Suntaheen_specs_final.pdf

PDF 521 KB Posted

Attached to
Suntaheen Creek Trailhead Vault Toilet
Solicitation number
AG-0120-S-14-0047
Issued by

About this file

AG-0120-S-14-0047 Project Specifications

View the file

Other files

File Type Posted
AG0120S140047_A001_SF1442ReplmtPgs.pdf PDF
AG0120S140047_A001_SecI_ReplmtPgs.pdf PDF
AG0120S140047_A001_SF30.pdf PDF
Suntaheen_dwgs_030214.pdf PDF
SuntaheenAreaPhotoC.JPG JPG image
SuntaheenAreaPhotoA.JPG JPG image
SuntaheenAreaPhotoB.JPG JPG image
Trad_Single_InstallManual.pdf PDF
AG0120S140047_VaultToilet_Install_fnl.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Suntaheen Creek Trailhead

Vault Toilet

USDA Forest Service

Tongass National Forest

Hoonah Ranger District

SUNTAHEEN CREEK TRAILHEAD VAULT TOILET

TONGASS NATIONAL FOREST – HOONAH RANGER DISTRICT

SECTION 000110 - TABLE OF CONTENTS

Number of Pages

DIVISION 00 – PROCUREMENT AND CONTRACTING DOCUMENTS

Section 003119 Existing Conditions Information…………………………..……………………… 2

DIVISION 01 - GENERAL REQUIREMENTS

Section 011100 Summary of Work………………………………………………………………….. 2 Section 011400 Work Restrictions………………………………………………………………….. 2 Section 013300 Submittals……………………………………………………………………………3 Section 014100 Regulatory Requirements…………………………………………………………. 2 Section 014200 References…………………………………………………………………………..3 Section 014300 Quality Assurance…………………………………………………………………..2 Section 014500 Quality Control……………………………………………………………………… 2 Section 015000 Temporary Facilities and Controls……………………………………………….. 2 Section 016600 Product Storage and Handling Requirements…………………………………...1 Section 017113 Mobilization…………………………………………………………………………. 1 Section 017123 Field Engineering…………………………………………………………………... 2 Section 017400 Cleaning and Waste Management………………………………………………..2 Section 017700 Closeout Procedures……………………………………………………………… 2

DIVISION 03 – CONCRETE

Section 033000 Cast-in-Place Concrete……………………………………………………………. 5

DIVISION 10 - SPECIALITES

Section 107400 Manufactured Exterior Specialties ……………………………………………… 2

DIVISION 31 - EARTHWORK

Section 311000 Site Clearing………………………………………………………………………... 3 Section 312300 Excavation and Fill………………………………………………………………… 4

DIVISION 32 - EXTERIOR IMPROVEMENTS

Section 321500 Aggregate Surfacing ………………………..…………………………………….. 3

END OF SECTION

SECTION 003119 – EXISTING CONDITIONS INFORMATION

003119 - 1

PART 1- GENERAL

1.1 LOCATION

A. This project is located on the Hoonah Ranger District on the shore of Chichagof Island within the Tongass National Forest. The site is approximately 15.8 miles east of the town of Hoonah along NFSR 85304.

B. Chichagof Island is served by charter airlines, the Alaska Marine Highway System, freight, and commercial barge lines. The nearest full service town is Hoonah, Alaska, which is about 40 air miles west of Juneau, Alaska.

1.2 CLIMATIC CONDITION

A. Suntaheen Creek Trailhead area is located in a maritime climate zone characterized by cool summers and mild winters. In general, the prevailing winds blow from the southwest.

B. Summer temperatures in Hoonah, about 16 miles west of the project site average 52 to 63°F;

winter temperatures average 26-39°F.

Average Summer Temperatures 52 to 63°F

Average Winter Temperatures 26 to 39°F

Temperature extremes -25 to 87°F

Average Annual Precipitation 100 inches

Average Annual Snowfall 71 inches

C. The normal construction season is early May to late September. Snowfall can occur as early as mid-September and freezing temperatures generally occur in early October. The ground often begins to freeze in late October and can remain frozen at depth into early May.

1.3 SURVEY DATA

A. Existing surface features were surveyed by the Government in 2012. Horizontal and vertical alignments shown on the plans are based on bearings, horizontal distances, locations and topographic information represented by that survey.

B. The Government makes no representation that the survey data shown on the plans is complete or that it addresses every site condition that may be significant to the work.

Provision of the survey data by the Government does not relieve the Contractor of the responsibility to carefully examine the site and to take account of any conditions at variance with or in addition to the conditions shown on the survey.

C. As of (8/30/2012) temporary benchmarks and survey staking for traverses, bearings, and points of intersection remain.

1.4 SITE INVESTIGATION

A. The Contractor acknowledges that s/he has satisfied himself/herself as to the nature and location of the work; and the general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electrical power, roads and uncertainties of weather, ground water table or similar physical conditions at the site, the conformation and conditions of the ground surface, the character, quality and quantity of surface materials to be encountered, the character of equipment and facilities needed prior to and during the prosecution of the work or the cost thereof under this Contract. Any failure by the Contractor to become acquainted with all of the available information concerning these conditions will not relieve the Contractor from responsibility for estimating properly the difficulty or cost of successfully performing the work.

