 S VINNELL WAY STE 200
BOISE ID 83709-1663
KAREN MORTHLAND
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-0261-S-17-0001
IGF::CL::IGF PORCUPINE WATER SYSTEM PROJECT 2017
Delivery: 11/30/2017
Delivery Location Code: 0267
SAWTOOTH NATIONAL FOREST
2647 KIMBERLY ROAD EAST
TWIN FALLS ID 83301 US
FOB: Destination
Period of Performance: 08/28/2017 to 11/30/2017
IGF::CL::IGF
001 IGF::CL::IGF PORCUPINE WATER SYSTEM PROJECT 2017
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice
Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury.
All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.
Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.The "Submit
Invoice-to" address for USDA orders is the
Department of Treasury's Invoice Processing
Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic
Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of
Treasury and you can find more information at this website https://www.ipp.gov/index.htm.
Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AG-0261-S-17-0001 Porcupine Water System Improvement Project 2017 Page 1 of 61
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
PORCUPINE SPRINGS WATER SYSTEM IMPROVEMENTS 2017
MINIDOKA RANGER DISTRICT
ITEM
NO. DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY
UNIT
PRICE
TOTAL
AMOUNT
Base Bid
010250 Construction Staking LSQ LS
Lump Sum $XXXXX $
011900
Mobilization LSQ LS
133400
Utility Building LSQ LS
221100-1
Water Pipeline, 2” HDPE, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding
DQ LF 170 $ $
221100-2 Water Pipeline, 6” HDPE, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding
DQ LF 390 $ $
221100-3 Pumpout Drain AQ EA 1 $ $
221100-4 Modifications to Existing Water Storage Tank LSQ LS Lump Sum $XXXXX $
221102 2” Metal Curb Valve and Box AQ EA 5 $ $
221105 Hydrant, Type A with Aggregate Pad AQ EA 1 $ $
260500 Electrical System LSQ LS Lump Sum $XXXXX $
311000 Clearing and Grubbing LSQ LS Lump Sum $XXXXX $
322205 Barrier Rocks – Relocated on Site AQ EA 6 $ $
329206 Spreading of Government Furnished Seed LSQ LS Lump Sum $XXXXX $
TOTAL BASE
$ XXXXX $
Option Items: The Government reserves the right to award any and all option items until September 30, 2017. There will be an extension in contract time of 30 days with the award of option item #2. There will not be an extension if option item #1 is awarded.
AG-0261-S-17-0001 Porcupine Water System Improvement Project 2017 Page 2 of 61
Option 1: Abandon Existing Well
332100-12 Abandonment of Existing Well
LSQ
LS
Lump Sum
$XXXXX
Option 2: Drill New Well and Install Pump
221120
Submersible Well Pump
$XXXXX
332100-1
Water Supply Wells: Moving Equipment to and From Well Site
$XXXXX $
332100-2
Water Supply Wells: Drilling, Borehole (Sized to Receive a 6-Inch Well Casing and Bentonite Grout Seal)
AQ
LF
332100-3 Water Supply Well: Drilling, Oversized Borehole (Sized to Receive a 6-Inch Well Casing and Bentonite Grout Seal)
AQ LF 60 $ $
332100-4 Water Supply Wells:6-Inch Steel Casing AQ LF 113 $ $
332100-5 Water Supply Wells: Neat Cement Grout Seal AQ 94# Bag 23 $ $
332100-6 Water Supply Wells: Pre-Packed Well Screen DQ LF 10 $ $
332100-7 Water Supply Wells: Developing Well DQ HR 5 $ $
332100-8 Water Supply Wells: Testing Well-First 6 Hours DQ HR 6 $ $
332100-9 Water Supply Wells: Testing Well – Additional Hours if Drawdown Does Not Stabilize
DQ HR 18 $ $
332100-10 Water Supply Wells: Well Accessories LSQ LS Lump Sum $XXXXX $
332100-11 Water Supply Wells: 4-Inch PVC Casing AQ LF 112 $ $
TOTAL OPTIONS $ XXXXX $
TOTAL BASE PLUS OPTIONS $ XXXXX $
If the new well option is awarded at the time of the base award. The new well shall be completed first prior to completing the base options. If the well happens to be dry the government will terminate for convenience the remaining items.
