Trad_Single_InstallManual.pdf

PDF 234 KB Posted

Attached to
Suntaheen Creek Trailhead Vault Toilet
Solicitation number
AG-0120-S-14-0047
Issued by

About this file

AG-0120-S-14-0047 Installation Manual

View the file

Other files

File Type Posted
AG0120S140047_A001_SF1442ReplmtPgs.pdf PDF
AG0120S140047_A001_SecI_ReplmtPgs.pdf PDF
AG0120S140047_A001_SF30.pdf PDF
Suntaheen_dwgs_030214.pdf PDF
SuntaheenAreaPhotoC.JPG JPG image
SuntaheenAreaPhotoA.JPG JPG image
Suntaheen_specs_final.pdf PDF
SuntaheenAreaPhotoB.JPG JPG image
AG0120S140047_VaultToilet_Install_fnl.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SST® TRADITIONAL SINGLE RESTROOM WITH EXTENDED FLOOR PLAN TSE1199

INSTALLATION MANUAL

18240 North Bank Road Roseburg, OR 97470

541-496-3541 Fax: 541-496-0803

E-mail: romtec@rosenet.net Internet: www.romtec-inc.com

SST® Traditional Single Restroom with Extended Floor Plan

TSE1199

SST® TRADITIONAL SINGLE RESTROOM WITH EXTENDED FLOOR PLAN TSE1199ROMTEC SST® TRADITIONAL SINGLE

RESTROOM WITH EXTENDED FLOOR PLAN

Introduction This manual describes installation of the Romtec SST® Traditional

Single Restroom with Standard Floor Plan, including models with natural cedar exterior and Sandstone stucco exterior. Also included are installation instructions for the optional All-Weather Porch for these restroom models.

The manual includes information that will help you determine the suitability of this restroom for a particular site, including:

• Complete specifications

• List of supplied materials and materials you supply

• Cautions about installation of the underground vault, soil conditions and drainage at your site, ventilation and site selection

• Installation procedures

• Cleaning and maintenance procedures

Installation Video Available In addition to the information in this manual, the installation video cassette for this restroom shows a complete installation from start to finish.

IMPORTANT! : Since installation details may have changed somewhat since the video was produced, always refer to the manual for all dimensions and installation procedures.

Accessories Available From Romtec Romtec supplies a complete line of optional restroom accessories:

• Urinal - white polyethylene urinal can be fastened to interior wall with stainless fasteners (not supplied); drains into vault.

• Toilet Paper Dispensers - available in 2 and 3-roll sizes with free-rolling or restricted center bar. Choice of stainless steel or white.

• Toilet Riser Safety Bars - stainless steel bars fit in bottom of toilet riser to prevent objects larger than 6" from passing through.

• Graffiti Repair Kit - cleans and repairs most damage to wood and polyethylene surfaces.

• Toilet Cleaning Brush - heavy-duty brush with extra long handle for cleaning restrooms.

TABLE OF CONTENTS

CHAPTER PAGE

Specifications 1 Vault Cautions, Soil & Drainage Planning 2 Steps 1 & 2: Site Selection & Excavation 4 Step 3: Handling & Parts Inventory 6 Step 4: Vault Installation 8 Step 5: Backfill & Compaction 10 Step 6: Floor Pan Placement 11 Step 7: Building Placement 12 Step 8: Roof & Vent Pipe Installation 13

CHAPTER PAGE

Step 9: Concrete Forming 14

Step 10: Posts & Footings, Steel Rebar 15 Step 11: Wall Vent Installation 17 Step 12: Concrete Work 18 Step 13: Trim Installation 19 Step 14: Clean-up & Maintenance 20 Optional: All-Weather Porch Installation 21

SPECIFICATIONS

SST® Traditional Single Restroom with Ext ended Floor Plan Vault Patented Design U.S. Patent No. 4231482 - Concrete filled center pier column structural to slab and building.

Volume 750 gal. (approximately 11,000 uses) Dimensions 84" x 64" x 48-54" (bottom has 1"/ft slope) Weight 300 lbs.

Wall Thickness 3/8" min.

Material Cross-linked Polyethylene (Black)

ASTM Test Nom. Value Density D1505-85 0.944 g/cm3

Tensile Strength at Yield D638-84 3,000 psi Elongation at Break D638-84 400% Tensile Modulus of Elasticity D638-84 80,000 psi Flexural Modulus D790-84A 100,000 psi

Cleanout 24" O.D. x 61/2" high, Cover: 2 lbs., Cross-Linked Polyethylene Toilet Riser Stack 205/8" x 161/2" O.D. oval x 6" high (fits Romtec toilet risers) Vent Pipe Stack 12" O.D. x 10" high (fits standard 12" schedule 40 ABS pipe) Footing Form supplied for 36"x36"x12" deep steel-reinforced concrete footing under center of vault.

Steel Support Post 48" x 2" Sch. 40 steel post capped at both ends with 3" x 31/4" welded steel plates.

Post fits inside center pier column of vault to connect footing below vault with slab.

Building Material Cross-linked Polyethylene (Brown or Optional Desert Sand) Material spec. is same as vault.

Wall Thickness 1/4" min.

Floor Plan Dimensions Interior: 74" wide (widest point) x 89" long; Exterior: 77" wide x 112" long Floor Pan Cross-linked Polyethylene Concrete Floor Form (1/4" per foot slope toward door) Exterior Finish 1/2" Ext. T-111 Plywood with Cedar Trim (stained & sealed); Optional Sandstone

Thorowall® Stucco Exterior in Choice of Colors Wall Vent 1/8" Black Steel Frame & Expanded Mesh Welded to Galvanized Louvers with Fine

Mesh Screen, 181/4" x 223/4" x 2" (111 sq. in. free area) Door Pre-assembled 36" x 80" Steel, Honeycomb Core, Black, Stainless Steel Kick Plate Door Hinges Stainless Steel Self-closing (top & bottom model #US260), Std. Middle Hinge (model #US360) Door Handle Stainless Steel Yale Safety-Levered Locking Handle (dormitory style) Door Frame Reinforced Steel, Black Roof Structure Pre-assembled Wood Frame (200 lb. per sq. ft. snow load) Roofing Metal in Choice of Colors or optional Pre-assembled Cedar Shakes or Three-Tab Composition

Shingles in Choice of Colors Vent Shroud Pre-assembled Black Cold Rolled Steel, 18 ga.

Vent Pipe (2 piece) 12 " ID Schedule 40 ABS, 12' Overall Height Handicap Rails (2) Pre-assembled 42" Stainless Steel Toilet Riser and Seat 18", Cross-Linked Polyethylene, white, with Heavy-duty Polystyrene Seat Assembly.

Building Weight 1250 lb. (approx., includes building, roof, posts, siding, wall vent, shroud, vent pipe, hardware) Shipping Three Complete Romtec SST® Traditional Single Restrooms with Extended Floor Plan ship on a 48' closed trailer.