SECTION 003119 – EXISTING CONDITIONS INFORMATION

003119 - 2

1.5 WEATHER DELAYS

A. The Contractor’s schedule shall consider seasonal weather patterns for the project area. Any costs incurred by the Contractor due to weather delays shall be borne by the Contractor at no additional cost to the Government.

END SECTION

SECTION 011100 – SUMMARY OF WORK

011100 - 1

1.1 DESCRIPTION

A. In general, the Work under this Contract includes, but is not necessarily limited to, the following major items of work as shown on the plans and as specified. The following descriptions are provided as an outline of major work items, and shall not be construed as an inclusive or complete listing of all items of Work under this Contract.

1. Vault Toilet Installation. Includes but is not limited to clearing and grubbing; excavation and backfill; installation of one Government furnished pre-engineered single vault toilet and sewage tanks with concrete pad.

2. Mobilization

1.2 WORDING OF SPECIFICATIONS

A. Throughout these specifications the abbreviation CO shall mean "Contracting Officer”

B. Technical sections of these Specifications are based on the Alaska Department of Transportation and Public Facilities (AKDOT) Standard Specifications for Highway Construction, latest edition. Other reference standards are specified in Section 014200. The Contractor shall become thoroughly familiar with all reference specifications.

SECTION 011400 – WORK RESTRICTIONS

011400 - 1

1.1 CONTRACTOR’S USE OF PREMISES

A. The Contractor's use of the project site shall be limited to work and materials storage required by this contract. Assume full responsibility for the protection and safekeeping of materials and products stored on the site.

B. The Suntaheen Trailhead Area shall remain open to hiking during construction. Public parking and safe paths to the river shall be available during construction. If, during the performance of work, it becomes necessary to modify vehicular or pedestrian traffic patterns at any location, notify the Contracting Officer at least 15 calendar days prior to the proposed modification date, and submit a Traffic Control Plan detailing the proposed controls to traffic movement for approval. The plan shall be in accordance with State and local regulations and the FHWA SA-89-006, Part VI. Make all notifications and obtain any permits required for modification of traffic movements. Provide cones, signs, barricades, lights, or other traffic control devices and personnel required to control traffic.

1.2 COORDINATION WITH OTHERS

A. Allow access to Government employees at all times.

1.3 SCHEDULING

A. The Contractor shall coordinate scheduling and timing of required administrative procedures to avoid conflicts and insure orderly progress of the work. Proposed schedule shall be provided to the CO 14 days prior to initiation of on-site work.

1.4 PROTECTION OF PUBLIC AND PROPERTY

A. Provide and maintain temporary barricades and warning signs to control access to protect the public and construction personnel from construction hazards.

B. Comply with Federal, State, and local laws, rules, and regulations concerning construction safety and health standards. Do not expose the public to, or require any workers to work under, conditions that are unsanitary, hazardous, or dangerous to health and safety.

C. Provide competent flag person(s) including necessary equipment as needed to ensure the safety of the traveling public.

D. Repair damage to existing public and private improvements to original condition at no additional cost to the Government. Control dust and noise to protect adjacent property from damage.

1.5 SAFETY

A. All construction methods shall be in compliance with the State of Alaska, Department of Labor, Division of Occupational Safety and Health Construction Standards.

1.6 UTILITIES

A. No utilities are available on-site. The Contractor shall make all arrangements and pay all costs of providing temporary water and power for construction purposes.

1.7 RECYCLED PRODUCTS

A. The Contractor is encouraged to use construction products and materials manufactured from recovered or recycled materials where it is economical and practical to do so.

SECTION 011400 – WORK RESTRICTIONS

011400 - 2

1.8 DISPOSAL SITE

A. A disposal site is not available at the project site. All materials to be disposed of by the Contractor shall be removed from the project site and disposed of by legal means. It shall be the Contractor's responsibility to locate a legal disposal area, to secure any necessary permits and to pay all costs involved in the disposal of materials.

B. Dispose of all hazardous waste, including treated wood, in accordance with applicable state and federal regulations.

1.9 INTENT TO BEGIN WORK

A. After Notice to Proceed is issued and the Post-Award Conference, the Contractor shall notify the Contracting Officer of his/her intent to begin initial construction at least five days in advance.

1.10 PROGRESS MEETINGS

A. Meetings shall be scheduled as directed by the Contracting Officer to review progress and facilitate efficient, orderly prosecution of the Work.

SECTION 013300 – SUBMITTALS

013300 - 1

A. Work Included:

1. Submittals are required under this contract for the purpose of establishing the final specifications for: (1 ) quality assurance; (2) design configuration; (3) performance standards; (4) color, texture, or finish; and/or (5) other features necessary for a complete description of the Work to be performed.

2. Submittals shall be approved by the Contracting Officer. The Contractor shall not purchase, order, ship, install, or otherwise incur costs for a product or other work subject to submittal approval until after approval is granted by the Contracting Officer; the Government shall not be responsible for payment for any work, product, design, etc., not approved .

3. Rejection of any submittals by the Contracting Officer constitutes notice that a resubmittal is required for the same purpose; rejections shall be explained.