* Designated Method of Measurement: LSQ - Lump Sum Quantities AQ – Actual Quantity DQ – Design Quantity
B.2 Payment for Bond Premiums
Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
The Government reserves the right to exercise optional bid items either at the time of award, or during the life of the contract. The Government may determine to award one or more items at various times thorughout the contract and option items selected for award may not necessarily be in numerical order (i.e., government may elect to exercise option H over option A).
E-Mail Address: _______________________Phone Number: _________________DUNS: ________________________________
B.3 Basis For Payment
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 3 of 61
All items shown or noted on the drawings, which are not specifically bid items, are considered incidental items. The cost of furnishing and installing all incidental items will not be paid for separately, but shall be included in the unit price bid for other items unless noted otherwise.
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 4 of 61
PART I - THE SCHEDULE
SECTION C - DESCRIPTION/SPECIFICATIONS
C.1 Project Description
This project includes conversion of the water system from a spring source to a well source. The Project Includes:
1. Installing a new utility building with plumbing appurtenances and solar-powered electrical system.
2. Installing new buried waterline.
3. Installing a new water hydrant.
4. Installing a remote telemetry system for communication between the pump controls and the tank level floats.
5. Disconnecting the existing spring source from the water system (at the existing tank).
6. All work to decommission the existing spring source and pump system will be completed by others (not in contract).
7. Optional Bid Item #1: Abandon the existing well.
8. Optional Bid Item #2: Drill new well and install pump.
C.2 Project Location
The project is located on the Minidoka Ranger District of the Sawtooth National Forest, and is located in Cassia County, Idaho, approximately 26 miles south and 9 miles east of Twin Falls, approximately 35 miles by road from Twin Falls (past the Magic Mountain ski resort) at an elevation of approximately 7020 feet. It is located in the SW1/4 of Section 30, T14S, R19E (Latitude 42°10'19"N, Longitude 114°16'39"W).
C.3 Government Cost Estimate, per FAR 36.204, is between $150,000 and $500,000.
C.4 Biobased
The contractor must comply with Section9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide bio based products
The Contractor shall utilize products and material made from bio based materials (e.g., bio based greases, bio based hydraulic fluids, bio based absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards.
All supplies and materials to be used in the performance of work described herein are subject to the approval of the
Contracting Officer Representative (COR). The following is an example list of products that may be used in this contract for Construction for which bio based products are available. The list is not all inclusive.
It is desirable that vendors be able to supply the greatest number of bio based products listed meeting the health and environmental specifications.
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 5 of 61
Anti-Slip Agents Erosion Control Parts Wash Solution Automotive Care Products Fluids Penetrating Lubricants Chain and Cable Lubricants Forming Lubricants Personal Protection Concrete and Asphalt Cleaners Gasoline Fuel Additives Pneumatic Equipment Lubricants Concrete and Asphalt Release Gear Lubricants Turbine Drip Oils
Concrete Curing Agents Greases Wood and Concrete Sealers Concrete Repair Materials Hydraulic Fluids 2-Cycle Engine Oils
Corrosion Preventatives Lubricant Components Engine Crankcase Oil Other Lubricants
Bio based products that are designated for preferred procurement under USDA’s Bio Preferred program must meet the required minimum bio based content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their bio based products such as bio based content. In addition to the bio based products designated by the U.S. Department of Agriculture in the Bio Preferred Program, the Contractor is encouraged to use other bio based products.
The Contractor shall comply with the provisions at FAR 52.223-1, Bio based Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Bio based Products under Service and Construction Contracts.