Installer Supplied Materials Concrete Pad & Footings 23' x 12' x 31/2" min. (reinforced with two layers 6x6-10x10 W.W.F. (6" x #10 steel mesh)*;

Post Footings: Four 16" x 16" x 12" min. (reinforced with 4 pcs. #4 x 12" rebar, poured monolithically with pad. Note: rebar in post footing over vault is 4 pcs. #4 36" at 12" o.c.)

Sonotube Footings: Two 12" diam. x 54" (reinforced with 4 pcs. #4 x 120" rebar)

Concrete Center Column & Footing Column: 51' x 6" avg. diameter.; Footing: 36" x 36" x 12" poured concrete (form supplied)

Concrete Volume & Weight

4.25 cu. yds. = 22,300 lbs. (approx., includes pad, center column, footings, reinforcing steel)

* Concrete pad may vary, depending on local soil and drainage conditions. Refer to local building codes.

Specifications are subject to change.Refer to your submittal documents for specificattions listed for your building.

ASTM Test Nom. Value Heat Deflection Temp., 66 psi D648-82 138oF Vicat Softening Temp. D1525-82 248oF Impact Brittleness Temp. D746-79 <-180oF Dart Impact (-40oC) ARM Std. (B) 60 ft.-lb.125 mil Environ. Stress Crack Resistance D1693-70 >1,000 hrs.

IMPORTANT! INSPECT THE VAULT BEFORE INSTALLING

The cross-linked polyethylene vault has been thoroughly inspected by Romtec before shipment to you, however, the vault may have been damaged in transit. THE INSTALLER IS RESPONSIBLE FOR INSPECTING THE VAULT BEFORE INSTALLATION. Use the following procedure to inspect the vault:

1. Make a thorough visual inspection of the exterior surface of the vault. Look for punctures and abrasions.

2. With the vault outdoors (preferably on a bright day), inspect very carefully inside the vault for light leaks. Light entering the vault through the polyethylene material indicates a possible leak.

3. DO NOT INSTALL the vault if you see light leaking through the vault. Contact Romtec for instructions.

Standard Installation Shown In Manual & Video Specifications and construction techniques in the manual and video show a standard installation with normal soil, drainage and temperature factors. Your installation may vary due to special factors at your site. Read the following information and refer to Figure 1 for special measures to support your concrete pad and building.

Cross-linked Polyethylene Vault is NOT the B uilding Foundation.

The vault is not designed to support the weight of the building and concrete pad. If soil shrinks away, the weight of the building and pad could press down on the vault causing damage. Problems can arise due to several causes:

1. If backfill material is not compacted well enough, it will eventually compress. If the concrete pad is resting on fill, the compressed soil will no longer support the building.

2. If ground water gets under the concrete pad it can wash away soil. As soil washes away, the weight of the pad and building will rest on the vault.

3. If soil around the vault is saturated with water, as in a flood, the pressure could damage the vault unless the vault is filled with water before the high water occurs.

4. If saturated soil under the concrete pad is frozen in winter and thawed in spring, the soil can swell and shrink, causing the weight of the pad and building to come to rest on the vault.

To ensure that your installation will have a sturdy base for many years to come, please consider using the following optional construction techniques:

Soil Conditions May Vary Know the soil conditions at your construction site during the entire year! The soil conditions at your site may vary, due to seasonal weather changes, surface or underground water, freeze/thaw cycles or seismic activity. It is very important that you plan the installation of your Romtec SST® restroom so there is support for the building and concrete pad in any soil condition at your site during all times of the year.

Do not assume that because the ground is hard packed in the fall, it will be the same during spring runoff or summer rains. This is very important, because the undisturbed ground outside the excavation for the vault must support the entire weight of the building and concrete pad.

If Over-Sized Excavation For Vault is Required The instructions in this manual call for excavation of a hole for the vault that is the same depth as the vault and has a maximum of one foot of space on all sides. If the removal of large rocks or debris makes it impossible to keep the hole this small, you should take the following measures to provide a solid base:

1. Use concrete to fill around the vault. IMPORTANT: If backfilling with concrete, the vault must be completely filled with water before backfilling to keep it from floating in the concrete.

2. Make the pad larger to extend to undisturbed soil. The pad and ground it is built on must support the building.

3. Two 12" sonotube forms are recommended for piers behind the vault. You may have to use additional 12" sonotube forms with footings below to construct additional steel-reinforced concrete piers which extend to solid ground under the building corners (see Figure 1).

VAULT CAUTIONS; SOIL, & DRAINAGE PLANNING

VAULT CAUTIONS; SOIL, & DRAINAGE PLANNING

Planning For Special Drainage Requirements Plan for year-round water on the surface and underground.

1. Locate the restroom in a well-drained site which will not experience erosion under or near the concrete slab during any time of the year.

2. If surface water is present or will be present at any time, install French drains and perforated drain pipe to carry water away.

3. If there is significant underground water, consider installing perforated pipe at the bottom of the hole to carry this water away.

4. Two sonotube forms are recommended for piers at the back of the vault. In very wet conditions, use additional 12" diameter sonotube forms to construct extra deep footings which extend to solid ground (see Figure 1).

Planning For Special Freeze/Thaw Requirements In areas with temperature extremes, changes in the soil can occur between winter and summer.

1. If the construction site is located where the ground can freeze deeper than 6", it is recommended that you dig a footing around the entire perimeter of the concrete pad to below the depth of the expected freeze.

2. If the restroom will be located where extremely deep ground frost is expected, use 12" diameter sonotube forms to construct extra deep piers which extend below the frost line under the building corners (see Figure 1).

REMEMBER: The entire weight of the building and concrete pad must be supported. The vault is not the foundation.

GROUND

OUTSIDE PAD

MUST SLOPE

AWAY WHEREVER

POSSIBLE.

ELEVATION VIEW FROM SOUTH SIDE OF EXCAVATION

NOT TO SCALE

IF GROUND SLOPES

TOWARD BUILDING, INSTALL

PERFORATED DRAIN PIPE IN

GRAVEL AT FOOT OF SLOPE.

IN EXTREMELY COLD

AREAS, DIG EXTRA DEEP

12" WIDE FOOTINGS

BELOW FROST LINE.

IN AREAS OF

UNDERGROUND WATER,

INSTALL PERFORATED

DRAIN PIPE IN GRAVEL

AT BOTTOM OF HOLE.

COMPACTED

SAND

BACKFILL

IF HOLE IS

OVER-SIZED,

USE

CONCRETE

AS BACKFILL

MATERIAL.

FOR ADDITIONAL BUILDING

SUPPORT, POUR 12" STEEL-

REINFORCED PIERS IN

SONOTUBES (not supplied).

OPTIONAL PRE-POURED

36" X 36" X 12" FOOTING SHOWN.

Foundation Construction Techniques

IN HEAVY RAIN AREAS,

CARRY AWAY RUNOFF WITH

FRENCH DRAINS

(PERFORATED DRAIN PIPE

IN GRAVEL) AROUND

ENTIRE PERIMETER OF

PAD.

IF HOLE IS OVER-

SIZED, BUILD

CONCRETE PAD

WIDER TO

UNDISTURBED SOIL.

Figure 1

IMPORTANT!