4. The intent of the submittals is to provide complete information about the subject item sufficient for the Government to make a decision on that item's compliance with the purpose of the item and the general specification for that item. Descriptions contained in the approved submittals shall constitute an extension of the general specification concerning that item; and subsequent performance by the Contractor shall conform to submittal information except as allowed as substitutions in other sections as indicated.

1.2 RELATED WORK

A. Individual requirements for submittals may also be described in pertinent sections of the Technical Specifications.

1.3 QUALITY ASSURANCE

A. "Or Equal":

1. Where the phrase "or equal" or "equal as approved by the Contracting Officer," or "but are not limited to" occurs in the contract documents, do not assume that the materials, equipment, or methods will be approved as equal unless the item has been so specifically approved by the Contracting Officer.

PART 2 - PRODUCTS

2.1 REQUIRED SUBMITTALS

A. It shall be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the Work. Approvals must be obtained before starting any Work which involves them.

B. The following submittals are required following award of the contract for review and/or approval pursuant to contract provisions:

1. One copy of the Work Progress Schedule listing main types of Work and anticipated times for construction and completion.

2. One copy of the list of subcontractors proposed for the principle parts of the Work.

3. Copies of Certification and other documentation which establish the qualifications of proposed workers to perform the Work.

013300 - 2

2.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN

A. Submit three (3) copies as specified paragraph 2.2 A, above, in accordance with requirements of Section 015000.

PART 3 - EXECUTION

3.1 IDENTIFICATION OF SUBMITTALS

A. Consecutively number all submittals. Cross reference all submittals with the specific Section number of the specifications.

1. When material is resubmitted for any reason, transmit under a new letter of transmittal with a new submittal number.

2. On submittals, cite the original submittal number for reference.

B. Accompany each submittal with letter of transmittal showing all information for identification and checking.

C. On at least the first page of each submittal, and elsewhere as required for positive identification, show the submittal number in which the item was included.

D. Where contents from manufacturers include data not pertinent to the submittal, clearly show which portions of the contents are being submitted for review.

E. Maintain an accurate submittal log for the duration of the Work, showing current status of all submittals at all times. The submittal log shall be made available to the Contracting Officer for review upon request.

3.2 GROUPING OF SUBMITTALS

A. Make construction drawing submittals in a group containing all associated items to assure that information is available for checking each item when it is received.

1. Partial submittals may be rejected as not complying with the provisions of the contract.

2. The Contractor may be liable for delays caused by rejected submittals.

3.3 TIMING OF SUBMITTALS

A. Submit temporary erosion control plan at the Post Award Conference. No work shall be started on the project site until the erosion control plan is approved by the Contracting Officer.

B. Make construction submittals for the first phases of Work within 15 days of the date of the Notice-To-Proceed.

C. In scheduling, allow at least twenty (20) working days for review by the Contracting Officer following receipt of the submittal.

3.4 REVIEW OF SUBMITTALS

A. The Contracting Officer will review submittals with reasonable promptness, indicating in writing the appropriate approval category ("Approved," "Disapproved," "Approved Subject to Corrections Shown") upon them. One (1) copy of the drawings or vendor's data shall be returned to the Contractor and when corrections are required, the Contractor shall make such corrections. The drawing (or other vendor's data) shall then be resubmitted by the Contractor for approval until an unqualified approval is obtained. After unqualified approval is obtained, the Contractor shall furnish the Contracting Officer with three (3) copies of the approved submittals.

013300 - 3

B. Review by the Contracting Officer does not relieve the Contractor from responsibility for errors which may exist in the submitted data.

C. Revisions:

1. Make revisions required by Contracting Officer.

2. If the Contractor considers any required revision to be a change, the Contractor shall notify the Contracting Officer as provided for in the General Conditions.

TONGASS NATIONAL FOREST – HOONAH RANGER DISTRICT SECTION

SECTION 014100 – REGULATORY REQUIREMENTS

014100 - 1

1.1 DESIGN STANDARDS AND CODES

A. All work shall comply with the rules and regulations of federal, state, and local agencies having jurisdiction. The Contractor shall acquire all permits, licenses and approval needed to complete the project from applicable state and local officials.

B. The construction methods shall meet the latest edition of all national, state and local codes.

The following standards and codes are made part of the contract specifications. In case of conflict, the most stringent shall apply.

AAN American Association of Nurserymen

AASHTO American Association of State Highway and Transportation Officials

ACI American Concrete Institute

ADAABAAG Americans with Disabilities Act-Architectural Barriers Act

Accessibility Guidelines

ADEC Alaska Division of Environmental Compliance

AISC American Institute of Steel Construction

AITC American Institute of Timber Construction

ANSI American National Standards Institute

ASTM American Society for Testing and Materials

AWPA American Wood Preservers Association

AWPB American Wood Preservers Bureau

BEES State of Alaska Building Efficiency Standards

FSORAG USDA Forest Service Outdoor Recreation Accessibility Guidelines

FSTAG USDA Forest Service Trail Accessibility Guidelines

IBC International Building Code

ICBO International Committee of Building Officials

ISA International Society of Arboriculture

MUTCD Manual on Uniform Traffic Control Devices (Department of

Transportation)

NBS National Bureau of Standards (Department of Commerce)

OSHA Occupational Safety and Health Administration (Department of

Labor)

SSPC Steel Structures Painting Council

UFAS Uniform Federal Accessibility Standards

WWPA Western Wood Products Association

1.2 REFERENCE SPECIFICATION

A. At all times, keep the following documents on site and available for use by the Contractor, Subcontractors, if any, and Contracting Officer:

1. Alaska Department of Transportation and Public Facilities (AKDOT), Standard Specifications for Highway Construction, latest edition.