C.5 Project Specifications
Project specifications include:
ITEM NO. DESCRIPTION
Section 010250 - Construction Staking Section 011250 - Measurement And Payment Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 023701 - Sediment And Erosion Control Measures Section 024100 - Waste Material Disposal Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 133400 - Precast Concrete Utility Building Section 221100 - Water Distribution Systems Section 221102 - Curb Valves And Boxes Section 221103 - Plumbing Appurtenances Section 221105 - Water Hydrants Section 221120 - Submersible Well Pumps Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceways And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 269999 - Other Electrical Tests And Calibrations http://www.biopreferred.gov/ http://www.biopreferred.gov/
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 6 of 61
Section 277999 - Wireless Radio Transmission Section 311000 - Clearing And Grubbing Section 312000 - Earthwork Section 321204 - Crushed Aggregate Base Or Surface Course Section 322205 - Barrier Rocks Section 329206 - Seeding Section 332100 - Water Supply Wells
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 7 of 61
SECTION E - INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - https://www.acquisition.gov/far and the Agriculture Acquisition Regulations – www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements. (Apr 1984) 52.246-12 Inspection of Construction (AUG 1996)
E.2 Inspection and Acceptance
Periodic field inspection will be made by the Contracting Officer’s Representative (COR) or the COR’s designated inspector. Work not completed to Contract specifications shall be reworked without additional compensation to the Contractor.
https://www.acquisition.gov/far https://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 8 of 61
SECTION F - DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - https://www.acquisition.gov/far and the Agriculture Acquisition Regulations – www.usda.gov/procurement/policy/agar.html.
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984)
The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work with 90 days. If Option 2 is awarded an additional 30 days will be added to the contract time. The time stated for completion shall include final cleanup on the premises. Time will be suspended for winter shutdown when conditions no longer allow work at the site.
ESTIMATED START DATE CONTRACT TIME
August 28, 2017 90 Calendar Days
F. 3 AGAR 452.236-75 Maximum Workweek--Construction Schedule (Nov 1996)
Within 3 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is between the hours between 7:00 a.m. and 7:00 p.m. Monday through Friday.
https://www.acquisition.gov/far https://www.acquisition.gov/far
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 9 of 61
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 Government-Furnished Materials
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract. SEED
G.2 Submission Of Invoices Invoice Processing Platform (IPP)
The Contractor shall utilize the Invoice Processing Platform (IPP) for the electronic submission and tracking of purchase orders, invoices, and payment information. IPP is a secure Government-wide, Webbased invoice processing service offered free of charge to Government Agencies and their suppliers.
A one-time enrollment in IPP will generate a series of emails that will be sent to the point of contact established in your SAM.gov account. The first email will be from “IPP User Administration” and will contain the IPP login ID and link to the IPP Website. A second email from “Treasure UPS User Administration” containing the password will be sent within 24 hours. Once both emails are received, the Contractor will login to the IPP application and complete the registration process. After login, you will be able to access IPP training information.
IPP System benefits include the ability to create invoices directly from a contract award and submit them electronically, as well as:
Email notification when invoice(s) are paid Online payment history Email notification when you are awarded a new contract
The email notification of payment is sent when a payment is distributed to your bank account and will include all pertinent payment information. For additional information, please visit the www.ipp.gov website to learn more. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding Federal holidays) from 8 a.m. to 6 p.m. ET, to answer questions related to accessing IPP or completing the registration process. Their toll-free number is 1-866-973.3131 or they can be reached at IPPCustomerSupport@fms.treas.gov.
G.3 Measurement
Units of measurement shall be as indicated in the Schedules of Items.
http://www.ipp.gov/ http://www.ipp.gov/
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 10 of 61
PART I - THE SCHEDULES
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations
- https://www.acquisition.gov/far and the Agriculture Acquisition Regulations –
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-72 Use of Premises (NOV 1996)
H.2 Site Information And Limitations
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. The contractor shall coordinate inspection of the equipment by the Forest Service prior to off-loading from the trailer.
H.3 Temporary Access
Parking: Use designated areas for construction personnel or as approved by the Contracting Officer for parking.
H.4 Waste Management And Disposal
Processing waste material for salvage and recycling is encouraged.
The Contractor shall provide and maintain appropriate waste disposal containers or bins at the project site for the duration of the project construction. Verify with Contracting Office for placement of disposal containers and bins on the project site.
Waste material and debris shall be picked up and deposited in the waste disposal bins on a daily basis.
Containers must be emptied on a weekly basis unless more frequent emptying is needed.