ALWAYS POUR A 36' X 36' X

12" CONCRETE FOOTING

UNDER CONCRETE-FILLED

VAULT CENTER COLUMN

IMPORTANT!

ALWAYS INSTALL THE 2" X

48" STEEL POST IN THE

CONCRETE-FILLED VAULT

CENTER COLUMN

STEPS 1 & 2: SITE SELECTION & EXCAVATION

UNDISTURBED SOIL

OUTSIDE HOLE

COMPACTED

BACKFILL

MATERIAL.

SAND

PREFERRED

Excavation/Backfill Detail

12" DIAM. x 54" SONOTUBE

PIERS AT BACK CORNERS

OF VAULTEXCAVATE 1' MAX.

OUTSIDE VAULT

Figure 2

Site Selection The Romtec SST Traditional Restroom with Extended Floor Plan should be installed in a well-drained area which can be excavated to a depth of 4' 6" and graded level over a 12' x 23' area.

To provide proper ventilation, the building should be oriented with the black vent shroud in the back facing SOUTH.

Important Ventilation Tips To make sure the rest rooms vent properly, you must do the following:

1. Select a site that provides an unobstructed flow of air across the top of the tall vent pipe.

2. Orient the building with the back facing south. Solar heat inside the black vent shroud improves ventilation.

3. Install the wall vent low on the wall where the prevailing winds are strongest. DO NOT install the wall vent in the back wall or door.

Excavation Refer to Figures 2 and 3 and excavate the hole for the vault as shown.

IMPORTANT! As the soil conditions vary in each installation, please take the following precautions to assure proper vault installation, backfill and compaction:

1. Try to place the vault in the hole on undisturbed soil. This is very important! Any backfill in the bottom of the hole to form around the bottom of the vault must be compacted.

2. There should be a maximum of 1 foot of space between the vault and undisturbed soil on the sides. If there is greater than 1 foot between the vault and undisturbed soil, you must backfill with concrete. Do not attempt to use regular backfill materials in any situation where there is any chance that the backfill may settle over time. IMPORTANT! IF YOU USE CONCRETE BACK-

FILL, THE ENTIRE VAULT MUST BE FILLED WITH WA-

TER UNTIL THE CONCRETE HARDENS. The added weight of the water will keep the vault from floating in the concrete.

3. The top of the vault must be level with undisturbed soil outside the hole. This is very critical. Never place the vault in the hole where any part of the vault is above the surface of the surrounding undisturbed soil, then attempt to use backfill to bring the site to the desired grade.

4. The concrete slab must span from the top of the vault to undis-turbed soil. It should never span more than 1 foot of compacted soil.

IMPORTANT! The compacted backfill material or concrete backfill becomes the base for the building and its concrete slab. Be sure that the material around the vaults is solid and will never settle or shrink away from the slab and undisturbed soil outside the excavation.

IMPORTANT!

USE CONCRETE

BACKFILL IF

HOLE IS MORE

THAN 1'

OUTSIDE VAULT.

STEPS 1 & 2: SITE SELECTION & EXCAVATION

9' MAX.

4' 6" 4'

7' 1'1'Excavation Side View

SOUTH

SCALE: 1/4" = 1'

Excavation Plan View 3' 7' max.

12'

2'

AREA BEHIND BUILDING

LEVEL UNDISTURBED SOIL.

NEVER BUILD UP SOIL OUTSIDE

VAULT TO MEET TOP OF VAULT.

23'

SEWAGE

CLEANOUT

LOCATION

750 GALLON

VAULT

LOCATION

EXCAVATION

3'

9' max.

LOCATE 36" x 36" x 12"

FOOTING FORM

BELOW CENTER

COLUMN LOCATION.

2x4 JOIST IS

LENGTHWISE WITH

VAULT.

COMPACTED BACKFILL MATERIAL.

IF GREATER THAN 1' WIDTH, USE

"ONE-SACK SAND SLURRY"

CEMENT.

LOCATION OF 36" x 36" x 12"

FOOTING FORM UNDER

CENTER COLUMN IN VAULT

LEVEL

UNDISTURBED

SOIL

LOCATE 12" x 54" SONOTUBE

PIER FORMS AT BACK

CORNERS OF VAULT

IMPORTANT EXCAVATION INFORMATION

• NEVER BUILD UP SOIL OUTSIDE VAULT TO MEET TOP OF VAULT.

• HOLE MUST NOT BE OVERSIZED.

• DON'T DIG HOLE TOO DEEP.

WARNING!

• THE INSTALLER IS RESPONSIBLE FOR THE ULTIMATE INTEGRITY OF

THE SOIL IN WHICH THE ROMTEC SST® IS INSTALLED.

• FAILURES WHICH OCCUR DUE TO IMPROPER INSTALLATION ARE

THE RESPONSIBILITY OF THE INSTALLER.

AREA IN FRONT OF BUILDING

SCALE: 1/4" = 1'

SOUTH

LOCATION OF 12" x 54"

SONOTUBE PIER

FORMS AT BACK

CORNERS OF VAULT

Figure 3

LOCATION OF 750 GALLON VAULT

AREA IN FRONT OF BUILDINGAREA BEHIND BUILDING

GROUND SLOPES AWAY

FROM EXCAVATION

11'

STEP 3: HANDLING & PARTS INVENTORY

Description Qty.

Complete SST Traditional Restroom includes:

Accessible Toilet Riser (18") 1 750-Gallon Vault (Black) 1 Sewage Cover with bolts (24") 1 Building Shell (Pre-assembled cross-linked polyethylene)

Grab Bars (42") 2 Steel Door (black) with Self-Closing Hinges 1 Steel Door Frame 1 T-111/Cedar Exterior or ThoroWall Stucco Exterior 1 Vent Shroud with 12" Vent Pipe 1

Roof (Pre-assembled) 1 4x4 Pressure-Treated Posts 4 Floor Pan (set over vault to locate building, set floor slope) 1 12" ABS Vent Pipe (12" x 67" installed through roof) 1 Kraft Paper Roll (50', for protecting walls from concrete) 1 36" x 36" x 12" Footing Form Kit (for under vault footing) 1 2" x 48" Steel Post (fits in vault center column) 1

Materials You Supply Ready-Mix Concrete:

Minimum 12' x 23' x 31/2" Pad & Footings 4.25 cu. yd.

Sonotube Pier Forms: 12" diam. x 54" long 2

Reinforcing Steel:

6x6-10x10 W.W.F. (6" x #10 steel mesh) 70' x 7'

#4 (1/2") Steel Rebar (for footings & piers) 120'

Description Qty.