2. American Concrete Institute Specifications for Structural Concrete (ACI 301-5).

3. US Department of Transportation, Federal Highway Administration, Manual on Uniform Traffic Control Devices, latest edition.

TONGASS NATIONAL FOREST – HOONAH RANGER DISTRICT SECTION

SECTION 014100 – REGULATORY REQUIREMENTS

014100 - 2

1.3 VARIATIONS WITH REFERENCES

A. Promptly notify the Contracting Officer of any observed conflict between drawings and referenced standard or specification.

B. Assume responsibility for work known to be contrary to such requirements without notice.

SECTION 014200 - REFERENCES

014200 - 1

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specifications Sections, apply to this Section.

1.2 DEFINITIONS

A. General: Basic contract definitions are included in the Conditions of the Contract.

B. “Indicated”: The term “indicated” refers to graphic representations, notes, or schedules on the Drawings, or other paragraphs or Schedules in the Specifications, and similar requirements in the Contract Documents. Terms such as “shown,” “noted,” “scheduled,” and “specified” are used to help the reader locate the reference. Location is not limited.

C. “Directed”: Terms such as “directed,” “requested,” authorized,” “selected,” “approved,” “required,” and “permitted” mean directed by the CO, requested by the CO, and similar phrases.

D. “Approved”: The term “approved,” when used in conjunction with the CO’s action on the Contractor’s submittals, applications, and requests, is limited to the CO’s duties and responsibilities as stated in the Conditions of the Contract.

E. “Regulations”: The term “regulations” includes laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, as well as rules, conventions, and agreements within the construction industry that control performance of the work.

F. “Furnish”: The term “furnish” means supply and deliver to the Project Site, ready for unloading, unpacking, assembly, installation, and similar operations.

G. “Install”: The term “install” describes operations at the Project Site including the actual unloading, unpacking, assembly, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

H. “Provide”: The term “provide” means to furnish and install, complete and ready for the intended use.

I. “Installer”: An installer is the Contractor or another entity engaged by the Contractor, either as an employee, subcontractor, or contractor of lower tier, to perform a particular construction activity, including installations, erection, application, or similar operations. Installers are required to be experienced in the operations they are engaged to perform.

1. The term “experienced,” when used with the term “installer,” means having a minimum of 5 previous projects similar in size and scope to this Project, being familiar with the special requirements indicated, and having complied with requirements of authorities having jurisdiction.

2. Trades: Using terms such as “carpentry” does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as “carpenter.” It also does not imply that requirements specified apply exclusively to tradespersons of the corresponding generic name.

3. Assigning Specialists: Certain Sections of the Specifications require that specific construction activities shall be performed by specialists who are recognized experts in those operations. The specialist must be engaged for those activities, and their assignments are requirements over which the Contractor has no option. However, the ultimate responsibility for fulfilling contract requirements remains with the Contractor.

014200 - 2

i. This requirement shall not be interpreted to conflict with enforcing building codes and similar regulations governing the Work. It is also not intended to interfere with local trade-union jurisdictional settlements and similar conventions.

J. “Project Site”: The space available to the Contractor for performing construction activities, either exclusively or in conjunction, with others performing other work as part of the Project.

The extent of the Project Site is shown on the Drawings and may or may not be identical with the description of the land on which the Project is to be built.

K. “Testing Agencies”: A testing agency is an independent entity engaged to perform specific inspections or tests, either at the Project Site or elsewhere, and to report on and, if required, to interpret results of those inspections or tests.

L. “CO”: Contracting Officer.

1.3 SPECIFICATION FORMAT AND CONTENT EXPLANATION

A. Specification Format: These Specifications are organized into Divisions and Sections based on Construction Specifications Institute (CSI) MasterFormat 2004 Edition numbering system.

B. Specification Content: This Specification uses certain conventions regarding the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations or circumstances. These conventions are explained as follows:

C. Abbreviated Language: Language used in Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be interpreted as the sense requires. Singular words will be interpreted as plural and plural words interpreted as singular where applicable as the context of the Contract Documents indicates.

D. Streamlined Language: The Specifications generally use the imperative mood and streamlined language. Requirements expressed in the imperative mood are to be performed by the Contractor. At certain locations in the Text, subjective language is used for clarity to describe responsibilities that must be fulfilled indirectly by the Contractor or by others so noted. The words “shall be” are implied where a colon (:) is used within a sentence or phrase.

1.4 INDUSTRY STANDARDS

A. Applicability of Standards: Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publications Dates: Comply with the standards in effect as of the date of the Contract Documents.

