Suntaheen_dwgs_030214.pdf
PDF 903 KB Posted
- Attached to
- Suntaheen Creek Trailhead Vault Toilet
- Solicitation number
- AG-0120-S-14-0047
About this file
AG-0120-S-14-0047 Project Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG0120S140047_A001_SF1442ReplmtPgs.pdf | ||
| AG0120S140047_A001_SecI_ReplmtPgs.pdf | ||
| AG0120S140047_A001_SF30.pdf | ||
| SuntaheenAreaPhotoC.JPG | JPG image | |
| SuntaheenAreaPhotoA.JPG | JPG image | |
| Suntaheen_specs_final.pdf | ||
| SuntaheenAreaPhotoB.JPG | JPG image | |
| Trad_Single_InstallManual.pdf | ||
| AG0120S140047_VaultToilet_Install_fnl.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recommended by:
Forest Engineering Staff Officer
Forest Landscape Architect
DATE
DATE
DATE
Forest Recreation Staff Officer
DATE
VICINITY MAP
132°136°138°140°142° 134°
JUNEAU
132°
GULF OF ALASKA
58°
Sitka
138°
60°
Yakutat
ALAS
KA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
INDEX TO SHEETS
NO. DESCRIPTION
1 COVER SHEET
UNTAHEEN CREEK TRAILHEADS
Forest Supervisor
Approved by:
POW
DATE
DATE
Craig
CONCRETE PAD DETAILS
TRAIL DETAILS
District Ranger, Hoonah
VAULT TOILET
DATE
Director of Recreation
Director of Engineering
SITE PLAN
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SUNTAHEEN CREEK TRAILHEAD VAULT TOILET COVER SHEET
HOONAH RANGER DISTRICT
TL / DD 11/1/13
DD 11/1/13
11/1/13 Sht01_cover 1 4
N O R T H
HOONAH RANGER DISTRICT
PROJECT
LOCATION
56°
N
S
F
R
PROJECT
LOCATION
N
S
N
S
T o
H o o n a h
NFSR 85304
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SUNTAHEEN CREEK TRAILHEAD VAULT TOILET SITE PLAN
HOONAN RANGER DISTRICT
D.DAVIS 12/5/13
D.DAVIS 12/5/13
2 4
MUSKEG SEEP
SUNTAHEEN CREEK
EXISTING PLATFORM
EXISTING TRAIL
EXISTING PARKING AREA
INSTALL VAULT TOILET,
(GOVT. FURNISHED)
SEE SHEET 3
REMOVE EXISTING LOG BARRIER TO ALLOW FOR
PLACEMENT OF NEW CURB & AGGREGATE
INSTALL NEW AGGREGATE PATH
SEE SHEET 4
ALTERNATE VAULT TOILET LOCATION,
NOT SELECTED
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SUNTAHEEN CREEK TRAILHEAD VAULT TOILET CONCRETE PAD DETAILS
HOONAH RANGER DISTRICT
D.DAVIS 12/05/13
D.DAVIS 12/5/13
ACAD.DWG
3 4
22'
12" Ø x 54" LONG SONOTUBE PIERS ON TOP OF 36" x 36" x 12"
FOTTINGS (2 EACH)
6" OF CONCRETE SLURRY BACKFILL
AROUND VAULT
CONCRETE FILLED VAULT CENTER
COLUMN W/ 2" x 48" STEEL POST
CONCRETE PIERS FOR SOLID
BASE TO LEVEL BUILDING SHELL
(4 each)
FILL FLOOR PAN WITH CONCRETE
16" x 16" x 12" DEEP FOOTING TO SUPPORT ROOF POSTS (4 each)
36" x 36" x 12" DEEP CONCRETE
FOOTING PAD UNDER CENTER OF
VAULT
B B
CONCRETE PLAN VIEW
VAULT TOILET SITE PLAN
SECTION B
SEE ROMTEC INSTALLATION
MANUAL FOR REQUIRED CONCRETE
REINFORMCEMENT AND COMPLETE
INSTALLATION INSTRUCTIONS.
MANUAL IS INCLUDED IN SECTION J
OF CONTRACT.
24" X 24" X 12" DEEP FOOTINGS
FOR ALL-WEATHER PORCH
(2 EACH)
5-1/2" THICK EXTERIOR CONCRETE
SLAB
FOOTINGS NOT SHOWN FOR CLARITY
1'
CONCRETE SLAB
CRUSHED AGGREGATE
COMPACTED EMBANKMENT
MATERIAL AS NEEDED TO
PROVIDE STABLE BEARING
SURFACE
22'
12'
3:1
NO SCALE
3:1
LEGEND:
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
CP3:
NORTHING: 10073.94'
EASTING: 4941.42'
ELEVATION: 195.12'
2%
199.55 199.11
199.31 198.87
ROMTEC VAULT
TOILET
CONCRETE PAD
SEE DETAIL,
THIS SHEET
NEW AGGREGATE TRAIL, MIN
4' WIDTH. MAX SLOPE = 5%.
EXISTING
PARKING AREA
NEW ALASKA YELLOW
CEDAR CURB
NEW ALASKA
YELLOW CEDAR
CURB
NOTES:
1. VAULT TOILET TO BE FIELD STAKED BY CO.
INSTALL IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION MANUAL.
2. VAULT TOILET TO BE FURNISHED BY GOVERNMENT.
3. TRAIL SHALL BE LEVEL WITH CONCRETE PAD AT TIE
IN LOCATION.