1 Carton Containing:

Allen Wrench (for door adjustment) 1 Brown Caulking Tube (for exterior sealing) 1 Cedar Ridge Cap Piece (for finishing roofing) 1 Decorative Cedar Post Caps (post trim pieces) 4 Yale Levered Lockset and Key 1 Finish Nails (wood trim fasteners) 16 Kick-Proof Wall Vent with Tamper-Proof Hardware 1 Post Anchors (for anchoring 4x4 posts in concrete) 4 2" Lag Screws with Washers (for roof attachment) 6 #7 x 11/2" Screws (post anchor fasteners) 32 #10 x 3/4" Stainless Screws (toilet riser fasteners) 10 Pkg. of Tacks (for attaching kraft paper) 1 Stain and Touch-up Paint and Brush Kit 1 Toilet Seat and Hardware 1 Turnbuckle Kit (for squaring door frame) 1

Installation Video Tape (sent separately ) 1 Installation Manual (attached to side of building) 1

Handling Building & Lifting Shell

Handling

READ THE MANUAL AND ALL LABELS POSTED ON THE

BUILDING BEFORE HANDLING OR INSTALLING.

DANGER! Do not lift the building from the eye loop at the top of the building shell while still attached to the pallet. Use the eye loop ONLY to lift the building shell alone off the pallet and vault. Before handling the building, be sure the forklift is capable of safely lifting 1200 pounds.

1. If 8' fork extensions are available, install them on the forklift. If using standard (4') forks, you must use the attached rope to support the building. Insert full length of forks into pallet, then firmly secure rope to top of forklift (see Figure 4). Remove palleted building from truck and set it on level ground next to excavated site. Remove palleted roof from the truck and set it aside.

2. Read all labels posted on the building shell and roof. Labels contain important installation and safety information. Remove and properly dispose of all packing materials.

3. The door is secured for shipping. Remove the U-shaped bracket at the bottom of the door on the latch side. The steel reinforcing across the bottom of the door frame stays in place.

4. Open the door and remove the white toilet riser attached to the vault.

Remove the hardware box and other items from inside the vault.

5. Remove all screws to disconnect the building from the pallet. Attach a rope or cable from the backhoe bucket to the ring on top the building shell, then use the backhoe to lift the building shell off the pallet and vault as shown in Figure 4. Place the building shell upright next to the excavated site.

6. Remove the vault from the pallet and set it on its base.

Parts Inventory

1. Before beginning construction, check your kit with the parts list below.

Supplied Parts List for SST ® Traditional Single Restroom with Extended Floor Plan Parts are subject to change. Refer to the Detailed Packing List and Quotation documents for your building.

SECURE ROPE

TO TOP OF

FORKLIFT

USE 8' FORK

EXTENSIONS

IF AVAILABLE

Figure 4

16'

VAULT

BUILDING

SHELL

ATTACH BUCKET TO

RING ON TOP OF

BUILDING SHELL

Supplied Hardware 7/32" Allen Wrench for sewage cleanout bolts

5/32" Allen Wrench for self-closing hinge adjustment

Cedar Shake Ridge Cap Piece for finishing roofing

Decorative Cedar Post Trim Cap for trimming tops of 4x4 posts

5d Galvanized Finish Nail for fastening exterior wood trim

1/4" x 13/4" Allen Head Bolt & Spring Nut for fastening wall vent

4x4 Post Anchor for anchoring 4x4 posts in wet concrete

3/8" x 2" Lag Screw & Washer for fastening roof to building shell

#7 x 11/2" Phillips Head Screw for fastening posts to anchors/ hangers

#10 x 3/4" Stainless Steel Screw for fastening toilet riser to vault stack

Package of Tacks for attaching kraft paper to walls to prevent concrete from getting on walls

Turnbuckle Kit for squaring door frame

STEP 3: HANDLING & PARTS INVENTORY

2.5"

3"

2"

.75"

.75"

1.75"

1.75"

Vault Footing Form Kit Assembly The Footing Form Kit is packaged in the vault. It includes seven wood parts, screws for assembly and eight pre-cut pieces of steel re-bar.

1. Assemble the wood parts and re-bar as shown in Figure 5.

2. Bury the footing form in the vault hole so the top of the form will be even with the bottom of the vault. The 2x4 wood joist let into the wood frame should be positioned lengthwise with the vault.

STEP 4: VAULT INSTALLATION

2X4 FITS IN SLOTS

IN END PANELS

Footing Form Kit Assembly PLACE REBAR IN CRISS-

CROSS PATTERN ON ROCKS

IN MIDDLE OF FORM BOX

POSITION 2X4 WOOD JOIST

LENGTHWISE WITH VAULT

IMPORTANT!

SOIL IN BOTTOM OF VAULT HOLE MUST BE

COMPACTED TO FORM AROUND VAULT.

FASTEN BOX TOGETHER

WITH SUPPLIED SCREWS Figure 5

Installation

IMPORTANT! THE VAULT MUST BE INSPECTED FOR ANY

DAMAGE IN SHIPPING BEFORE INSTALLATION.

1. Make sure the ground at the bottom of the hole is well compacted before placing the vault. You can grade some sand in the bottom of the hole to support the vault if necessary. This will help level the vault.

Compact this sand to form the shape of the bottom of the vault.

2. Remove the sewage cleanout lid from the vault, and remove all the parts from inside. Tie a rope through the vault to the backhoe bucket and lower the vault into the hole. Make sure the deepest end of the vault is in the deep end of the hole, the center reinforcing hole is over the footing form, and the top of the vault is level with the top of the undisturbed soil. Replace the lid after placing the vault in the hole.

3. THE TOP OF THE VAULT MUST BE LEVEL! Use a carpenter’s level on top the toilet riser stack to make sure the top of the vault is level in all directions. If not, remove it from the hole and level as needed. After leveling the vault, drive a reference stake outside the work area level with the top of the toilet riser stack (see Figures 6 and 8)

4. Place two 12" x 54" long Sonotube forms (not supplied) at the back of the vault as shown in Figures 6 and 7. These forms will be tied to the vault center column with steel rebar and will be poured full of concrete to make solid piers to the undisturbed soil at the bottom of the excavation. The rebar and piers distribute the weight of the building. See Steel Reinforcement for more information.

STEP 4: VAULT INSTALLATION

CHECK VAULT WITH CARPENTER'S

LEVEL ON TOILET RISER STACK.

SEWAGE CLEANOUT

VENT

STACK

4' 6" 4'

FILL TANK WITH MIN. 1'

WATER BEFORE BACKFILLING.

IMPORTANT

• DIG A 36" x 36" x 8" DEEP HOLE

DIRECTLY UNDER CENTER COLUMN.

• LOCATE SUPPLIED FORM IN HOLE.

• USE SAND TO SHAPE BOTTOM OF HOLE.

• POSITION VAULT IN PLACE.

BACKFILL MATERIAL

MUST BE COMPACTED

IN 1 FT. LAYERS

UNDISTURBED SOIL

SOUTH

LOCATE CENTER COLUMN

OVER FOOTING FORM

STEEL POST IN

CENTER OF

COLUMN

2X4 JOIST IN

FOOTING FORM

TWO 12" X 54"

SONOTUBE

PIERS AT BACK

CORNERS OF

VAULT

Vault, Footing & Sonotubes Side View

Vault, Footing & Sonotubes Plan View

TWO 12" X 54"

SONOTUBE PIERS

(NOT SUPPLIED)

36" X 36" X 12"

FOOTING FORM

UNDER VAULT

CENTER COLUMN

2X4 JOIST IN

FOOTING FORM

IS LENGTHWISE

WITH VAULT

2" X 48" STEEL POST

WILL BE PLACED IN

CENTER COLUMN WHEN

CONCRETE IS POURED.