C. Conflicting Requirements: Where compliance with 2 or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer to the CO before proceeding for a decision on requirements that are different, but apparently equal; and where it is uncertain which requirement is the most stringent.

1. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum acceptable. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of the requirements. Refer uncertainties to the CO for a decision before proceeding.

014200 - 3

D. Copies of Standards: Each entity engaged in construction on the Project is required to be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents. Where copies of standards are needed to perform a required construction activity, the Contractor shall obtain copies directly from the publication source.

E. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where such acronyms or abbreviations are used in the Specifications or other Contract Documents, they mean the recognized name of the trade association, standard-generating organization, authorities having jurisdiction, or other entity applicable to the context of the text provision. Refer to “Gale Research Co.'’ “Encyclopedia of Associations,” available in most libraries.

SECTION 014300 – QUALITY ASSURANCE

014300 - 1

A. Establish and maintain an effective quality control program and perform sufficient inspections and tests of all items of work, including those of subcontractors, to ensure compliance with the Contract Documents.

1.2 GENERAL

A. Provide for procedures to ensure that the latest Contract Documents, standards, codes, shop drawings and instructions are used for fabrication, construction and testing.

B. Furnish appropriate facilities, instruments and testing devices required for performance of the quality control program.

C. Contractor is responsible for inspections and tests required in Divisions 2 through 48, and the cost of same shall be included in the Contract Sum.

D. Ensure that the work of related trades is properly coordinated.

1.3 QUALIFICATIONS

A. Persons qualified by training and/or experience shall provide, install and/or perform all work.

Qualifications and/or minimum years of experience are specified in the technical sections of these Specifications. At the Pre-Work Conference, provide documentation demonstrating that qualifications for each phase of work will be met.

1.4 PRE-INSTALLATION

A. It is the Contractor's responsibility to be certain that all equipment and materials selected by the Contractor, subcontractors or material suppliers conform exactly to the requirements of the Contract Documents. Approval of a manufacturer's name by the CO does not relieve the Contractor of the responsibility for providing materials and equipment which comply with the Drawings and Specifications.

B. Before the installation of every major unit of work that requires coordination with other work, ensure that the unit of work can be installed and function as intended and required in conjunction with other work which has preceded or will follow. If the installer reports unsatisfactory conditions for installation, do not proceed until these conditions have been corrected.

1.5 INSTALLATION

A. Conform to testing and inspection requirements as specified. Coordinate enclosure of work with required inspections and tests, so as to avoid the necessity of uncovering work for that purpose.

B. Unless otherwise noted or directed, install all work in accordance with Manufacturer's recommendations for best results. Do not omit any preparatory steps or installation procedures unless specifically modified or exempted by the Documents.

C. Recheck measurements and dimensions of the Work, as an integral step of starting each installation.

D. Any modification necessary for the proper installation and function of an approved substituted item shall be made by the Contractor at no additional cost to the Government. The Contractor shall bear the cost of any detailing or design required to accommodate the change.

SECTION 014300 – QUALITY ASSURANCE

014300 - 2

E. Protect newly installed work to ensure that it will remain without damage or deterioration during the remainder of the construction period. If damage or deterioration should occur, restore to new condition at no additional cost to the Government.

SECTION 014500 – QUALITY CONTROL

014500 - 1

A. Contractor provided testing laboratory services.

1.2 RELATED WORK

A. Section 017800, Closeout Submittals

B. Individual Specification Sections: Inspections and tests required, and standards for testing.

1.3 REFERENCES

A. ANSI/ASTM D-3740: Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.

B. ANSI/ASTM E-329: Standard Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction.

1.4 SELECTION AND PAYMENT

A. Contractor will employ and pay for services of an independent testing laboratory to perform specified inspection and testing. Sampling and testing shall be provided to assure compliance with the requirements of the drawings and Specifications.

B. Employment of testing laboratory shall in no way relieve the Contractor of obligation to perform work in accordance with requirements of contract documents.

C. Under no circumstances shall a supplier of materials be allowed to act as an approved testing laboratory.

D. No materials shall be placed or installed without prior acceptance by the Contracting Officer, based on test and inspection results.

1.5 QUALITY ASSURANCE

A. Comply with requirements of ANSI/ASTM E-329 and ANSI/ASTM D3740.

B. Laboratory shall maintain a full-time registered engineer on staff to review services.

C. Laboratory authorized to operate in the State of Alaska.

D. Testing equipment shall be calibrated at reasonable intervals with devices of an accuracy traceable to either NBS Standards or accepted values of natural physical constants.

1.6 CONTRACTOR SUBMITTALS

A. Prior to start work, submit testing laboratory name, address, and telephone number, and names of full-time registered engineer and responsible officer.

B. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent tour of inspection, with memorandum of remedies of any deficiencies reported by the inspection.

1.7 LABORATORY RESPONSIBILITIES

A. Test samples of mixes submitted by Contractor.

B. Provide qualified personnel at site after due notice; cooperate with the Contracting Officer and Contractor in performance of services.

SECTION 014500 – QUALITY CONTROL

014500 - 2

C. Perform specified inspection, sampling, and testing of products.

D. Ascertain compliance of materials and mixes with requirements of contract documents.

E. Promptly notify the Contracting Officer and Contractor of observed irregularities or non conformance of work or products.