Burning or burying of construction waste material on site will not be permitted. Material shall be disposed of in accordance with the Waste Material Disposal specification.
H.5 Field Offices, Work Camps, Staging And Storage Areas https://www.acquisition.gov/far https://www.acquisition.gov/far
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 11 of 61
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work) on site. Overnight camping and housing on site will not be allowed.
H.6 Inspection Of Worksite
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
H.7 Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 12 of 61
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powdertype of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 13 of 61
(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
(i) All high fire risk operations could be terminated at 1300 local time.
(ii) All burning could be stopped, including debris burning fires.
(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
(12) Pump and Trailer.
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 14 of 61
(13) Burning. Before starting any open burning, the Contractor shall comply with the following:
(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
(ii) Obtain a burning permit from the District Ranger.
(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
H.8 AGAR 452.236-77 Emergency Response (NOV 1996)
(a) Contractor’s Responsibility for Fire Fighting.
(1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.
(2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting
Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes Clause, FAR 52.243-4.
H.9 Loss, Damage, Or Destruction
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 15 of 61
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
H.10 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H.11 Conformity With Drawings And Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H.12 Samples, Tests, Cited Specifications
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H.13 Barricades, Warning Signs, And Other Devices
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
H.14 Landscape Preservation
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 16 of 61
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumen’s, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H.15 Prework Conference
Prior to commencement of work, the Contracting Officer will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.
H.16 State Of Idaho’s Notice To Offeror
(a) Prior to award of any contract subject to Idaho Workers' Compensation Laws, the contractor must provide (1) evidence that they have the required workers' compensation coverage or, (2) documentation from the State of Idaho exempting the contractor from such coverage. See Section J.4 for Workers’ Compensation Form. This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
(b) Contractors should obtain and complete a State of Idaho Certificate of Verification of Workers' Compensation Insurance as documentation of insurance coverage or exemption. These certificates may be obtained from and returned to the Employee Compliance Division of the Idaho Industrial Commission at the following offices:
North Idaho Southwest Idaho 1221 Ironwood Street, Suite 100 317 Main Street Coeur d'Alene, ID 83814 P.O. Box 83720
(208) 769-1565 Boise, ID 83720-0041 Fax No. (208) 769-1465 (208) 334-6032
(800) 950-2110 Fax No. (208) 334-5145 Southeast Idaho
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 17 of 61
1070 Hiline, Suite 300 Pocatello, ID 83201
(208) 236-6366 Fax No. (208) 236-6040
(c) This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 18 of 61
PART II - CONTRACT CLAUSES SECTION I - CONTRACT CLAUSES
I.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations
- https://www.acquisition.gov/far and the Agriculture Acquisition Regulations –
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEPT 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights (APR 2014) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (JUL 2016) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (NOV 2016) 52.219-14 Limitations on Subcontracting (JAN 2017) 15% 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-4 Contract Work Hours and Safety Standards Act--Overtime Compensation (MAY 2014) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) https://www.acquisition.gov/far https://www.acquisition.gov/far
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 19 of 61
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Affirmative Action for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports Veterans (FEB 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-2 Affirmative Procurement of Biobased Products Under Service And Construction Contracts
(SEP 2013)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
(MAY 2008)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance--Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds--Construction (OCT 2010) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer—System for Award Management (JUL 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.233-1 Disputes (MAY 2014) Alternate I (DEC 1991) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-1 Performance of Work by the Contractor (APR 1984) – 20% 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 20 of 61
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JULY 1995) 52.243-4 Changes (JUNE 2007) 52.244-6 Subcontracts for Commercial Items (JAN 2017) 52.245-1 Government Property (JAN 2017) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering--Construction (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (APR
2012) 52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of
Improvements) (APR 2012) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-70 Additive or Deductive Items (FEB 1988) 452-236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452-236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988)
I.2 FAR 52.219-28 Post-Award Small Business Program Representation (JUL 2013)
(a) Definitions. As used in this clause—
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c)
AG-0261-S-17-0001 Porcupine Springs Water Improvement Project 2017 Page 21 of 61 of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the
Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120…