Figure 7

Figure 6

IMPORTANT

STEEL POST SHOWN IN

CENTER COLUMN FOR

REFERENCE ONLY. DON'T

PLACE POST IN COLUMN

UNTIL POURING CONCRETE.

STEP 5: BACKFILL & COMPACTION

Backfill & Compact in 1' Layers

Figure 8

TOP OF VAULT MUST

BE LEVEL WITH

UNDISTURBED SOIL

OUTSIDE EXCAVATION.

UNDISTURBED SOIL

UNDISTURBED SOIL

BACKFILL IN 1' LAYERS.

COMPACT EACH LAYER WITH

A MOTORIZED PACKER.

SET REFERENCE STAKE AT

LEVEL OF TOP OF TOILET

RISER STACK BEFORE

POURING WATER IN BOTTOM

OF VAULT.

Place 1 Ft. Water In Vault Before Backfilling & Compacting The hole must be backfilled and compacted around the vault. Be careful to not knock the vault out of level while working around it.

1. Fill around the base of the vault with the first foot of material, then put a foot of water in the bottom of the vault. The added weight stabilizes the vault. Note: The weight of the water may pull the top surface of the vault slightly out of level. This is normal. when you pour concrete into the footing form below the vault the top of the vault will come back to level. See Important Detail

2. Use available rock-free material (sand is best) to backfill around the vault in 1-2 foot layers. After backfilling each layer, compact the soil alongside the vault with a motorized packer. The foot of the packer should fit between the vault and the wall of the hole. The backfill material must be well packed to prevent settling.

3. After backfilling, be sure to grade the undisturbed ground outside the vault to be level with the top of the vault. DO NOT ATTEMPT TO

USE BACKFILL TO BRING THE SITE TO THE DESIRED

GRADE. LOOSE BACKFILL MATERIAL CAN SHRINK

AWAY FROM THE VAULT AND CONCRETE SLAB. The concrete slab must span from the top of the vault to undisturbed soil.

The finished grade should slope away from the building

IMPORTANT! If you have had to dig an over-sized hole to remove boulders or other material, it may be necessary to backfill with concrete. YOU MUST FILL THE ENTIRE VAULT WITH WATER

BEFORE BACKFILLING WITH CONCRETE.

Important Detail

THE WEIGHT OF THE WATER POURED IN THE

BOTTOM OF THE VAULT MAY PULL THE CENTER

OF THE VAULT DOWN, PULLING IT OUT OF

LEVEL. THIS IS NORMAL. THE VAULT WILL BE

RAISED UP TO LEVEL BY THE CONCRETE IN

THE FOOTING FORM AND CENTER COLUMN.

TOP OF TOILET RISER

STACK SHOWN OUT OF

LEVEL.

CONCRETE IN FOOTING

FORM AND CENTER

COLUMN WILL BRING

TOP OF VAULT BACK

TO LEVEL.

CARPENTER'S LEVEL

CHECK TOP OF TOILET RISER

WITH CARPENTER'S LEVEL.

COMPACT BACKFILL

MATERIAL AROUND

SONOTUBES

STEP 6: FLOOR PAN PLACEMENT

EAST SIDE

CONCRETE

PIER

FRONT EDGE

OF FLOOR PAN

FRONT CORNER

CONCRETE PIER

Concrete Pier Detail

CONCRETE PIERS PROVIDE SOLID BASE FOR

LEVELING BUILDING SHELLS.

SEWAGE

CLEANOUT

W/COVER

BOTTOM OF FLOOR PAN

MUST BE LEVEL

IMPORTANT!

The bottom of the floor pan and the ground around it must be level!

Floor Pan Location

CENTER

COLUMN

TOP OF VAULT

VENT

STACK TOILET

RISER

STACK

TOP EDGE OF PAN

SLOPES TOWARD

OPEN END.

OPEN END OF PAN

12" DIAM.

SONOTUBES

SOUTH

CONCRETE

PIERS

Figure 9

UNDISTURBED , LEVEL

GROUND AROUND VAULT

AND FLOOR PAN

CONCRETE

PIERS

Floor Pan Placement

1. Check that the compacted soil around the vaults is as level as possible, then dig out four holes for concrete piers (not supplied). Refer to Figure 9 and Concrete Pier Detail for their locations. These piers will provide a solid base for leveling the building shell.

2. After placing the piers, set the self-aligning floor pan over the vent stack and toilet riser stack in the top of the vault. The opening in the front of the pan will be on the north side of the vault.

IMPORTANT! The top of the floor pan is cut to allow a 1/4"-per-foot slope toward the door for proper drainage once the concrete is poured.

3. Make sure the bottom of the pan is level. This ensures the building will be plumb and produces the proper slope in the top edge of the floor pan. This will become the slope of the concrete floor toward the door (see Figure 9).

STEP 7: BUILDING PLACEMENT

2X4 STAKED IN

FRONT OF DOOR

IS SET TO SAME

LEVEL AS TOP OF

FLOOR PAN NEXT

TO DOOR FRAME.

Threshold Level Board

STEEL

SUPPORT

TURNBUCKLE

SHIM HERE

IF NECESSARY

DOOR FRAME

CARPENTER'S

LEVEL

DOOR FRAME

WORKER

INSIDE

SHELL FITS

VENT PIPE

OVER VENT

STACK

Figure 10FLOOR PAN

Placing Building Shell

Using Turnbuckle Kit

Figure 11

Figure 12

Building Shell Placement

1. Attach a rope or cable from the backhoe bucket to the ring in the top of the building shell, and lift the shell into place over the floor pan.

Placing the building shell requires one person to operate the backhoe while a helper stands inside the floor pan to make sure the vent pipe in the back of the building is lowered over the vent stack in the top of the vault (see Figure 10).

2. The building shell is placed on the ground and the top of the vault outside the floor pan. Be careful to not knock the pan or vault out of level.

3. Disconnect the backhoe after setting the building shell down

Squaring the Door

THE DOOR FRAME MUST BE SQUARE AND PLUMB!

1. Open the door and place a carpenter’s level on the front and side of the door frame. Check that the building shell is plumb in both directions.

If not level, adjust the shell at this time. Shims can be placed under the corners of the building shell to make it plumb.

2. Close the door and check that it does not rub on the frame at both the top and bottom.

3. A turnbuckle kit is provided to square the door frame if necessary. Two holes are located in the door frame for connecting the turnbuckle kit.

They are inside the shell at the top of the door frame on the latch side and at the bottom of the frame on the hinge side. To square the frame, connect the turnbuckle kit between these holes, and tighten the turn-buckle until the frame is square (see Figure 11).

4. After squaring the door frame with the turnbuckle kit, if necessary, insert wood shingle shims under the door frame to support the frame in this position. The turnbuckle kit remains in place until the concrete is set. Re-check the door to make sure it does not rub on the frame.