F. Perform additional inspections and tests required by the Contracting Officer.

1.8 LABORATORY REPORTS

A. After each inspection and test, promptly submit two (2) copies of the laboratory report to the Contracting Officer. Include: Date issued, project title and number, name of inspector, date and time of sampling or inspection, identification of product and specifications section, location in the project, type of inspection or test, date of test, results of test, and conformance with contract documents. When requested by the Contracting Officer, provide interpretation of test results.

1.9 LIMITS ON TESTING LABORATORY AUTHORITY

A. Laboratory may not release, revoke, alter, or enlarge on requirements of contract documents.

B. Laboratory may not approve or accept any portion of the work.

C. Laboratory may not assume any duties of the Contractor.

D. Laboratory has no authority to stop work.

1.10 CONTRACTOR RESPONSIBILITIES

A. Deliver to laboratory at designated location adequate samples of materials proposed to be used which require testing, together with proposed mix designs.

B. Cooperate with laboratory personnel and provide access to work.

C. Provide incidental labor and facilities for access to work to be tested, to obtain and handle samples at the site or source of products to be tested, to facilitate tests and inspections, and for storage and curing of test samples.

SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS

015000 - 1

A. Work under this Section includes temporary facilities to facilitate the Work and construction controls to protect workers and the public from injury, harm or discomfort.

1.2 RELATED WORK

A. Section 013300, Submittals

B. Section 024100, Demolition

C. Section 311000, Site Clearing

1.3 RULES AND REGULATIONS

A. All construction methods and procedures shall be in compliance with the State of Alaska, Department of Labor and Workforce Development, Division of Labor Standards and Safety.

B. The Contractor shall familiarize himself/herself with current OSHA rules and observe these regulations at all times during the term of this Contract.

1.4 UTILITIES

A. No utilities (water, sewer, electrical, or telephone) are available at the project site.

B. Contractor shall provide necessary temporary piping and water supply and, upon completion of the work, remove such temporary facilities.

C. Contractor shall provide and pay for the hauling and or pumping of water used in construction.

1.5 DRINKING WATER AND SANITARY FACILITIES

A. The Contractor shall provide sanitary facilities in accordance with all State of Alaska and local Sanitation Codes.

B. The Contractor shall ensure an adequate supply of safe drinking water for workers.

1.6 SAFETY AND NOISE CONTROLS

A. Provide all labor, material, and equipment necessary for protection of public, personnel, vehicles and the environment from injury or damage.

B. Erect all necessary barricades and guards. Post appropriate warning signs. Use a water truck as necessary to control dust.

C. Comply with all applicable regulations and restrictions in regard to noise levels and noise-generating activities.

1.7 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

A. The contractor shall prepare a temporary erosion control plan for his/her method of controlling erosion and the sedimentation of rivers, streams, ponds, drainage ditches, or other areas of water impoundment. The plan shall identify the location of temporary erosion control devices and materials proposed for use. Submit SWPPP Plan for approval as specified in Section 013300.

B. The Contractor shall construct and maintain approved temporary erosion control devices through completion of the construction, or as otherwise directed by the CO. Such work may

SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS

015000 - 2 include silt fencing, temporary berms, dikes, sediment basins, slope drains and the use of temporary mulches or other control devices as necessary to control erosion and sedimentation.

C. Erosion control devices shall be constructed prior to the start of clearing and grubbing operations, except as otherwise approved by the CO. The Contractor shall provide additional erosion control measures as directed by the CO to correct conditions that develop during construction that were not foreseen during preparation and approval of the temporary erosion control plan.

D. Address provisions outlined in 40 CFR 122.26, EPA’s General Permit Construction Activities 64 FR 68722 and EPA 832-R-92-005 and include, at a minimum, the following:

4. Identify potential sources of pollution which may reasonably be expected to affect the quality of storm water discharge from the site.

5. Select applicable BMP’s from EPA 832-R-92-005.

6. Describe and ensure implementation of BMP’s which will be used to reduce the pollutants in stormwater discharge at the construction site.

7. Ensure compliance with the terms of EPA’s 64 FR 68722 for stormwater discharge.

8. Provide a completed signed original of the Notice of Intent and Notice of Termination (except for effective date), to comply with EPA’s General Permit for Construction Activities 64 FR 68722.

1.8 CLEANUP AND DISPOSAL

A. Remove all temporary facilities and construction controls at the completion of the Work.

B. Leave work area clean and free of all debris associated with this Section of Work.

SECTION 016600 PRODUCT STORAGE AND HANDLING REQUIREMENTS

016600 - 1

PART 1 GENERAL

A. This work includes the protection of products scheduled for use in the work by means including, but not necessarily limited to, those described in this Section.

1.2 QUALITY ASSURANCE

A. Include within the Contractor's quality assurance program such procedures as are required to assure full protection of work and materials.

1.3 MANUFACTURERS' RECOMMENDATIONS

A. Except as otherwise approved by the Contracting Officer, determine and comply with manufacturers' recommendations on product handling, storage, and protection.