REMOVE EXISTING LOG
BARRIERS
CRUSHED AGGREGATE.
TIE INTO EXISTING GROUND.
CURB TO BE FLUSH WITH
EXISTING GRADE AT
START OF TRAIL
NATURAL
GROUND
5' MIN
C
LE
A R
IN
G
LI
M
IT
S
6' 6'
199.55
CRUSHED AGGREGATE
SLOPED CONCRETE TRANSITION
NO SCALE
-1
/2
2'-0" 5' (MIN)
SLOPED CONCRETE
TRANSITION
8.33%
CONTROL JOINT5-12" THICK CONCRETE SLAB
6 X 6 X 1.4W X 1.4W WELEDED
WIRE FABRIC IN FLAT SHEETS
-1
/2
"1
2'
SLOPED CONCRETE TRANSITION
(SEE DETAIL, THIS SHEET)
Stumps between the trailway and clearing limits.
Side slope less than or=to 10%
Side slope over 10%
Side slope less than or=to 10%
Side slope over 10% Stumps outside the clearing limits
ALL HEIGHTS MEASURED ON U[HILL SIDE OF STUMPS.
6"
6"
6"
6"
6"
6"
6"
6"
STUMP POSITION SIDE SLOPE UPHILL DOWNHILL
STUMP HEIGHT REQUIREMENTS
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SUNTAHEEN CREEK TRAILHEAD VAULT TOILET TRAIL DETAILS
HOONAH RANGER DISTRICT
D.DAVIS 12/05/13
D.DAVIS 12/5/13
ACAD.DWG
4 4
4" X 6" ALASKA YELLOW CEDAR
CURB. TOP OF CURB TO BE 3"
ABOVE FINISH GRADE WHEN
INSTALLED NEXT TO UNDISTURBED
GROUND WHERE FILL IS NOT
REQUIRED.
TRAIL PLAN VIEW
CLEARING LIMITS FOR TRAIL
NO SCALE
NOTES:
TRAILBED PREPARATION:
1. WHERE SOUPY MUCK EXISTS, REMOVE MUCK TO A
DEPTH EQUAL TO BASE COURSE AND SURFACE
COURSE PRIOR TO PLACING GEOTEXTILE AND
AGGREGATE.
2. RETAIN ROOTS AND ROCKS THAT PROVIDE
STRUCTURAL STRENGTH AND DO NOT PRESENT
TRIPPING HAZARD.
TRAIL CONSTRUCTION:
1. THE FINISHED TRAIL WIDTH SHALL BE A MINIMUM OF
4 FT.
2. FINISHED TRAIL GRADE OF 5% IS PERMITTED FOR
ANY DISTANCE.
3. ANY AGGREGATE SPILLED OUTSIDE THE TRAIL
SURFACING SHALL BE IMMEDIATELY REMOVED.
aGGREGATE SHALL NOT BE TRANSPORTED OVER
UNPROTECTED GROUND.
4. PREDRILL REBAR HOLES TO PREVENT SPLITTING OF
CURB.
TESTING:
1. BASE AND SURFACE COURSE AGGREGATE AND FILL
MATERIAL SHALL BE COMPACTED IN ACCORDANCE
WITH SECTION 321500.
30" 30"
#4 REBAR - 24" (MIN) INTO EARTH
GEOTEXTILE TO WRAP UP INSIDE
TIMBER TO TOP OF BASE COURSE.
UNDISTURBED EARTH
TRAIL CROSS SECTIONS
NO SCALE
CRUSHED AGGREGATE
SURFACING (4" TYP.)
BASE COURSE (6"
MIN)
4" X 6" ALASKA
YELLOW CEDAR CURB
UNDISTURBED EARTH
MITER JOINTS BETWEEN
CURBS TO ENSURE
TIGHT FIT
REBAR NO TO EXCEED
30" O.C. SPACING
CRUSHED AGGREGATE
SURFACING (4" DEPTH TYP)
SET REBAR +/- 6" FROM
END TO PREVENT SPLITTING
CUT ALL LOGS
CUT
CUT
EXISTING PARKING
AREA
CUT
TRAILWAY
UPHILL
CLEARING LIMIT
DOWNHILL
CLEARING
LIMIT
TRAILBED
V
ER
TI
C A L
C
LE
A R
IN
G
LI
M
IT
UPHILL CLEARING LIMIT IS 18" FROM EDGE OF TRAILBED.
DOWNHILL CLEARING LIMIT IS 18" FROM EDGE OF TRAILBED.
VERTICAL CLEARING LIMIT IS 8' ABOVE FINISHED GRADE.
CRUSHED AGGREGATE
SURFACING (4" TYP.)
BASE COURSE (6"
MIN)
EXISTING PARKING
AREA
4" X 6" ALASKA YELLOW CEDAR
CURB. TOP OF CURB TO BE 3"
ABOVE FINISH GRADE.
#4 REBAR - 24" (MIN) INTO EARTHGEOTEXTILE TO WRAP UP INSIDE
TIMBER TO TOP OF BASE COURSE.
UNDISTURBED EARTH
COMPACTED NATIVE SOIL OR
SELECT FILL
3:1
1'
| Sht01_cover_stb-Cover |
| Hoonah-Suntaheen siteplan-siteplan |
| Hoonah-Suntaheen siteplan-concrete details |
| Hoonah-Suntaheen siteplan-trail details |
File details come from the government source that posted it. Updated .