IMPORTANT! DO NOT REMOVE THE STEEL DOOR SUPPORT

LOCATED AT THE BOTTOM OF THE DOOR FRAME. IT WILL

BE CONCRETED IN PLACE.

Setting the Threshold Elevation

1. Prop the door open and stake a 2x4 into the ground in front of the doorway at the same level as the top edge of the floor pan next to the door. This establishes the level of the concrete threshold under the door. There should be 1" between the bottom of the door and the finished concrete surface at the threshold. When pouring the concrete floor inside the building, this board will be used as a reference for the top of the concrete (see Figure 12).

Roof & Vent Pipe Assembly

1. Disconnect the roof from its pallet. Attach a rope or cable to the backhoe bucket and connect it to the cable loops on top the roof. Lift the roof into place on top the building shell and gently rock it to level position (see Figure 13).

2. Check under the eaves with a carpenter's level and measure from the edge of the eave to the wall in several locations to make sure the roof is square and level on the building shell (see Figure 14).

3. Position a step ladder at the rear of the building and lift the short section of roof vent pipe into position. Feed the pipe through the hole provided on top the metal shroud and insert it into the bell at the top of the building vent pipe. Rock the pipe gently until it is against the bottom of the bell. It is installed properly when it will not rock any more. No glue is necessary (see Figure 15).

4. From inside the building, screw four lag bolts with washers into the four pre-drilled ceiling holes (see detail in Figure 15).

5. After attaching the roof, apply sealant around the joint where the vent pipe exits the shroud (see Figure 15).

STEP 8: ROOF & VENT PIPE INSTALLATION

Placing Roof On Building Shell

Vent Pipe Assembly & Roof Attachment

Figure 15

Figure 13

Figure 14

Roof Alignment

MEASURE

UNDER EAVES

TO CHECK

SQUARENESS

OF ROOF WITH

BUILDING

SHELL

CHECK EAVES

WITH

CARPENTER'S

LEVEL

ATTACH BACKHOE TO CABLE

LOOPS TO LIFT ROOF

LAG THROUGH PRE-

DRILLED HOLES IN CEILING

INTO WOODENROOF FRAME

WOODEN ROOF FRAME

APPLY SEALANT

BETWEEN PIPE

AND SHROUD.

INSERT ROOF

VENT PIPE INTO

BELL OF BUILDING

VENT PIPE BELOW

SHROUD. SEAL

AFTER

ATTACHING

ROOF.

STEP 9: CONCRETE FORMING

Concrete Forming The suggested minimum concrete pad size is shown in Figure 16.

Your installation may vary, depending upon requirements at your site, however the size should not be smaller than the suggested minimum. In high water table areas, the exterior concrete thickness should be increased from 3-1/2" to 5-1/2", except in the area of the sewage clean out stack.

Reinforcing steel mesh should be installed in the exterior slab area. Be sure to extend the mesh across the threshold to prevent cracking in this area of the slab. Reinforcing steel is not required in the building floor.

TO PROVIDE PROPER DRAINAGE, BE SURE CONCRETE

FORMS SLOPE AWAY FROM THE BUILDING AND VAULT!

COMPACTED

BACKFILL

IMPORTANT!

Reinforcing steel mesh is recommended for the entire slab to reduce cracking.

Install two layers of 6" wire mesh on all sides of the building and extend it 18"- 24" across the threshold inside the building. Be sure to pull the steel up into the concrete as the concrete is poured.

IMPORTANT!

TO PROVIDE PROPER

DRAINAGE, BE SURE

FINISHED CONCRETE WILL

SLOPE AWAY FROM THE

BUILDING IN ALL

DIRECTIONS.

22'

FORMS FOR

SUGGESTED

MINIMUM

CONCRETE

PAD

12'

7' 5" 2' 113/4" 2' 113/4"

DOOR

ROOF

LINE

VENT

SHROUD

SONOTUBE

FORMS

Concrete Forms

NOT TO SCALE

VAULT

SEWAGE

CLEANOUT

CENTER

COLUMN

6' 01/2"

POST &

FOOTINGPIER

BLOCK

Figure 16

7' 6"

7' 1"

STEP 10: POSTS & FOOTINGS, STEEL REBAR

Figure 18

CONNECT POSTS

TO ROOF

BRACKETS

Support Posts & Anchors

POST ANCHORS

ARE 1" MIN. ABOVE

FINISHED

CONCRETE LEVEL

FINISHED CONCRETE

LEVEL

16" X 16" X 12"

FOOTING UNDER

EACH POST

CHECK POSTS

ON TWO

SIDES WITH

CARPENTER'S

LEVEL

Measuring Post Length

Figure 17

MEASURE

LENGTH FROM

ROOF BRACKET

TO BOTTOM OF

2X4 AT FINISHED

CONCRETE

LEVEL.

CONCRETE FORM

BOARD

CONCRETE

Measuring & Hanging Support Posts Four support posts are hung from the roof for mounting in concrete.

1. First, remove the short shipping posts from the roof brackets.

2. The support posts are installed with concrete anchors which hold the post 1" above the finished concrete slab. To determine the finished concrete grade, lay a straight edge between the top of the form and the scribed line near the bottom of the building exterior walls. Make sure the finished concrete grade will slope away from the building.

3. The rear roof support posts are installed first. Measure from the 2x4 set to the finished concrete grade to inside the roof brackets, then subtract 1" from this measurement. This will be the length of this support post (see Figure 17).

4. Measure each post individually, then cut to the proper lengths.

5. Next, attach post anchors to the uncut factory ends of the posts.

6. Before hanging the posts, hang a plumb bob from the center of each roof bracket to the ground below. This is the center of the post hole.

Next, dig a 16" x 16" x 12" deep hole below each roof bracket to allow the post anchors to be suspended above the soil (see Figure 18).

Note: The post located over the vault requires extra steel rebar centered in the slab beneath the post. Place four pieces of #4 rebar 36" long at 12" o.c. in this location (see Figure 19).

7. Finally, fasten the posts to the roof brackets with the saw cuts up and the factory ends down..

BEFORE AND DURING THE CONCRETE POUR, CHECK THE

POSTS WITH A LEVEL TO BE SURE THEY ARE PLUMB.

1"

Post Footing Over Vault

FOUR PCS. #4 X 36" REBAR AT

12" O.C. CENTERED IN SLAB

BENEATH POST OVER VAULT

POST WITH

ANCHOR

Figure 19

STEP 10: POSTS & FOOTINGS, STEEL REBAR

Optional All-Weather Porch Footings

1. If your installation is to be equipped with the optional All-Weather

Porch, dig two 2' x 2' x 1' deep footings to provide support for the All- Weather Porch posts. See Figure 19 for the locations of these footings.

Location of Optional All-Weather Porch Footings

63 1/2" C-C63 1/2" C-C DIG 2' X 2' X 1' DEEP FOOTINGS FOR

OPTIONAL ALL-WEATHER PORCH

POSTS.87"

12' Figure 19

Steel Reinforcement

1. Lay two layers of 6x6-W4.0 x W4.0 WWF (6" steel mesh) in the entire exterior form and across the door threshold 18-24". Keep the mesh 2-3" in from the inside edge of the forms.

