Questions-Answers1.pdf

PDF 1 MB Posted

Attached to
Bridge Remove/Repair/Replace - Hoonah, AK Federal contract opportunity
Solicitation number
AG-0109-S-17-0005
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Question and Answers with photos

View the file

Other files for this federal contract opportunity

Other files attached to Bridge Remove/Repair/Replace - Hoonah, AK, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS-3.pdf PDF
Questions-Answers_AmendedSpec.pdf PDF
Attachment-3_LoadRatingRequirement.pdf PDF
Amendment_01.pdf PDF
Questions-Answers1.pdf PDF
Attachment-1_2017_Hoonah_Bridges_Signed_170222.pdf PDF
Attachment-2_Hoonah_Bridges_SuppSpecs.pdf PDF
AG-0109-S-17-0005_HoonahBridges.pdf PDF
Attachment-4_WageDeterminationAK7.pdf PDF
Attachment-5_Past_Performance_Worksheet.docx DOCX document
DRAFT_HoonahBridges_Drawings.pdf PDF
DRAFT_Hoonah_Bridges_SupplementalSpecs_170201.pdf PDF
DRAFT_StatementOfWork_HoonahBridges_170201.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0109-S-17-0005

BRIDGE REMOVE/REPAIR/REPLACE – HOONAH, ALASKA

QUESTIONS AND ANSWERS #1

March 26, 2017

Q1. At Rowan Bay are the bridges right there to grab or do we need to transport them?? What is the landing like there? Is there a dock? Is there a nice beach to land on with a Barge? Can I get pictures of facility?

A1. There is a low angle ramp, dock, and LTF at Rowan Bay. The dock is approx. ¼ mile from the ramp. The bridges are stored near the ramp. Ramp and float pictures attached.

Rowan Bay Float

Rowan Bay LTF

Q2. The 2 bridges we build in the field as long as they meet specs - all good?

A2. This question is unclear, but any bridges installed in performance of this contract must meet contract specifications.

Q3. Can we use Forest Service Cabin in Freshwater Bay once we get that far into wilderness?

A3. The Forest Service will not provide government housing for contractor use as part of contract terms.

Q4. Can we land certain equipment at Freshwater Bay as needed to complete the job?

A4. Yes, a sheet pile bulkhead and barge loading ramp are available at Freshwater Bay.

Q5. Would there be dismemberment of funds as we went to keep the project funded all the way through completion?

A5. Assuming you mean “disbursement of funds”, progress payments are allowed in accordance with the Payments Clause included in the solicitation. See Section I (52.232-5

Payments under Fixed-Price Construction Contracts – full text is available at www.acquisition.gov/far.

Q6. Are you planning on this year for this project??

A6. No. Period of performance for the base is from contract award through September 30, 2018. Awarding of Options will extend the period of performance for 60 days. See Section

F.1 and H.16 for project completion requirements. Also see Section H.4 for restrictions on in stream work.

Q7. Are there photos of the bridges in Rowan Bay?

A7. Photos are provided below.

http://www.acquisition.gov/far

Photos of the Western Wood Structures slab bridges at Rowan Bay are not available.