1.4 PACKAGING

A. Deliver products to the job site in their manufacturer's original containers, with labels intact and legible.

B. Maintain packaged materials with seals unbroken and labels intact until time of use.

C. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements, at no additional cost to the Government.

D. The Contracting Officer may reject as non-complying such material and products that do not bear identification satisfactory to the Contracting Officer as to manufacturer, grade, quality, and other pertinent information. All packaging must include evidence that materials comply with the Buy American Regulations.

1.5 PROTECTION

A. Protect finished surfaces, including jambs, columns, beams and fascias of openings used as passageways, through which equipment and materials are handled.

B. Provide protection for finished surfacing in traffic areas prior to allowing equipment or materials to be moved over such surfaces.

C. Maintain finished surfaces clean, unmarred, and suitably protected until accepted by the Contracting Officer.

1.6 REPAIRS AND REPLACEMENTS

A. In event of damage, promptly make replacements and repairs to the approval of the Contracting Officer and at no additional cost to the Government.

B. Additional time required to secure placements and to make repairs will not be considered by the Contracting Officer to justify an extension in the Contract Time of Completion.

SECTION 017113 – MOBILIZATION

017113 - 1

PART 1 – GENERAL

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 METHOD OF MEASUREMENT

A. The measurement shall be lump sum for mobilization.

1.3 BASIS OF PAYMENT

A. The lump sum price shall include full compensation for mobilization. Progress payments for mobilization will be made as follows:

1. The total amount of premiums paid by the Contractor to obtain performance and payment bonds will be paid at one time together with the first progress payment otherwise due.

2. When 5 percent of the total original contract amount is earned from other schedule items, 50 percent of the amount bid for mobilization will be paid, exclusive of any amount already paid the Contractor for performance and payment bond premiums.

3. When 10 percent of the total original contract amount is earned from other schedule items, the balance of the amount bid for mobilization will be paid.

SECTION 017123 – FIELD ENGINEERING

017123 - 1

A. All field engineering services required to complete the work shall be provided by the Contractor unless otherwise noted.

1.2 RELATED WORK

A. Section 017700, Close Out Submittals

1.3 QUALITY ASSURANCE

A. Cost of field engineering shall be considered incidental to the item being constructed.

B. Survey work shall be completed by, or under the direct supervision of, a person experienced in construction surveying.

C. Provide layout and grade staking according to professional engineering and surveying procedures for the type of work being performed.

D. Provide structural design of shores, forms and similar items used by the Contractor as part of his/her means and methods of construction.

E. During the course of construction, the Contractor shall make available a person to help the Contracting Officer with field checking of grades and control as may be necessary to assure proper construction.

1.4 REFERENCE POINTS

A. Locate and protect monuments, bench marks, and initial control point, or reference thereto, prior to commencing work. Establish additional reference points as needed during construction.

B. Report to the Contracting Officer when reference points or initial control points are lost or destroyed during construction. Replace points immediately.

1.5 BASE DATA

A. Refer to Section 003119.

1.6 REQUIREMENTS

A. Establish lines and levels to properly layout and construct the work to the dimensions and elevations shown on the Plans. Re-establish and restake survey bearings, traverse lines, stationing and points of intersection as required to construct the work to the horizontal and vertical alignments as detailed.

B. Take measurements as far in advance of required installation as possible and verify measurements given on Drawings. Promptly report variations, discrepancies or nonclosing dimensions with the Contracting Officer for further direction.

C. Maintain construction lines and grade staking to assure accurate and proper control of the work and to verify final grades and construction lines.

D. Periodically, verify layouts and elevations by methods as required. No extra will be paid to the Contractor for removal and replacement of work which is found to be incorrectly installed.

1.7 FIELD ADJUSTMENTS

SECTION 017123 – FIELD ENGINEERING

017123 - 2

A. The Government reserves the right to field adjust layouts and grades for the purpose of avoiding obstructions and/or conforming to existing site features.

B. The Contractor shall make adjustments as directed by the Contracting Officer at no additional cost to the Government.

1.8 SURVEY RECORDS

A. Maintain a complete, accurate log of all control and construction survey work as it progresses.

SECTION 017400 – CLEANING AND WASTE MANAGEMENT

017400 - 1

PART 1 - GENERAL

A. All clean up work including all materials, labor and equipment necessary for cleaning and debris removal.

1.2 DISPOSAL REQUIREMENTS

A. Conduct cleaning and disposal operations to comply with local codes, ordinances and regulations.

B. Dispose of all debris and materials at a site approved by the USFS, Contracting Officer, and Local Authority.

C. The Contractor shall be responsible for all costs and fees associated with disposal of waste materials and debris.

2.1 MATERIALS

A. Use only those cleaning materials which will not create hazards to health or property and which will not damage surfaces.

B. Use cleaning materials only on surfaces recommended by cleaning material manufacturer.

3.1 DURING CONSTRUCTION

A. Execute periodic cleaning to keep the work site and adjacent properties free from accumulations of waste materials and trash.

B. Provide on-site containers for the collection of waste materials and trash.

3.2 DUST CONTROL

A. Clean interior spaces prior to the start of finish painting and continue cleaning as needed until painting is finished.