2. Bend six pieces of #4 rebar to fit between the sonotubes and the vault center column (see Figure 20).

3. Lay four pieces of #4 x 36" rebar in the area below the post located over the vault.

4. During the concrete pour, push the 2" x 48" steel post down into the vault center column.

TWO LAYERS 6" STEEL MESH

BEND TWO PCS. #4

REBAR INTO SONOTUBES

& CENTER COLUMN

4 PCS. #4 X 36"

REBAR UNDER

POST

EXTEND STEEL

MESH 18-24"

INTO BUILDING

STEEL POST IN VAULT

CENTER COLUMN

DURING POUR

16 Figure 20

Wall Vent Location & Installation IMPORTANT! To assure proper ventilation, the wall vent must be installed on the side of the building against which the prevailing winds blow.

1. Determine the direction of the prevailing winds and select a location on the wall where the wind is strongest. Install the wall vent low on this wall (see Figure 21).

STEP 11: WALL VENT INSTALLATION

2. Place the inside of the wall vent against the exterior wall and mark the wall for cutting.

3. Cut out the wall vent hole, being careful to make it no larger than is necessary to insert the vent.

4. After cutting, use a file to smooth the edge of the polyethylene material.

5. Use the tamper-proof bolts and nuts supplied to install the wall vent with the louvers pointing down as shown in Figure 22.

DO NOT INSTALL ANY OTHER VENTS IN THE BUILDING!

Figure 22

Wall Vent Installation

Figure 21

Wallr Vent Location

INSERT VENT AND

ATTACH WITH TAMPER-

PROOF BOLTS INTO

EXTERIOR PANELING

VENT SHROUD

DO NOT INSTALL WALLVENT IN BACK

WALL

INSTALL WALL VENT

LOW ON WALL

AGAINST WHICH

PREVAILING WINDS

BLOW

DO NOT INSTALL WALL VENT IN

DOOR

DOOR

POST

ROOF LINE

EXTERIOR WALL

DIRECTION OF

PREVAILING WIND

(EXAMPLE ONLY)

SOUTH

MARK WALL FOR

CUTTING WITH

BACK OF WALL

VENT

STEP 12: CONCRETE WORK

Finishing Concrete Around Toilet Riser Stack

CROSS SECTION

VAULTFLOOR

PAN

FINISH CONCRETE TO TOP

EDGE OF TOILET RISER STACK

Figure 23

CONCRETE

SLOPES TO DOORBACK OF

BUILDING

FILL CAVITY AROUND

VENT PIPE WITH

CONCRETE

USE A 2X4

PLACED ON TOP

OF FLOOR FORM

AND 2X4 STAKED

IN FRONT OF

DOOR TO SET

FINISH CONCRETE

GRADE

TOILET RISER STACK

CONCRETE

FLOOR

SLOPES TO

DOORWAY

REINFORCING

STEEL STAYS IN

CONCRETE TO

HOLD DOOR

SQUARE

Concrete Floor Details

Figure 242X4 STAKED IN FRONT OF

DOOR

PROP DOOR

OPEN TO POUR

CONCRETE

Pouring Floor Slab

1. Wrap the lower part of the building, inside and out, with the supplied paper to minimize splashed concrete and aid cleanup. Tacks are supplied to fasten the paper. See instructions with paper.

2. Pouring the floor and suggested minimum slab requires about 4 cubic yards of ready mix concrete. First pour the footing under the vault and the sonotubes and fit the steel rebar and post while filling the vault center column.

3. Next, pour the floor before the exterior. Use an 8' long 2x4, placed on the top edge of the floor pan at one end, and on the 2x4 staked in front of the doorway at the other, for setting the finish grade of the floor (see Figure 24).

4. Be sure to fill the pan with concrete to the top edge. DO NOT overfill or underfill. Work concrete into any gaps which may occur between the floor pan and interior walls. Finish the floor to the level of the top of the floor pan and flush with the top of the toilet riser stack (see Figure 23).

5. Be sure the threshold is smooth, with a slight slope (1/4" per foot) away from the building.

Pouring Exterior Slab

BE SURE TO FILL THE HOLE IN THE CENTER OF THE VAULT

TO FORM A CONCRETE REINFORCING COLUMN!

1. Pour concrete into exterior forms, pulling up the steel mesh into the concrete as you go.

2. Re-check all posts for plumb before concrete sets. Stake the posts in position, if necessary.

3. Apply a broom finish to the exterior slab and a light non-skid surface to the interior floor. Clean up any splashed concrete as soon as possible. Insulate the concrete if freezing is expected.

STEP 13: TRIM INSTALLATION

Cove Sealant

APPLY SEALANT AT

BASE OF WALL TO

FORM SMOOTH

CORNER Figure 25

Toilet Riser Installation

ATTACH

TOILET RISER

TO BLACK

FLANGE

Ridge Cap & Post Trim

Figure 27

Toilet Paper Dispenser (optional information)

POLYETHYLENE

WALL

Toilet Paper Dispenser Installation

EXPANSION

BOLTS

Figure 28

TOILET PAPER

DISPENSER

BRACKET

NOTE: The toilet paper dispenser is an option which can be supplied separately for the Romtec SST®

Traditional Restroom.

Install the dispenser of your choice, in the center of the back wall below the hand rail. Be sure to leave room for the height of the paper rolls. Use expansion bolts (mollies) to mount the dispenser (see Figure 28).

Figure 26

ATTACH SEAT

& LID BEFORE

INSTALLING

TOILET RISER

ATTACH WOOD

TRIM TO

POSTS

ATTACH CEDAR RIDGE

CAP TO FINISH ROOF

TOILET

RISER

Trim & Toilet Riser Installation After the concrete hardens, install the building trim and toilet riser.

1. A plastic, rectangular cover plate is supplied. Screw it to the back wall inside the building to cover the opening at the bottom of the wall.

2. Clean any loose concrete from the floor and apply a bead of the supplied sealant into the corner. Form the sealant into a smooth curve over the entire length of the interior walls. (see Figure 25).

3. Attach the seat and lid to the toilet riser with the supplied hardware.

4. Insert the white toilet riser into the toilet riser stack as shown in Figure

26. Fasten it with the supplied stainless steel screws.

5. The cedar ridge cap is nailed to the roof peak. Push the cable loops down into the roof frame, and nail the cedar cap piece over the hole.

6. Cedar trim pieces are nailed to the tops of the four support posts. Remove one side of the trim, fit it over the top of the post, and nail the assembled trim in place. Be careful to not split the wood (see Figure 27).

STEP 14: CLEAN UP & MAINTENANCE

Floor Finish & Building Touch-Up

1. After the concrete has hardened, apply a liquid sealer (not supplied) to the floor inside the building. This causes the concrete to harden evenly and reduces sweating inside the building while the concrete cures. The sealer also will help repel urine and bacteria, thus reducing a potential source of odor.