B. Schedule operations so that dust and other contaminants resulting from cleaning process will not fall on wet or newly-coated surfaces.

3.3 FINAL CLEANING

A. At the completion of the project, or prior thereto if so directed by the Contracting Officer, the Contractor shall be responsible for complete cleaning of those portions of the project and site which his work effects.

B. Sweep and clean concrete slabs and toilets thoroughly and remove all marks, stains, fingerprints, dust, dirt, paint drippings and other construction residue from all surfaces. Clean and touch up all painted work. Clean site and remove excess debris, branches, rocks, and trash.

C. Prior to final inspection by Contracting Officer, Contractor shall conduct his own inspection of exposed interior and exterior surfaces, and all work areas, to verify that the entire work is clean and ready for inspection and use by the Government.

SECTION 017400 – CLEANING AND WASTE MANAGEMENT

017400 - 2

3.4 RESTORATION OF DAMAGED PROPERTY

A. To the extent that any roads, vegetation, structures, utilities or other items are damaged or displaced by the Contractor's operations, these shall be restored to their original or better condition prior to Final Inspection. This shall include both on-site and off-site items. Any damage which is severe enough to disrupt community travel or utilities shall be repaired by the Contractor immediately, when requested by the Contracting Officer.

SECTION 017700 – CLOSEOUT PROCEDURES

0177700 - 1

A. This Section describes an orderly and efficient transfer of the completed work to the USFS.

1.2 QUALITY ASSURANCE

A. Prior to requesting inspection by the Contracting Officer, use adequate means to assure that the work is substantially completed in accordance with the specified requirements and is ready for the requested inspection.

1.3 PROCEDURES

A. Substantial Completion:

1. Substantial completion is defined as that point at which the work is basically complete and ready for use. All specified products shall have been installed and are functionally operational. Remaining work shall be extremely minor or require seasonal opportunity to complete or subject to delayed completion items and shall not impair the functionality of the site.

2. The Contractor shall notify the Contracting Officer, in writing as required by the General Conditions, as to the date when in its opinion all or a designated portion of the work will be substantially completed and ready for inspection.

3. Within a reasonable time after receipt of such notice, the Contracting Officer will inspect to determine status of completion.

4. Should the Contracting Officer determine that the Work is not substantially complete:

i. The Contracting Officer promptly will so notify the Contractor in writing, giving the reasons therefore.

ii. The Contractor shall remedy the deficiencies and notify the Contracting Officer when ready for reinspection.

iii. The Contracting Officer will reinspect the Work.

iv. The Contractor shall be liable for expenses incurred by the USFS for reason of such Substantial Completion Reinspection.

5. When the Contracting Officer concurs that the Work is substantially complete:

i. The Contracting Officer will prepare a Punch List of items to be completed or corrected, as verified by the CO.

ii. The Contracting Officer will submit the Punch List to the Contractor for their written acceptance of the responsibilities assigned to them in the Punch List.

iii. Once the Contractor executes the Punch List, the Contracting Officer must be notified in writing.

B. Immediately following approval of Substantial Completion, the Contractor shall submit the following documents.

1. Final Pay Request with final adjustment of accounts stating all adjustments to the contract sum.

i. Previous change orders.

ii. Deductions or uncorrected work.

SECTION 017700 – CLOSEOUT PROCEDURES

0177700 - 2

iii. Other adjustments.

2. Contractor's Certificate and Release

3. Operation and Maintenance Manuals.

4. As-Built Drawings and Submittals.

C. Final Inspection: Final Inspection shall be defined as that period at which all work in the Contract is 100% complete and no minor details remain to be performed.

1. Final inspection shall not be made until all work under the contract is completed. The Contractor shall notify the Contracting Officer in writing, at least 4 days prior to the date requested on which the work will be ready for final inspection.

2. Following notification, the Contracting Officer will make an inspection of the Contractor's work and record any deficiencies on the Final Punch List. The Contractor shall immediately correct these deficiencies at her/his own expense and notify the Contracting Officer in writing when all items have been corrected. The Contracting Officer will re-inspect the work to assure correction of all deficiencies before release of amounts retained for minor, seasonal or delayed items. The Contractor shall be liable for all costs of reinspection when the Substantial Completion Punch List deficiencies have not been corrected at the time of the Final Inspection and reinspection is required.

3. Any reasonable delay by the CO in making final inspection shall not relieve the Contractor of responsibility for the work nor shall the Government be held responsible for damages or claims for compensation on account of continuing overhead, maintenance, etc., occasioned by such a delay.

D. Final Pay Request will be processed for payment upon final inspection and Contracting Officer’s certification that work under the contract is 100% complete.

2.1 WARRANTY

A. The Contractor warrants the products delivered under the contract to be free from defects in design, material or workmanship, and against damage caused prior to final inspection.

Unless otherwise specified, this warranty extends for a period of one (1) year from the date of final acceptance.

B. The Contractor shall promptly repair or replace all defective or damaged items delivered under the Contract. The Contractor may elect to have any replaced item returned to his plant at his expense.

SECTION 033000 – CAST-IN-PLACE CONCRETE

033000 - 1

A.