2. Remove the exterior forms and clean up any spilled concrete. If necessary, remove any remaining concrete from the building with a scrub brush and water. Paint and stain are provided to touch up any marks on the wood paneling which may have occurred during installa-tion.

3. If you have not already done so, it is recommended that at least one foot of water is placed in the vault at this time.

4. The installation is now complete, and the Romtec SST® Traditional Restroom is ready for use.

Periodic maintenance of the polyethylene surfaces is easily done with any cleaning solutions you prefer. Clean inside the building regularly to minimize odors.

The wooden exterior panels should be painted as needed with exterior-grade paint or sealer. Regular use of these materials will help keep the wood looking new. Replacement panel kits are available from Romtec, complete with installation instructions and all necessary hardware.

The wall vent and tall vent pipe must be kept clean to assure proper air flow and minimize odors inside the building. The SST® ventilation design causes pressure inside the building, which forces the air out the vent pipe.

This is aided by air passing over the top of the open vent pipe, creating negative pressure at the top of the pipe, and by convection, created within the black metal shroud.

Vault Cleaning The 750 gallon vault is designed for 11,000 uses and should be cleaned out accordingly. The 1" per foot slope of the bottom of the vault is designed to aid in pumping the vault. To clean out the vault:

1. Remove the sewage cleanout cover behind the building, and use a suction hose to remove the waste from the vault.

2. Use the pumper truck's pressure water system to wash down the walls inside the vault and dilute any remaining waste, then use the suction hose to remove the last remaining waste from the vault.

3. It is recommended that at least one foot of water is placed in the vault after cleaning.

OPTIONAL ALL-WEATHER PORCH INSTALLATION

Connecting Beam to Post

REMOVE TRIM

Figure 29

POST

Figure 30

PLUMB BOB

Supporting Level Beam & Marking Post Anchor Location

MIN. 2' SQUARE

FOOTINGS

FOR ALL-WEATHER

PORCH POSTS

SLIDE HANGER

OVER POST

TEMPORARY

POSTS

DRILL AND BOLT

THROUGH

HANGER AND

POST

CARPENTER'S LEVEL

ATTACH LOOP TO BACKHOE

BUCKET TO LIFT PORCH

SECTION

The All-Weather Porch is supplied as an optional addition to the Romtec SST® Traditional Restroom.

IMPORTANT: The All-Weather Porch installation method described here requires that the concrete slab harden for three days before drilling.

Note: If installing the All-Weather Porch on an existing SST® Traditional Restroom, you will need to remove the ridge cap to the center of the existing building,and remove the two trim pieces from the front rafter and about one foot of the shingles from the front end of the roof where the porch will attach. If there are trim pieces at the tops of the existing front support posts, they must also be removed at this time.

1. The All-Weather Porch is shipped on one pallet with posts, beams and hardware. With a fork lift, locate the pallet next to the area where the porch will be installed. Remove the posts and hardware, then unbolt the roof from the pallet and remove the bracing from the unfinished end of the porch roof.

2. Attach the backhoe bucket to the loop at the top of the porch section, lift it in place and slide the hanger over the upper end of the building corner support post (see Figure 29).

3. Carefully level each beam. Measure from the beam to the concrete, then cut and install temporary posts to support the beams level.

Post Anchor

Figure 32

UNCUT

FACTORY

END OF POST

Beam & Corner Posts

DRILL CONCRETE AND

CONNECT ANCHOR WITH

EXPANSION BOLT

CHECK CORNER

POSTS FOR

PLUMB

Figure 31

BEAM

BRACKET

HANGER

MARK CONCRETE AT

CENTER OF POST

ANCHOR

4. Drill through the hangers connecting the beams to the corner posts and fasten with bolts. Continue supporting the porch with temporary posts until installation is complete (see Figure 30).

5. Drop a plumb bob from the post brackets on the end of each beam to the concrete below. Mark the concrete. This is the center of the post anchor (see Figure 30).

6. To install the post anchors, first use an impact drill with a masonary bit to drill holes in the concrete at the points marked. Refer to instructions packaged with the anchor for details . Assemble the anchors in place.

Leave anchors loose for adjustment (see Figure 31).

7. Measure from the bracket on the end of each beam to the anchor below. Cut posts to these lengths, slip the uncut factory ends into post anchors and fit the posts into the post brackets on the ends of the beams.

Check the posts for plumb and the beams for level (see Figure 32).

8. Drill and bolt the brackets to the tops of the posts. Finally, tighten the bolts securing the post anchors to the slab and fasten the anchors to the bottoms of the posts.

9. You can now install the remaining shingles to the roof and complete the ridge cap. A strip of roofing felt is supplied to run down the seam between the building and all-weather porch roofs. Be sure to line up the shingles with those already on the roof.

10. The ridge cap is nailed over a strip of roofing felt. Leave 11 inches of each course exposed. The center cap piece is nailed on last.

This completes installation of the optional all-weather porch (see Figure 33).

Completed All-Weather Porch

Figure 33

OPTIONAL PRIVACY SCREEN INSTALLATION

An optional Privacy Screen can be installed between the front posts of the All-Weather Porch.

1. Locate the screen between the posts with approximately 5 inches between the bottom of the screen and the slab.

2. Check the top of the screen with a carpenter's level and make any necessary adjustments (see Figure 34).

3. Fasten the screen brackets to the posts with the supplied screws.

4. Use finish nails to fasten the trim boards over the screen brackets. This completes the installation of the optional Privacy Screen.

Privacy Screen Assembly

Figure 34

TRIM

BOARD

Figure 35

Completed All-Weather Porch with Optional Privacy Screen

5" BETWEEN BOTTOM

OF SCREEN AND SLAB

CARPENTER'S

LEVEL

ROMTEC SST® RESTROOMS

ADDENDUM TO

INSTALLATION

MANUAL

18240 North Bank Road Roseburg, OR 97470

541-496-3541 info@romtec.com www.romtec.com

IMPORTANT INSTALLATION REQUIREMENT

Backfilling Around the Underground Vault(s) with Concrete Slurry

Your Romtec SST® restroom building is supplied with one or more cross-linked polyethylene underground vaults. Proper installation of the vault(s) is very important.

ROMTEC REQUIRES THE USE OF CONCRETE SLURRY FOR

BACKFILLING AROUND THE VAULT(S) OF ALL SST®

RESTROOM BUILDINGS.

Concrete Slurry Backfill Procedure Use the following procedure for backfilling around the vault(s) with concrete slurry.

(Note: This procedure describes a single vault. Your building may have two or more vaults. Use this procedure for each vault.)

1. Dig the hole no more than 6” larger than the vault on any side. (Note: if the hole must be made larger, due to soil or site conditions, you may have to build forms for the concrete slurry backfill.

2. Refer to the manual for installation of the concrete footing under the vault. You must pour the footing full and let it begin to set up before placing the vault.

3. Place the vault in the hole and fill it with water. IMPORTANT! The vault must be filled with water to prevent it from floating in the concrete slurry.

4. Use a stiff mix of 2500 psi concrete slurry for backfill. Do not put too much water in the concrete.

This is the start of the file's text. The full file is on GovTribe.